This paper proposes a solution to the problem of improving the reliability of the operation of progressive cavity pump units in deviated and directional wells. High dogleg severity significantly contributes to rod breakage; rods often break close to the “elbows” with a dogleg severity of 2 deg/10 m or higher. Statistical analyses were used to identify the frequency of failures and their impact on the reliability of a PCP unit. The design layout and mathematical model for pump rods’ torsional vibrations in the curved section of a wellbore were developed. A simulation of the curved section was performed. This article provides the basic formulas needed to design a rotating rod string using two reduced discs. The creation of an additional crooked section resulted in multiple reductions in the “resonant” rotational speed and rigidity in the mathematical model. Determining the moment of inertia of the reduced discs’ mass made it possible to determine the sucker-rod string’s stiffness, the circular rotation frequency, and the number of sucker-rod revolutions under resonance. The number of reduced discs on the sucker-rod string depends on the curvature pattern. In summary, a centralizer for a rotating string was designed to reduce the vibration and shock effects of rods on the tubing.
Implementation of SWAG technology by means of water-gas mixtures is a promising method of enhanced oil recovery. The use of associated petroleum gas as a gas component in the water-gas mixture allows to significantly reduce the amount of irrationally consumed gas and carbon footprint. Relevant task is to choose a simple, reliable and convenient equipment that can operate under rapidly changing operating conditions. Such equipment are pump-ejector systems. In order to create water-gas mixture it is proposed to use associated gas from the annulus space. This solution will reduce the pressure in the annulus space of the production well, prevent supply disruption and failure of well equipment. The paper presents a principal technological scheme of the pump-ejector system, taking into account the withdrawal of gas from the annulus space of several production wells. The layout of the proposed system enables more efficient implementation of the proposed technology, which expands the area of its application. Experimental investi-gations of pressure and energy characteristics of the ejector have been carried out. Analysis of the obtained data showed that it was possible to increase the value of maximum efficiency. The possibility of adapting the system in a wide range of changes in operating parameters has been established. Recommendations on selection of a booster pump depending on the values of working pressure and gas content are given.
This paper highlights field studies to determine the nature of variations in the load on the sucker-rod string during short-term gas extraction from the wellbore annulus. The results of step-by-step gas extraction from the annular spaces of the wells of fields developed by PJSC TATNEFT are provided. In the course of investigations, we have obtained both the trends of maximum and minimum loads on the polished rod during annular gas extraction, and the dependence of maximum load increment on the rod string with respect to pump size and pressure variation in the annular space. The analysis of the research data resulted in the elaboration of guidelines for short-term extraction of annular gas from wells operated by the PCP units.
1 November 2019 in IOP Conference Series: Materials Science and Engineering
The aim of this article is the practical application of calculation methodology of water and gas volume injection into the reservoir and optimal parameters of water and gas mixture in Samodurovskoe field in Russia. Calculations were performed using two technologies: water alternating gas (WAG) and simultaneous water and gas injection (SWAG). For each case the optimum volume of water and gas mixture and its components which are injected into the reservoir was calculated. The variant of alternative water and gas injection cannot be applied in oilfield because of existing restriction to maximum flowrate of associated gas in standard conditions. In Samodurovskoe field can be applied water-alternated-gas (WAG) technology. Proper array of gas and water ration phases in reservoir condition with account of associated gas usage was calculated. Optimization of water-gas mixture volume ratio components showed that the biggest effectiveness of oil recovery cannot be reached resulting from abovementioned restriction. This calculation methodology can be used in job execution, it is simple and practical.
1 January 2019 in Neftyanoe khozyaystvo - Oil Industry