Pavol Mayer

Dr. Pavol Mayer

Department of Building Technologies, Faculty of Civil Engineering, Slovak University of Technology in Bratislava
orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Pavol MayerPavol Mayer
Pavol Mayer
TFTomas Funtik
Tomas Funtik
JOZEF GAŠPARÍKJOZEF GAŠPARÍK
JOZEF GAŠPARÍK
PMPeter Makýš
Peter Makýš
Building information modeling (BIM) brings several benefits to design and construction companies, especially in higher efficiency and quality of work. Several companies also use common data environment (CDE) systems, which speed up communication and collaboration between project participants. These can be used for occupational health and safety (HS) purposes and to increase the level of HS on construction sites. The first part of the article presents the state-of-the-art possibilities and approaches to implementing BIM in automatic or semi-automatic health and safety hazard detection. The following parts analyze the interviews with experts in BIM coordination, project management and health and safety in Slovakia and their answers to a survey, that covers the topic of safety hazard detection in BIM. The analysis shows that BIM is a suitable tool for increasing safety on construction sites, but there are several obstacles to achieving its full potential. The survey brings readers closer to the current state of the topic and the possibilities offered by BIM and CDE software in Slovakia. This paper, through the requirements and opinions of experts in BIM, project management and HS management, points out areas for further research and development of BIM software.

19 December 2021 in Buildings
Verified
Journal Article
Open access
PDF file
Pavol MayerPavol Mayer
Pavol Mayer
TFTomas Funtik
Tomas Funtik
Ján ErdélyiJán Erdélyi
Ján Erdélyi
Richard HontiRichard Honti
Richard Honti
CEROVŠEK TomoCEROVŠEK Tomo
CEROVŠEK Tomo
This paper addresses critical success factors for the delivery of BIM projects. The lack of experience with BIM projects on both the demand and supply side often leads to insufficient project teams, unsatisfied clients, schedule, and cost overruns. In order to better structure and control the information delivery in BIM projects requirements, planning and delivery must be standardized. The latter was achieved by EIR (Exchange Information Requirements), new BIM roles, BEP (BIM Execution Plan), and specified digital handover, which must be supported by a common data environment (CDE). This paper provides an analysis of the characteristics of BIM project delivery and duration in Architectural and Engineering companies in Slovakia. The analysis is based on the web survey of BIM managers and coordinators, which reveals that a significant amount of BIM project efforts must be executed by BIM specialists. The results also graphically depict the scope of critical BIM activities across project phases. The presented study is relevant for various project stakeholders and allows for a deeper understanding of the resources needed for the successful delivery of BIM projects in terms of adequate project team capacity, capability, organization, and planning.

14 December 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Ján ErdélyiJán Erdélyi
Ján Erdélyi
Richard HontiRichard Honti
Richard Honti
TFTomas Funtik
Tomas Funtik
Pavol MayerPavol Mayer
Pavol Mayer
Aset MadievAset Madiev
Aset Madiev
The effort towards automation of the building industry processes has increased significantly over the last years worldwide. One of the key tools in this process is the modeling of buildings using Building Information Modeling (BIM). When following fundamental principles, a BIM model serves as an up-to-date pool of information. Combining the results of effective spatial data collection techniques with the information from a BIM model, it is possible to increase the effectiveness of as-built documentation of the structures or in-site clash detection between the built and planned parts. In this paper, we describe an approach for the verification of building structures by comparing the as-built model created from point clouds with the as-planned model of the building. The point clouds can be collected by laser scanning or photogrammetry, while the geometry of the planned (designed) structures is derived from the BIM model in the Industry Foundation Classes (IFC) format. The advantage of the approach is that the as-built model is created by regression models from point clouds preprocessed by detailed segmentation. The deviations from the design and the relative geometry (e.g., flatness) of the elements are expressed by signed color maps. The presented workflow enables semi-automated verification of building structures.

31 December 2022 in Czech Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
Pavol MayerPavol Mayer
Pavol Mayer
TFTomáš Funtík
Tomáš Funtík
RHRichard Honti
Richard Honti
The coordination of Mechanical, Electrical and Plumbing (MEP) disciplines is one of the most important tasks of architects and engineers in any project. However, coordination using 2D drawing documentation is insufficient, as only clashes that are on main routes or easily visible on floorplans are removed in this way. Because of this, it is necessary to remove a lot of clashes later – on construction sites, which causes delays and increases the cost of construction. By using Building Information Modeling and Common Data Environment tools, the clash management process and overall MEP coordination is much more efficient, resulting in higher quality projects. The article describes the basic principles of Building Information Modeling of MEP and its coordination, as well as collision management based on BIM Collaboration Format (BCF) and CDE principles.

1 September 2020 in Slovak Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
Richard HontiRichard Honti
Richard Honti
JEJán Erdélyi
Ján Erdélyi
GBGabriela Bariczová
Gabriela Bariczová
TFTomáš Funtík
Tomáš Funtík
Pavol MayerPavol Mayer
Pavol Mayer
One of the most important parts of construction work is the verification of the geometry of the parts of structures and buildings constructed. Today this procedure is often semi- or fully automated. The paper introduces an approach for the automated verification of parts of buildings, by comparing the design of a building (as-planned model), derived from a Building Information Model (BIM) in an Industry Foundation Classes (IFC) exchange format to a terrestrial laser scanning (TLS) point cloud (as-built model). The approach proposed has three main steps. The process begins with the acquisition of information from the as-planned model in the IFC exchange format; the second step is the automated (wall) plane segmentation from the point cloud. In the last step, the two models mentioned are compared to determine the deviations from the design, and the as-built wall flatness quantification is also executed. The potential of the proposed algorithm is shown in a case-study.

31 January 2021 in Czech Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
TFTomas Funtik
Tomas Funtik
Pavol MayerPavol Mayer
Pavol Mayer
Today's technologies enable efficient data management and generally contribute to effective control of the construction process. There are various ways of focusing on a real construction project based on laser or digital camera measurements, however, the quality of outputs is depending on the lighting conditions. Proper lighting conditions greatly affect the result of the processed record, especially its final texture, geometry, and affect any errors in the measured values. There are various lighting conditions on the construction site, which affect the quality of the documentation made. While in the outdoor parts this situation is affected by daylight, inside the building we must rely on artificial lighting and as a result there are many parts without sufficient lighting, or the lighting is completely absent.In this article we focus on the evaluation of the impact of lighting in documenting the course of work on the site using 360 ° photogrammetry, especially in relation to verification of geometric accuracy, position of structures and current work in progress and follows the analysis of standard and technical requirements to determine appropriate ways to ensure adequate lighting.