CEROVŠEK Tomo

Prof. Dr. CEROVŠEK Tomo


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 February 2022 in Buildings
Verified
Journal Article
Open access
PDF file
LSLihnida Stojanovska-Georgievska
Lihnida Stojanovska-Georgievska
Ivana SandevaIvana Sandeva
Ivana Sandeva
AKAleksandar Krleski
Aleksandar Krleski
HSHristina Spasevska
Hristina Spasevska
MGMargarita Ginovska
Margarita Ginovska
TFTomas Funtik
Tomas Funtik
The building sector nowadays has come to the stage where it needs a “digital” renovation. This is to be accomplished by an introduction of change into the methodology of construction and using new tools and technologies, such as BIM technology. This paper gives an insight into the status of BIM adoption in North Macedonia. It presents the threefold actions toward introduction of BIM in the national construction industry. These actions refer to scanning the current situation regarding digitalization of the sector, then taking promotional actions to express the benefits of BIM, and finally identifying and proposing the most suitable measures, summarized in the proposal of the National Roadmap for BIM adoption. The methods used consist of a brief literature review of the global status of BIM development. Then, the results of a survey conducted on more than 300 respondents representing a sample of building professionals in the country are discussed, and the barriers for successful BIM adoption are accordingly identified. The next step is to showcase the potential benefits of BIM for assessment of energy performance of buildings. As a final point, the conclusions drafted toward identification of the most important challenges are addressed in the proposed National Roadmap for BIM adoption.

19 December 2021 in Buildings
Verified
Journal Article
Open access
PDF file
Pavol MayerPavol Mayer
Pavol Mayer
TFTomas Funtik
Tomas Funtik
Ján ErdélyiJán Erdélyi
Ján Erdélyi
Richard HontiRichard Honti
Richard Honti
CEROVŠEK TomoCEROVŠEK Tomo
CEROVŠEK Tomo
This paper addresses critical success factors for the delivery of BIM projects. The lack of experience with BIM projects on both the demand and supply side often leads to insufficient project teams, unsatisfied clients, schedule, and cost overruns. In order to better structure and control the information delivery in BIM projects requirements, planning and delivery must be standardized. The latter was achieved by EIR (Exchange Information Requirements), new BIM roles, BEP (BIM Execution Plan), and specified digital handover, which must be supported by a common data environment (CDE). This paper provides an analysis of the characteristics of BIM project delivery and duration in Architectural and Engineering companies in Slovakia. The analysis is based on the web survey of BIM managers and coordinators, which reveals that a significant amount of BIM project efforts must be executed by BIM specialists. The results also graphically depict the scope of critical BIM activities across project phases. The presented study is relevant for various project stakeholders and allows for a deeper understanding of the resources needed for the successful delivery of BIM projects in terms of adequate project team capacity, capability, organization, and planning.

30 November 2023 in Buildings
Verified
Journal Article
Open access
PDF file
TFTomas Funtik
Tomas Funtik
PMPeter Makýš
Peter Makýš
MĎMarek Ďubek
Marek Ďubek
Ján ErdélyiJán Erdélyi
Ján Erdélyi
Richard HontiRichard Honti
Richard Honti
CEROVŠEK TomoCEROVŠEK Tomo
CEROVŠEK Tomo
Building information modeling (BIM) is a key approach for the digitization of the sector. Therefore, states worldwide put BIM at the center of their construction digitalization strategies. However, strategies vary significantly, and so does BIM implementation and its adoption over time, thus making the comparison between countries considerably challenging. Therefore, the first part of this article provides a comprehensive review of available publications in the field of BIM adoption at the national and international level. BIM adoption in Slovakia is systematically analyzed based on an anonymous online BIM survey that focuses on various areas of BIM. The focus of the BIM survey was on the assessment of the readiness of experts who work with BIM methodology, their maturity, skillsets, and BIM adoption motivation, along with the means of communication and collaboration using Common Data Environment (CDE). Furthermore, we focused on the project management perspective, which covers the existence and compliance with BIM execution plan (BEP) evaluation. In the concluding part, requirements, barriers, and future developments are discussed in detail. The BIM survey provides an insight in the current state of the art of BIM in the industry that allows for a better understanding of its potential and a more informed development and implementation of BIM strategies. This study is an important contribution to BIM and digitalization benchmarking that provides valuable information to digitalization policy makers at the governmental and business levels.

24 July 2025 in Buildings
Verified
Journal Article
Open access
PDF file
CEROVŠEK TomoCEROVŠEK Tomo
CEROVŠEK Tomo
Mohamed OmarMohamed Omar
Mohamed Omar
As BIM projects grow in volume and complexity, automated Information Compliance Checking (ICC) is becoming essential to meet demanding regulatory and contractual requirements. This study presents novel controlled vocabularies and processes for the management of information requirements, along with a structured evaluation of the Information Delivery Specification (IDS) and its associated tools. The controlled vocabularies are important as they provide support to standardization, information retrieval, data-driven workflows, and AI integration. Information requirements are classified by input type and project interaction context (phase, origin, project role, and communication), as well as by applicability (data management function, model granularity, BIM usage, and checkability). The ontology comprises seven categories: identity, geometry, design/performance, fabrication/construction, operation/maintenance, cost, and regulatory category, each linked to verification principles such as uniqueness and consistency. This enables systematic implementation of validation checks aligned with company and project needs. We introduce three ICC workflows in relation to the BIM authoring tools (inside, outside, and hybrid) and suggest key criteria for the functional and non-functional evaluation of IDS tools. Empirical results from a real project using five IDS tools reveal implementation issues with the classification facet, regular expressions, and issue reporting. The proposed ontology and framework lay the foundation for a scalable, transparent ICC within openBIM. The results also provide ICC process guidance for practitioners, a SWOT analysis that can inform enhancements to the existing IDS schema, identify possible inputs for certification of IDS tools, and generate innovative ideas for research and development.


13 October 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
CEROVŠEK TomoCEROVŠEK Tomo
CEROVŠEK Tomo
The construction sector drives nearly half of global material extraction, energy use, emissions, and waste, yet environmental impact assessment (EIA) remains a static document, fragmented and disconnected from dynamic ecological systems. Here, we propose an upgrade to a five-dimensional (5D) EIA framework that integrates space-time analysis (3D + time = 4D) with real-time monitoring and impact quantification (5D) to account for environmental footprint and prevent irreversible impacts. The methodology included an analysis of over 100 EIA permits and reports, supplemented by interviews, reviews of technologies and process and systems analysis. Central to this approach is the inclusion of 4D building information models (BIM) and nature’s self-cleansing capacity, which is often overlooked in conventional assessments. The proposed Integrated Environmental Decision Support Information System (I-EDSIS) would enable continuous impact tracking, cumulative effect evaluation, and insights into patterns for adaptive mitigation. Drawing on a national-scale case study, we show that building permits correlate with NOx and PM10 (r = 0.96), while pollutant levels vary by up to 1.5–3 times across months and within a day, revealing potential for time-sensitive adaptive construction and less ecological disruption. This perspective argues for reframing EIA as a proactive tool for sustainability, transparency, active durability, cross-sectoral data integration, and resilience-based development.