Sajjad Mubin

Prof. Dr. Sajjad Mubin


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 July 2023 in Buildings
Verified
Journal Article
Open access
PDF file
MAMuhammad Akhtar
Muhammad Akhtar
NMNadeem Ahmad Mufti
Nadeem Ahmad Mufti
SMSajjad Mubin
Sajjad Mubin
MSMuhammad Saleem
Muhammad Saleem
SZSadaf Zahoor
Sadaf Zahoor
SUSanna Ullah
Sanna Ullah
The public–private partnership (PPP) based model for the execution of infrastructure projects originated from Anglo-Saxon countries and was initially used in 1977 by the United Kingdom (U.K). Since then, its popularity has increased worldwide. Earlier studies by researchers and many other professional sectors and departments have introduced PPP contracts into different execution modes like Build, Operate, and Transfer (BOT); Build, Own, Operate, and Transfer (BOOT); and Build, Lease, and Transfer (BLT), etc. All definitions of PPP contracts are different but have a few common characteristics and risks. Previously, numerous pieces of literature were available on these common risks for various execution modes of PPP contracts. However, each PPP mode still has unique risks that must be identified to understand and successfully implement the PPP projects properly. This paper fills the gap mentioned above and aims to identify various commonly used PPP execution modes in infrastructure projects and their corresponding risks after placing the different PPP execution modes into four (04) different categories. Identified risks for the corresponding PPP categories were also divided into seven (07) stages of the PPP life cycle. Semi-structured interviews were conducted to gather information from thirty-four (34) PPP experts worldwide. Accordingly, interviews are transcribed and processed for thematic analysis in academic NVIVO software. These identified risks are further placed in the respective PPP category for the convenience and better understanding of the study’s outcome to the users and for the subsequent prioritization and allocation of these identified risks accordingly to the PPP parties during the finalization of the PPP execution mode.

1 July 2019 in Mehran University Research Journal of Engineering and Technology
Verified
Journal Article
Open access
PDF file
SMSajjad Mubin
Sajjad Mubin
SJShah Jahan
Shah Jahan
EGEkaterina Gavrishyk
Ekaterina Gavrishyk
HPP (Hydropower Projects) are very complex and risky in nature. For HPP, it is extremely important not only to identify risks but also to adopt proper mitigation measure to complete the project with in defined schedule and budget. Attempt has been made in this paper to identify critical risks associated with Dasu HPP and their mitigation measure to complete the project within predefined time and budget. The research methodology involved the questionnaire survey for identification of potential risks with their probabilities and impact. Pert-Master (Oracle Risk) software was used for simulation purposes. After feeding all data in the software, Monte Carlo simulation was run at 1,000 iterations to generate most probable duration of project, most probable cost of the project, critical risks sensitive to duration, critical risk sensitive to cost and statistically analyzed critical tasks/activities, which need due consideration for successful completion of project. Simulated schedule and budget was compared with planned one to find possible deviations, which may be eliminated by using mitigation measures proposed in the last section of the paper.

29 September 2022 in Buildings
Verified
Journal Article
Open access
PDF file
ZAZeeshan Ahmad
Zeeshan Ahmad
SMSajjad Mubin
Sajjad Mubin
RMRehan Masood
Rehan Masood
Fahim UllahFahim Ullah
Fahim Ullah
MKMalik Khalfan
Malik Khalfan
The public–private partnership (PPP) is a potential procurement strategy for delivering complex construction projects. However, implementing PPPs has not been explored extensively in developing countries like Pakistan. A performance framework is developed in this study to evaluate the application of PPP projects based on 10 key performance indicators (KPIS) and 41 performance measures (PMS). This framework was reviewed by experts for coverage and relevance, then validated through two case studies involving road construction. A triangulation approach was adopted to collect the relevant data through multiparty focus group sessions, archives, and site observations, which enhances the reliability of the data. Results showed there is a difference in performance for six KPIS, but similar practices were reported for four KPIS. The developed performance evaluation framework (PEF) for PPP projects is suitable for developing countries transitioning toward adopting this procurement strategy.

Verified
Journal Article
Open access
PDF file
AIAmna Iqbal
Amna Iqbal
SMSajjad Mubin
Sajjad Mubin
EGEkaterina Gavrishyk
Ekaterina Gavrishyk
RMRehan Masood
Rehan Masood
Krishanu RoyKrishanu Roy
Krishanu Roy
MBMilad Bistouni
Milad Bistouni
Globally, the building sector consumes approximately 60% of the total energy usage, while the energy consumption of residential buildings lies between 20% to 40%. The majority of this energy is operational energy, which comes mainly from the heating and cooling of houses. Innovative and cost-effective insulation materials have the potential to reduce the operational energy requirements and can therefore make the buildings more energy efficient. In this study, three commonly available insulation materials were experimentally evaluated for a case study of residential buildings, located in a cold region of Pakistan. Glass wool, extruded polystyrene, and polyethylene were used, as insulation materials, for monitoring the case study building performance. Thermal data were collected for 21 days in the year 2019 using a Testo Saveries System and were then used for analyzing the thermal performance of each of the three types of insulation materials. Other relevant data including the cost of insulation materials, thickness, ease of application, design life, and fire resistance of the selected insulation materials were obtained for broader (based on the scorecard) analysis based on a multi-weighted decision model. It was concluded that Polyethylene was the most economical insulation material amongst the others, which also showed the best thermal performance. Polyethylene was also found to be the best insulation material for the case study building based on a multi-weighted decision model and, hence, is recommended for application in buildings around cold regions of Pakistan.

9 March 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
SASafeer Abbas
Safeer Abbas
FJFarwa Jabeen
Farwa Jabeen
AFAdeel Faisal
Adeel Faisal
Moncef L. NehdiMoncef L. Nehdi
Moncef L. Nehdi
Syed Minhaj Saleem KazmiSyed Minhaj Saleem Kazmi
Syed Minhaj Saleem Kazmi
Muhammad Junaid MunirMuhammad Junaid Munir
Muhammad Junaid Munir
The alkali–silica reaction (ASR) is a primary cause for premature concrete degradation. An accelerated mortar bar test is often used to access the detrimental phenomena in concrete caused by the ASR of aggregates. However, this test requires a certain environmental conditioning as per ASTM C1260. The objective of this study is to explore the effects of the cement alkali content, exposure solution concentration, temperature, and test duration on mortar bar expansion. Factorial experimental design and analysis was conducted to delineate the effects of the individual factors as well as their interaction. Five different aggregates with various mineralogical properties were used, representing reactive and non-reactive aggregates. Various dosages of cement alkalis (0.40, 0.80, and 1.20 Na2Oe), sodium hydroxide (NaOH) solution concentrations (0.5, 1.0, and 1.5 N), and temperature (40 °C, 80 °C, and 100 °C) were the studied variables. Mortar bar expansion was measured at 3, 7, 14, 21, 28, 56, and 90 days. Mortar bars incorporating Jhelum aggregates incurred expansion of 0.32% at 28 days, proving to be reactive aggregates as per ASTM C1260. Similarly, specimens incorporating Taxila aggregates showed expansion of 0.10% at 28 days, indicating non-reactive nature. It was observed that specimens with Sargodha aggregates showed expansion of 0.27% at 28 days for 0.50 N NaOH solution concentration compared to 0.31% expansion for identical specimens exposed to 1.5 N solution. Moreover, expansion increased with exposure duration for all the tested specimens. Experimental results showed that the cement alkali contents had relatively lesser effect on expansion for 1.0 N NaOH; while, in the case of 0.5 N and 1.5 N NaOH, the cement alkali had a significant effect. It was noted that expansion increased with an increase in the temperature. Jhelum aggregates showed 28-day expansion of 0.290% when exposed to 40 °C, but at a temperature of 100 °C, expansion increased to 0.339%. Factorial analysis revealed that the exposure solution had a major contribution towards the expansion of mortar bar specimens. This study highlights the contribution of various exposure conditions on the ASR expansion, which leads to a decisive role in selecting the aggregate sources for various applications and exposure conditions leading to sustainable construction.

1 June 2020 in Independent Journal of Management & Production
Verified
Journal Article
Open access
PDF file
MIMaria Idrees
Maria Idrees
FQFarah Nawaz Qureshi
Farah Nawaz Qureshi
KAKafeel Ahmad
Kafeel Ahmad
SMSajjad Mubin
Sajjad Mubin
Different types of fibers impart specific characteristics to concrete, including crack bridging, early age crack resistance, ductility, toughness, strength, and loss of workability. It seems that if these fibers are combined, then specific characteristics of each fiber may be imparted to concrete and the desired characteristics of the concrete composite may be achieved. Thus, this investigation has been conducted to study the properties of concrete composites composed of four different types of fibers used singly or in hybrid form. The effectiveness of hybrid fibers in cementitious composites to achieve better characteristics; strengths, toughness, workability, and cost, was investigated and compared. Composites made of carbon fiber, plain steel fiber, polypropylene fiber, and glass fiber and their hybrid combinations (2, 3 and 4 fibers mixed), at constant volume of fiber 1.25%, along 4% styrene-butadiene rubber latex and 1.5% superplasticizer, are prepared and tested. The composites are compared and investigated for their feasibility in terms of their properties and cost. The comparison showed the suitability of some bi-hybrid composites, and incompatibility of tri-hybrid and tetra-hybrid composites in terms of effectiveness and feasibility.