Min Gong

Prof. Min Gong


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 March 2023 in International Journal of Minerals, Metallurgy and Materials
Verified
Journal Article
Closed access
PDF file
HWHaojun Wu
Haojun Wu
MGMin Gong
Min Gong
RYRenshu Yang
Renshu Yang
XWXiaodong Wu
Xiaodong Wu
XLXiangyu Liu
Xiangyu Liu

30 November 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XWXiaodong Wu
Xiaodong Wu
YLYu Li
Yu Li
MGMin Gong
Min Gong
HWHaojun WU
Haojun WU
YWYifan Wu
Yifan Wu
The construction method of transitioning from a small cross-section to excavating a super-large cross-section tunnel plays a crucial role in the quality of the final super-large cross-section tunnel and the safety of the tunnel structures and workers during the construction process. The Shenzhen Liantang Bifurcated Tunnel, with a maximum cross-sectional area of 428.4 m2, was the largest cross-sectional tunnel constructed in China in 2018, and there are few engineering projects that can serve as references. To enhance construction safety and achieve the transformation from a two-lane tunnel to a five-lane tunnel, this paper proposes two tunneling methods, namely, the reverse top-heading method and the advance climbing method. Moreover, numerical simulation using MIDAS GTS/NX software was adapted to compare and analyze the stress and deformation characteristics of the surrounding rock in the construction stages using the two methods. The simulation shows that the advance climbing method is more suitable for the construction of the Liantang tunnel. Through on-site monitoring and measurement, the data of peripheral rock vault subsidence, peripheral convergence, and pressure of the supporting structure were assessed. The results show that the maximum values of peripheral rock vault subsidence and peripheral convergence displacement are located in the permissible range of road tunnel vault subsidence. This further verifies the reasonableness of the advance climbing method. This paper not only provide a basis for the construction of the Liantang tunnel but also serves as a reference for construction methods and typical cases for similar super-large-section tunnel projects.

9 June 2025 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
SWSijie Wang
Sijie Wang
MGMin Gong
Min Gong
HWHaojun Wu
Haojun Wu
XWXiaodong Wu
Xiaodong Wu
XXXiaodong Xu
Xiaodong Xu

Verified
Journal Article
Open access
PDF file
XWXiaodong Wu
Xiaodong Wu
XMXiaomeng Miao
Xiaomeng Miao
MGMin Gong
Min Gong
JSJunpeng Su
Junpeng Su
YZYaqi Zhu
Yaqi Zhu
XCXiaolei Chen
Xiaolei Chen
Coastal underground engineering projects are prone to seawater intrusion during blasting operations, posing significant risks to the safety of construction personnel and the structural integrity of the projects. To ensure the safety of blasting operations in areas at risk of seawater intrusion, this study focuses on a section of a coastal tunnel that is at risk of such intrusion. Using fracture mechanics theory and silo theory analysis methods, the minimum safe distance between the workface and the fault to prevent seawater intrusion is determined. Numerical simulations are employed to analyze the dynamic response of the surrounding rock and the attenuation of vibrations as blasting excavation progresses near the fault-controlled zone. This study also explores the impact of dynamic excavation on fault stability. By employing a regression analysis, this study establishes quantitative relationships between the amount of explosive used and the peak particle velocity (PPV) at different distances, as well as between the range of rock damage and PPV at various distances. This analysis allows for the determination of a safe PPV threshold to prevent seawater intrusion in the fault-controlled area. The accuracy of the computational model is validated using field-measured data. Finally, an optimized blasting design and strategy based on electronic detonator initiation are proposed for the control area, ensuring construction safety. This study provides theoretical and technical references for achieving safe and efficient blasting excavation in coastal underground engineering projects.

28 July 2024 in Processes
Verified
Journal Article
Open access
PDF file
XWXiaodong Wu
Xiaodong Wu
JJJiayin Jia
Jiayin Jia
LWLikun Wang
Likun Wang
SZShijun Zhou
Shijun Zhou
HWHaojun WU
Haojun WU
MGMin Gong
Min Gong
Current tunnel blasting hole layouts are mostly designed based on a two-dimensional plane at the workface, without considering the distribution of the minimum burden at the bottom of the blast holes. This results in a significant number of residual holes at the bottom, reducing excavation efficiency. To address this issue, this study proposes an easer hole design method based on the principle of minimum burden at the hole bottom. The method involved the arithmetic distribution for the minimum burden at the bottom of easer holes, using the difficulty of rock breaking as the design principle for hole positioning. Through theoretical analysis, numerical simulation, and field tests, it is proposed that the minimum burden at the bottom of the holes should increase progressively with the initiation sequence, and the relationship between burden distribution and blasting effect was investigated. This study indicates that using the new design principle achieves better blasting results than the model with an evenly distributed burden. When the control ratio of the minimum burden at the bottom of each row of easer holes is 1.3, an average residual hole depth of 36.7 cm and a maximum damage volume of 4.638 m3 can be achieved, yielding the best overall blasting effect. The application of this blasting scheme in the field significantly improved the residual hole problem, reducing the average residual hole depth to 39.5 cm, which is a 43.4% reduction compared to the previous scheme. Additionally, the utilization rate of blast holes in the new scheme increased to 91.3%, an improvement of 11.0% over the previous scheme. This study provides new insights and methods for tunnel blasting hole layout design, offering significant engineering application value.

27 February 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XWXiaodong Wu
Xiaodong Wu
MGMin Gong
Min Gong
HWHaojun WU
Haojun WU
During the drilling and blasting excavation of neighborhood tunnels, blast-induced vibrations negatively affect the stability of the interlaid rock, particularly for the following tunnel. This paper presents a case study of neighborhood tunnels with small clearance in Shenzhen, China, where the minimum thickness of interlaid rock is only 0.5 m. Therefore, the tunnelling method of the following tunnel should be precisely designed to ensure the safety of surrounding rock. Initially, we investigated the damage mechanism of the interlaid rock under the blasting load from the following tunnel using LS-DYNA R11.1 software. To control the damage of the interlaid rock caused by the following tunnel blasting, the four-part excavation method with a reserved vibration-cushioning layer for the following tunnel is proposed. Subsequently, the analytical stress of the surrounding rock for neighborhood tunnels was obtained by the Schwarz alternating method (SAM). By analyzing the variation patterns with different thicknesses of the cushioning layer, the optimal thickness of the cushioning layer was determined to be 3.0 m. Consequently, a safety excavation partition scheme was implemented for the following tunnel. As a result of this case study, suggestions were identified for the safe excavation of neighborhood tunnels with small clearance.