Yaping Ren

Dr. Yaping Ren

School of Intelligent Systems Science and Engineering, Institute of Physical Internet, Jinan University (Zhuhai Campus), Zhuhai 519000, China

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 December 2018 in IEEE Transactions on Industrial Informatics
Verified
Journal Article
Closed access
Guangdong TianGuangdong Tian
Guangdong Tian
YRYaping Ren
Yaping Ren
Yixiong FengYixiong Feng
Yixiong Feng
Mengchu ZhouMengchu Zhou
Mengchu Zhou
Honghao ZhangHonghao Zhang
Honghao Zhang
JTJianrong Tan
Jianrong Tan
Disassembly sequencing is important for remanufacturing and recycling used or discarded products. AND/OR graphs (AOGs) have been applied to describe practical disassembly problems by using “AND” and “OR” nodes. An AOG-based disassembly sequence planning problem is an NP-hard combinatorial optimization problem. Heuristic evolution methods can be adopted to handle it. While precedence and “AND” relationship issues can be addressed, OR (exclusive OR) relations are not well addressed by the existing heuristic methods. Thus, an ineffective result may be obtained in practice. A conflict matrix is introduced to cope with the exclusive OR relation in an AOG graph. By using it together with precedence and succession matrices in the existing work, this work proposes an effective triple-phase adjustment method to produce feasible disassembly sequences based on an AOG graph. Energy consumption is adopted to evaluate the disassembly efficiency. Its use with the traditional economical criterion leads to a novel dual-objective optimization model such that disassembly profit is maximized and disassembly energy consumption is minimized. An improved artificial bee colony algorithm is developed to effectively generate a set of Pareto solutions for this dual-objective disassembly optimization problem. This methodology is employed to practical disassembly processes of two products to verify its feasibility and effectiveness. The results show that it is capable of rapidly generating satisfactory Pareto results and outperforms a well-known genetic algorithm.

1 February 2019 in Journal of Cleaner Production
Verified
Journal Article
Closed access
LMLeilei Meng
Leilei Meng
CZChaoyong Zhang
Chaoyong Zhang
XSXinyu Shao
Xinyu Shao
YRYaping Ren
Yaping Ren

12 January 2016 in IEEE Transactions on Intelligent Transportation Systems
Verified
Journal Article
Open access
GTGuangdong Tian
Guangdong Tian
YRYaping Ren
Yaping Ren
MZMengChu Zhou
MengChu Zhou
It is complex and difficult to perform the emergency scheduling of forest fires in order to reduce the operational cost and improve the efficiency of extinguishing fire services. A new research issue arises when: 1) decision-makers want to minimize the number of rescue vehicles (or fire-fighting ones) while minimizing the extinguishing time; and 2) decision-makers prefer to complete this task given limited vehicle resources. To do so, this paper presents a novel multiobjective scheduling model to handle forest fires subject to limited rescue vehicle (fire engine) constraints, in which a fire-spread speed model is introduced into this problem to better describe practical forestry fire. Moreover, a Multiobjective Hybrid Differential-Evolution Particle-Swarm-Optimization (MHDP) algorithm is proposed to create a set of Pareto solutions for this problem. This approach is applied to a real-world emergency scheduling problem of the forest fire in Mt. Daxing'anling, China. Its effectiveness is verified by comparing it with a genetic algorithm and particle swarm optimization algorithm. Experimental results show that the proposed approach is able to quickly produce satisfactory Pareto solutions.

23 July 2018 in International Journal of Production Research
Verified
Journal Article
Closed access
LMLeilei Meng
Leilei Meng
CZChaoyong Zhang
Chaoyong Zhang
XSXinyu Shao
Xinyu Shao
YRYaping Ren
Yaping Ren
CRCaile Ren
Caile Ren
This paper investigates an energy-conscious hybrid flow shop scheduling problem with unrelated parallel machines (HFSP-UPM) with the energy-saving strategy of turning off and on. We first analyse the energy consumption of HFSP-UPM and formulate five mixed integer linear programming (MILP) models based on two different modelling ideas namely idle time and idle energy. All the models are compared both in size and computational complexities. The results show that MILP models based on different modelling ideas vary dramatically in both size and computational complexities. HFSP-UPM is NP-Hard, thus, an improved genetic algorithm (IGA) is proposed. Specifically, a new energy-conscious decoding method is designed in IGA. To evaluate the proposed IGA, comparative experiments of different-sized instances are conducted. The results demonstrate that the IGA is more effective than the genetic algorithm (GA), simulating annealing algorithm (SA) and migrating birds optimisation algorithm (MBO). Compared with the best MILP model, the IGA can get the solution that is close to an optimal solution with the gap of no more than 2.17% for small-scale instances. For large-scale instances, the IGA can get a better solution than the best MILP model within no more than 10% of the running time of the best MILP model.

3 July 2017 in International Journal of Production Research
Verified
Journal Article
Closed access
YRYaping Ren
Yaping Ren
DYDaoyuan Yu
Daoyuan Yu
CZChaoyong Zhang
Chaoyong Zhang
GTGuangdong Tian
Guangdong Tian
LMLeilei Meng
Leilei Meng
Xiaoqiang ZhouXiaoqiang Zhou
Xiaoqiang Zhou
Disassembly is indispensable to recycle and remanufacture end-of-life products, and a disassembly line-balancing problem (DLBP) is studied frequently. Recent research on disassembly lines has focused on a complete disassembly for optimising the balancing ability of lines. However, a partial disassembly process is widely applied in the current industry practice, which aims at reusing valuable components and maximising the profit (or minimising the cost). In this paper, we consider a profit-oriented partial disassembly line-balancing problem (PPDLBP), and a mathematical model of this problem is established, which is to achieve the maximisation of profit for dismantling a product in DLBP. The PPDLBP is NP-complete since DLBP is proven to be a NP-complete problem, which is usually handled by a metaheuristics. Therefore, a novel efficient approach based on gravitational search algorithm (GSA) is proposed to solve the PPDLBP. GSA is an optimisation technique that is inspired by the Newtonian gravity and the laws of motion. Also, two different scale cases are used to test on the proposed algorithm, and some comparisons with the CPLEX method, particle swarm optimisation, differential evolution and artificial bee colony algorithms are presented to demonstrate the excellence of the proposed approach.

1 September 2018 in European Journal of Operational Research
Verified
Journal Article
Closed access
YRYaping Ren
Yaping Ren
CZChaoyong Zhang
Chaoyong Zhang
FZFu Zhao
Fu Zhao
HXHuajun Xiao
Huajun Xiao
GTGuangdong Tian
Guangdong Tian