Haojun WU

Dr. Haojun WU


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 November 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XWXiaodong Wu
Xiaodong Wu
YLYu Li
Yu Li
MGMin Gong
Min Gong
HWHaojun WU
Haojun WU
YWYifan Wu
Yifan Wu
The construction method of transitioning from a small cross-section to excavating a super-large cross-section tunnel plays a crucial role in the quality of the final super-large cross-section tunnel and the safety of the tunnel structures and workers during the construction process. The Shenzhen Liantang Bifurcated Tunnel, with a maximum cross-sectional area of 428.4 m2, was the largest cross-sectional tunnel constructed in China in 2018, and there are few engineering projects that can serve as references. To enhance construction safety and achieve the transformation from a two-lane tunnel to a five-lane tunnel, this paper proposes two tunneling methods, namely, the reverse top-heading method and the advance climbing method. Moreover, numerical simulation using MIDAS GTS/NX software was adapted to compare and analyze the stress and deformation characteristics of the surrounding rock in the construction stages using the two methods. The simulation shows that the advance climbing method is more suitable for the construction of the Liantang tunnel. Through on-site monitoring and measurement, the data of peripheral rock vault subsidence, peripheral convergence, and pressure of the supporting structure were assessed. The results show that the maximum values of peripheral rock vault subsidence and peripheral convergence displacement are located in the permissible range of road tunnel vault subsidence. This further verifies the reasonableness of the advance climbing method. This paper not only provide a basis for the construction of the Liantang tunnel but also serves as a reference for construction methods and typical cases for similar super-large-section tunnel projects.

23 April 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
SWSijie Wang
Sijie Wang
HWHaojun WU
Haojun WU
MGMin GONG
Min GONG
XWXiaodong Wu
Xiaodong Wu
The adjustment of delay time in open-pit bench blasting is a research hotspot in vibration control. Its core lies in utilizing the periodic characteristics of vibration waves to achieve the superposition and cancellation of wave peaks and troughs. However, due to the spatiotemporal variability in the propagation of blast-induced vibration waves, the optimal delay time determined for vibration control requirements at a specific protected area (monitoring point) makes it difficult to achieve the misalignment superposition effect simultaneously at multiple monitoring points. To address the challenge of multi-area vibration control in open-pit bench blasting, this paper proposes an adjustment method based on local delay adjustment. First, a spatiotemporal relationship model between blast holes with monitoring points is established to calculate vibration wave arrival times. This enables rapid hole identification during dense wave arrivals at monitoring points, with waveform separation achieved through initiation delay adjustments. Following the Anderson principle, reconstructed single-hole vibrations are superimposed according to the wave arrival sequence to validate control efficacy. Statistical analysis of concurrent wave arrivals across all-direction monitoring points identifies high-probability vibration hazard locations. Targeted delay adjustments for blast holes within clustering arrival periods at these locations enable comprehensive vibration reduction. Field data confirm that single-point control reduces peak vibration by >10.55% through simultaneously reducing the amount of waves in clustering arrival periods. Multi-point control resolves seven hazard locations across two directions, attaining 88.57% hazard elimination efficiency and 14.05% peak velocity attenuation. This method achieves vibration control through local delay adjustments while maintaining the fragmentation effect of the original scheme, providing a new approach to solving the challenge of vibration control in large-scale blasting areas.

28 July 2024 in Processes
Verified
Journal Article
Open access
PDF file
XWXiaodong Wu
Xiaodong Wu
JJJiayin Jia
Jiayin Jia
LWLikun Wang
Likun Wang
SZShijun Zhou
Shijun Zhou
HWHaojun WU
Haojun WU
MGMin Gong
Min Gong
Current tunnel blasting hole layouts are mostly designed based on a two-dimensional plane at the workface, without considering the distribution of the minimum burden at the bottom of the blast holes. This results in a significant number of residual holes at the bottom, reducing excavation efficiency. To address this issue, this study proposes an easer hole design method based on the principle of minimum burden at the hole bottom. The method involved the arithmetic distribution for the minimum burden at the bottom of easer holes, using the difficulty of rock breaking as the design principle for hole positioning. Through theoretical analysis, numerical simulation, and field tests, it is proposed that the minimum burden at the bottom of the holes should increase progressively with the initiation sequence, and the relationship between burden distribution and blasting effect was investigated. This study indicates that using the new design principle achieves better blasting results than the model with an evenly distributed burden. When the control ratio of the minimum burden at the bottom of each row of easer holes is 1.3, an average residual hole depth of 36.7 cm and a maximum damage volume of 4.638 m3 can be achieved, yielding the best overall blasting effect. The application of this blasting scheme in the field significantly improved the residual hole problem, reducing the average residual hole depth to 39.5 cm, which is a 43.4% reduction compared to the previous scheme. Additionally, the utilization rate of blast holes in the new scheme increased to 91.3%, an improvement of 11.0% over the previous scheme. This study provides new insights and methods for tunnel blasting hole layout design, offering significant engineering application value.

27 February 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XWXiaodong Wu
Xiaodong Wu
MGMin Gong
Min Gong
HWHaojun WU
Haojun WU
During the drilling and blasting excavation of neighborhood tunnels, blast-induced vibrations negatively affect the stability of the interlaid rock, particularly for the following tunnel. This paper presents a case study of neighborhood tunnels with small clearance in Shenzhen, China, where the minimum thickness of interlaid rock is only 0.5 m. Therefore, the tunnelling method of the following tunnel should be precisely designed to ensure the safety of surrounding rock. Initially, we investigated the damage mechanism of the interlaid rock under the blasting load from the following tunnel using LS-DYNA R11.1 software. To control the damage of the interlaid rock caused by the following tunnel blasting, the four-part excavation method with a reserved vibration-cushioning layer for the following tunnel is proposed. Subsequently, the analytical stress of the surrounding rock for neighborhood tunnels was obtained by the Schwarz alternating method (SAM). By analyzing the variation patterns with different thicknesses of the cushioning layer, the optimal thickness of the cushioning layer was determined to be 3.0 m. Consequently, a safety excavation partition scheme was implemented for the following tunnel. As a result of this case study, suggestions were identified for the safe excavation of neighborhood tunnels with small clearance.