Moad Mohamed Alosta

Mr. Moad Mohamed Alosta

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 September 2022 in Materials
Verified
Journal Article
Open access
PDF file
SQShaker Qaidi
Shaker Qaidi
Hadee Mohammed NajmHadee Mohammed Najm
Hadee Mohammed Najm
SASuhad Mohammed Abd
Suhad Mohammed Abd
Yasin OzkilicYasin Ozkilic
Yasin Ozkilic
HDHusam Al dughaishi
Husam Al dughaishi
AMAbdalrhman Milad
Abdalrhman Milad
The safe disposal of an enormous amount of waste glass (WG) in several countries has become a severe environmental issue. In contrast, concrete production consumes a large amount of natural resources and contributes to environmental greenhouse gas emissions. It is widely known that many kinds of waste may be utilized rather than raw materials in the field of construction materials. However, for the wide use of waste in building construction, it is necessary to ensure that the characteristics of the resulting building materials are appropriate. Recycled glass waste is one of the most attractive waste materials that can be used to create sustainable concrete compounds. Therefore, researchers focus on the production of concrete and cement mortar by utilizing waste glass as an aggregate or as a pozzolanic material. In this article, the literature discussing the use of recycled glass waste in concrete as a partial or complete replacement for aggregates has been reviewed by focusing on the effect of recycled glass waste on the fresh and mechanical properties of concrete.

19 April 2023 in CivilEng
Verified
Journal Article
Open access
PDF file
AAAsiya Alawi
Asiya Alawi
AMAbdalrhman Milad
Abdalrhman Milad
DBDiego Barbieri
Diego Barbieri
MAMoad Mohamed Alosta
Moad Mohamed Alosta
George Uwadiegwu AlanemeGeorge Uwadiegwu Alaneme
George Uwadiegwu Alaneme
. Qadir Bux alias Imran Latif Qureshi. Qadir Bux alias Imran Latif Qureshi
. Qadir Bux alias Imran Latif Qureshi
Portland cement (PC) is a common material used in civil infrastructure engineering. Cement production emits roughly 2.2 billion tons of CO2 per year, contributing 8% of global emissions in 2016. This contributes to almost half of the calcination process, and together with thermal combustion, clinker generation could be responsible for 90% of the sector’s emissions. One effective technique for dealing with these industrial by-product wastes is to employ them to make cement replacements such as concrete and mortar, which can be used in a variety of applications. As a result, the purpose of this research is to review the current advancements, challenges, and future perspectives on the utilization of agro-industrial waste (AIW) produced around the world in cement-based products. Geopolymers (GPs), on the other hand, reduce carbon dioxide emissions and have the potential to be a complete or partial replacement for PC in the construction sector. The GP technology enables the use of AIW in combination with an alumina–silicate (A–S) phase with minimal environmental impact. GP-cement is mostly produced by activating alkali silicates or alkali sols with secondary raw materials such as calcined clays, fly ash (FA), zeolite, metakaolin, etc. Mixing various resource materials, including additives, A–S, and alkali sols, alkali concentrations, optimizing the curing temperature, the SiO2/Na2O ratio, microstructural behavior, and other factors, results in GP-cement with outstanding mechanical and durability characteristics. The review concludes that AIW-based geopolymer composites have shown promising results in terms of their mechanical properties, durability, and environmental sustainability, which makes them emerge as promising future building materials with applications in a wide range of industries.

1 April 2022 in Buildings
Verified
Journal Article
Open access
PDF file
MSMohmed Solla
Mohmed Solla
AEAhmed Elmesh
Ahmed Elmesh
ZMZubair Ahmed Memon
Zubair Ahmed Memon
LILokman Hakim Ismail
Lokman Hakim Ismail
Mohamed Faisal Al-KazeeMohamed Faisal Al-Kazee
Mohamed Faisal Al-Kazee
AMAbdalrhman Milad
Abdalrhman Milad
There is currently an increasing demand for Building Information Modelling (BIM) to be integrated into green projects. BIM is able to evaluate green building assessment tools by digitising and assessing buildings during their development stage. In Malaysia, the Green Building Index (GBI) promotes sustainability in the built environment. Six categories of criteria will be assessed in three of the certification stages. This study focuses on how BIM applications can digitise the GBI criteria for GBI processes. It examines BIM uses and tools of each GBI credit and defines the responsibility and role of construction stakeholders in using BIM to examine the assessment methods used for new non-residential building construction based on GBI. The primary method for data collection is the focus group interview which involves the groups of stakeholders involved in a BIM and GBI project. The result of the BIM–GBI assessment method showed that BIM could digitise and assess 25 credits in Design Assessment (DA), which can achieve 55 points of the total 100 points. This study helps stakeholders define the design team and facility manager’s roles to obtain GBI certification and maintain the certification during the building’s operation stage.

27 August 2025 in Discover Civil Engineering
Verified
Journal Article
Open access
PDF file
MSMohmed Solla
Mohmed Solla
DDDunia Derbi
Dunia Derbi
MAMoad Mohamed Alosta
Moad Mohamed Alosta
Mohamed Faisal Al-KazeeMohamed Faisal Al-Kazee
Mohamed Faisal Al-Kazee
Assoc. Prof. Dr. Gasim HayderAssoc. Prof. Dr. Gasim Hayder
Assoc. Prof. Dr. Gasim Hayder
AMAbdalrhman Milad
Abdalrhman Milad
Reliable cost estimation is paramount for successful projects, while in Libya, conventional methods are still inefficient, manual, and subject to human error. It examines integrating Building Information Modeling (BIM) with the Libyan Price Guidelines (LPG) to automate and improve the accuracy of cost estimation for building projects. A Revit-based BIM model was created and integrated with LPG data to generate real-time cost calculations and computerized quantity take-offs (QTO) to counter the inefficiencies in the existing manual system. A standardized questionnaire was administered among professionals in the Libyan construction sector and elicited 41 valid responses. Survey data analysis indicated very low BIM adoption and high usage of traditional estimating tools like spreadsheets. The suggested BIM–LPG approach was successful in mapping cost items with model elements in 74% of the cases in different categories in the construction field. Expert verification indicated the feasibility, practicability, and applicability of the approach, especially for enhanced estimation accuracy and elimination of routine manual activities. This work adds an automated cost estimation model specifically adapted for Libya’s construction scenario. It brings tangible value to quantity surveyors, cost estimators, project managers, and decision-makers through the improvement in cost control, the reduction of estimation inaccuracies, and real-time updates as project designs change. In the process, the work facilitates an overall movement toward the use of BIM in Libya, bringing local practices onto par with international standards for digitalized construction management.

1 January 2022 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
Jawad M Al lawatiJawad M Al lawati
Jawad M Al lawati
EEEce Erdogmus
Ece Erdogmus
DYDennis Young
Dennis Young
HDHusam Al dughaishi
Husam Al dughaishi
MAMoad Mohamed Alosta
Moad Mohamed Alosta
AMAbdalrhman Milad
Abdalrhman Milad
Push‐out‐shear tests were used in this study to analyze lag screw connections in timber‐concrete composite (TCC) slabs based on the embedment depth. The goal of this research is to look into the relationship between shear capacity and embedment depth in TCC, as well as to investigate the embedment strength of the wood. Experiments were carried out at different embedment depths (5.08 cm, 7.0 cm, and 8.9 cm). The prepared samples were examined in order to determine the failure modes and provide an accurate assessment of the influence of embedment depth on TCC slabs. The investigation on the embedment strength of the wood was performed then for the analysis of the crushing of wood fibers, lag screw yielding strength, and maximum load applied at embedment depths of 6.6 cm and 7.0 cm. The results indicate that between 5.08 cm and 7.0 cm, there was an apparent improvement in the relationship between embedment depth (ED) and shear capacity of TCC slabs in terms of the shear strength, while a significant difference was observed between 7.0 cm and 8.9 cm. The study suggests that the ED of the TCC slab should be maintained at around 7.33 times the diameter of the lag screw.

27 March 2023 in Applied Mechanics
Verified
Journal Article
Open access
PDF file
HDHusam Al dughaishi
Husam Al dughaishi
Jawad M Al lawatiJawad M Al lawati
Jawad M Al lawati
MAMoad Mohamed Alosta
Moad Mohamed Alosta
SMShaker Mahmood
Shaker Mahmood
Mohamed Faisal Al-KazeeMohamed Faisal Al-Kazee
Mohamed Faisal Al-Kazee
AMAbdalrhman Milad
Abdalrhman Milad
This study focused on identifying the most appropriate structural system for multi-story buildings and analyzing its response to lateral loads. The study analyzed and compared the different structural systems to determine the most suitable option. The study aims to utilize three lateral framing systems (moment, braced, and diagrid) in order to investigate which system needs the least amount of steel to meet the design requirements. Thus, in order to determine the estimated steel savings of this system as compared to the moment and braced frames, the four-story and eight-story buildings that are 96′ × 96′ in the plane and utilize moment frames, braced frame, and diagrid framing structural systems are presented. Based on the American Society of Civil Engineers (ASCE) 7–10, load combinations are considered for the designs, and the RAM structural analysis is used for the modeling and analysis of the structural systems. The findings of this study’s illustrations were the optimum for the analysis of wind of 176 kips and seismic loads of 122 kips, the building’s lateral displacements, which were the lowest at 0.045 inches, the story drift, the story stiffness, and the story shear for each structural system. In addition, the diagrid system also had the least amount of shear for all the stories, suggesting that it is better able to manage the lateral forces. These results indicate that the diagrid system is a more efficient structural system and can be recommended for use in multi-story buildings.