Ruitong Yang

Dr. Ruitong Yang

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications

27 June 2024 in Energy and Buildings
Verified
Journal Article
Closed access
WHWanyu Hu
Wanyu Hu
YDYanjiao Duan
Yanjiao Duan
DLDong Li
Dong Li
CZChengjun Zhang
Chengjun Zhang
HYHui Yang
Hui Yang
RYRuitong Yang
Ruitong Yang

24 August 2023 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
RYRuitong Yang
Ruitong Yang
DLDong Li
Dong Li
Muslum AriciMuslum Arici
Muslum Arici
SSSamanta López Salazar
Samanta López Salazar
YWYangyang Wu
Yangyang Wu
ÇYÇağatay Yıldız
Çağatay Yıldız

26 September 2024 in Energy and Buildings
Verified
Journal Article
Closed access
DLDong Li
Dong Li
YDYanjiao Duan
Yanjiao Duan
CZChengjun Zhang
Chengjun Zhang
WHWanyu Hu
Wanyu Hu
XYXinpeng Yang
Xinpeng Yang
XWXueyang Wang
Xueyang Wang

20 May 2024 in Energies
Verified
Journal Article
Open access
PDF file
RYRuitong Yang
Ruitong Yang
Wang FuqiangWang Fuqiang
Wang Fuqiang
Zhonghao RaoZhonghao Rao
Zhonghao Rao
Zhao ShenZhao Shen
Zhao Shen
Dong LiDong Li
Dong Li
The transition to clean and low-carbon energy sources is an imperative driven by the urgent challenges of climate change, energy security, and environmental sustainability

17 July 2024 in Processes
Verified
Journal Article
Open access
PDF file
MXMeng Xu
Meng Xu
MGMeng Gao
Meng Gao
RYRuitong Yang
Ruitong Yang
KWKeping Wang
Keping Wang
哲袁哲 袁
哲 袁
This study presents an economic optimization model for determining the optimal insulation thickness for both thermal insulation and electric tracing pipelines. Using Life-Cycle Cost (LCC) analysis, optimization research was conducted under various working conditions to identify the most cost-effective insulation thickness. Factors such as pipe diameter, operational duration, drilling fluid temperature, and heat cost were analyzed to assess their impact on the economic thickness of the insulation layer, specifically within the unique environment of drilling sites. The results provide the economic thickness and total cost for both insulated and electrically traced pipelines under different scenarios. For instance, for a DN100 pipe with rock wool insulation operating for 3600 h, the economic thickness of the electrically traced pipe insulation was determined to be 5.18 cm greater per unit length compared to the non-electrically traced pipe, resulting in an additional cost of 19.36 CNY/m. These findings offer valuable insights for optimizing pipeline insulation in drilling applications.