Xiaodong Wu

Dr. Xiaodong Wu

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 November 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XWXiaodong Wu
Xiaodong Wu
YLYu Li
Yu Li
MGMin Gong
Min Gong
HWHaojun WU
Haojun WU
YWYifan Wu
Yifan Wu
The construction method of transitioning from a small cross-section to excavating a super-large cross-section tunnel plays a crucial role in the quality of the final super-large cross-section tunnel and the safety of the tunnel structures and workers during the construction process. The Shenzhen Liantang Bifurcated Tunnel, with a maximum cross-sectional area of 428.4 m2, was the largest cross-sectional tunnel constructed in China in 2018, and there are few engineering projects that can serve as references. To enhance construction safety and achieve the transformation from a two-lane tunnel to a five-lane tunnel, this paper proposes two tunneling methods, namely, the reverse top-heading method and the advance climbing method. Moreover, numerical simulation using MIDAS GTS/NX software was adapted to compare and analyze the stress and deformation characteristics of the surrounding rock in the construction stages using the two methods. The simulation shows that the advance climbing method is more suitable for the construction of the Liantang tunnel. Through on-site monitoring and measurement, the data of peripheral rock vault subsidence, peripheral convergence, and pressure of the supporting structure were assessed. The results show that the maximum values of peripheral rock vault subsidence and peripheral convergence displacement are located in the permissible range of road tunnel vault subsidence. This further verifies the reasonableness of the advance climbing method. This paper not only provide a basis for the construction of the Liantang tunnel but also serves as a reference for construction methods and typical cases for similar super-large-section tunnel projects.

28 March 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
SWSijie Wang
Sijie Wang
MGMin GONG
Min GONG
HWHaojun Wu
Haojun Wu
XWXiaodong Wu
Xiaodong Wu
XLXiangyu Liu
Xiangyu Liu
In tunnel smooth blasting, optimizing the water interval charging structure of peripheral holes is of great significance in improving the effect of smooth blasting and reducing the unit consumption of explosives. Addressing the issue of a single traditional evaluation standard, this paper proposes a composite index evaluation method for rock blasting damage in different zones, and the best charging structure is optimized according to the evaluation results. Taking Liyue Road Tunnel Light Smooth Blasting Project in Chongqing as the Research Background, the numeric models were established with ten kinds of charge structures, the charge structures and explosive quantity were optimized according to the evaluation results, and then the field tests were conducted. The results show that when the length of the water medium at the bottom of the hole is 20 cm, the damage range of the retained rock mass can be controlled while ensuring rock fragmentation. If the length of the water medium at the orifice and in the center of the hole is more than 30 cm, it will affect the superposition effect of the blast stress wave, resulting in under-excavation; in the preferred charge structure, the ratio of the length of the upper and lower explosives reaches 1:3, and the ratio of the length of the water medium is 2:2:1, which achieves a better rock-breaking effect in the field test.

20 November 2022 in Energies
Verified
Journal Article
Open access
PDF file
HWHaojun Wu
Haojun Wu
MGMin GONG
Min GONG
XWXiaodong Wu
Xiaodong Wu
YGYang Guo
Yang Guo
Different types of deep-hole blasting techniques are needed to solve gas drainage problems in complex and variable cases. Blasting parameters suitable for mines are selected based on the relationship between blast stress field changes and gas flow combined with field application and numerical simulation. The Datong Mine was a background to study the blast crush zone and drainage influence range following deep-hole blasting with holes laid in coal seams, which resulted in a 24% increase in gas flow in the drainage hole 6 m from the blast hole. In response to the difficulty of forming blast holes in the soft coal seam of the Yuyang Mine, drilling and blasting in the floor rock stratum adjacent to the coal seam increased the gas flow in the drainage holes by 125%. When applying the deep-hole technique with holes crossing multi-seams for gas drainage in Shiping Mine, the volume of gas drainage increases significantly with increased effective stress in the drainage hole. For example, when the spacing at the hole’s bottom between the blast hole and the drainage hole is 4.6 m, the volume of gas drainage increases by 3.3 times, compared with 8.8 m. Twenty-six protruding mines in southern China have applied the above deep-hole pre-splitting blasting technology, all of which have achieved good results and are of great significance to future applications in multiple fields, such as gas control.

Verified
Journal Article
Open access
PDF file
XWXiaodong Wu
Xiaodong Wu
XMXiaomeng Miao
Xiaomeng Miao
MGMin Gong
Min Gong
JSJunpeng Su
Junpeng Su
YZYaqi Zhu
Yaqi Zhu
XCXiaolei Chen
Xiaolei Chen
Coastal underground engineering projects are prone to seawater intrusion during blasting operations, posing significant risks to the safety of construction personnel and the structural integrity of the projects. To ensure the safety of blasting operations in areas at risk of seawater intrusion, this study focuses on a section of a coastal tunnel that is at risk of such intrusion. Using fracture mechanics theory and silo theory analysis methods, the minimum safe distance between the workface and the fault to prevent seawater intrusion is determined. Numerical simulations are employed to analyze the dynamic response of the surrounding rock and the attenuation of vibrations as blasting excavation progresses near the fault-controlled zone. This study also explores the impact of dynamic excavation on fault stability. By employing a regression analysis, this study establishes quantitative relationships between the amount of explosive used and the peak particle velocity (PPV) at different distances, as well as between the range of rock damage and PPV at various distances. This analysis allows for the determination of a safe PPV threshold to prevent seawater intrusion in the fault-controlled area. The accuracy of the computational model is validated using field-measured data. Finally, an optimized blasting design and strategy based on electronic detonator initiation are proposed for the control area, ensuring construction safety. This study provides theoretical and technical references for achieving safe and efficient blasting excavation in coastal underground engineering projects.

6 October 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HWHaojun Wu
Haojun Wu
MGMin GONG
Min GONG
QZQing Zhao
Qing Zhao
XWXiaodong Wu
Xiaodong Wu
XLXiangyu Liu
Xiangyu Liu
Cut blasting creates new free surfaces that facilitate rock breaking and reduces blast vibration. However, the time when the new free surface is formed is not clear in on-site blasting practices. This paper proposes a method to identify this formation time through a vibration energy comparison. Firstly, a variational mode decomposition method identified the initiation time sequence of high-precision detonators from the observed blast-induced vibration wave. Based on the superposition of the single-hole waves extracted from the single-free-surface blasting test, we constructed a predicted wave that shared the initiation time sequence with the observed one. The Hilbert transform found the accumulated energy curves of the two waves separately. By comparing the linear correlation of the two curves, we identified the new free surface’s formation time to improve the blast design. The tunnel-blasting case showed that 64.5 ms was required to form the new free surface. In the actual blasting, each cut hole used 1.0 kg of explosives. The maximum vibration velocity was 0.90 cm·s−1, which met the control target of less than 1.0 cm·s−1.

23 April 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
SWSijie Wang
Sijie Wang
HWHaojun WU
Haojun WU
MGMin GONG
Min GONG
XWXiaodong Wu
Xiaodong Wu
The adjustment of delay time in open-pit bench blasting is a research hotspot in vibration control. Its core lies in utilizing the periodic characteristics of vibration waves to achieve the superposition and cancellation of wave peaks and troughs. However, due to the spatiotemporal variability in the propagation of blast-induced vibration waves, the optimal delay time determined for vibration control requirements at a specific protected area (monitoring point) makes it difficult to achieve the misalignment superposition effect simultaneously at multiple monitoring points. To address the challenge of multi-area vibration control in open-pit bench blasting, this paper proposes an adjustment method based on local delay adjustment. First, a spatiotemporal relationship model between blast holes with monitoring points is established to calculate vibration wave arrival times. This enables rapid hole identification during dense wave arrivals at monitoring points, with waveform separation achieved through initiation delay adjustments. Following the Anderson principle, reconstructed single-hole vibrations are superimposed according to the wave arrival sequence to validate control efficacy. Statistical analysis of concurrent wave arrivals across all-direction monitoring points identifies high-probability vibration hazard locations. Targeted delay adjustments for blast holes within clustering arrival periods at these locations enable comprehensive vibration reduction. Field data confirm that single-point control reduces peak vibration by >10.55% through simultaneously reducing the amount of waves in clustering arrival periods. Multi-point control resolves seven hazard locations across two directions, attaining 88.57% hazard elimination efficiency and 14.05% peak velocity attenuation. This method achieves vibration control through local delay adjustments while maintaining the fragmentation effect of the original scheme, providing a new approach to solving the challenge of vibration control in large-scale blasting areas.