Cracks in the lining significantly reduce the safety of a tunnel during operation. It is urgent to figure out the influence of cracks on tunnel carrying capacity. In this paper, three-dimensional model tests were conducted to investigate deformation, internal force, and deterioration laws of the lining with prefabricated cracks at different positions. The main conclusions were obtained as follows: (1) The carrying capacity of the lining structure with prefabricated cracks was reduced, and the deformation of the lining structure increased. The penetration of the vault crown crack accelerated the damage of the lining structure, and structural failure occurred when the crack went through at the left arch spring. (2) The internal force of the lining was greatly affected by the positions of prefabricated cracks. The internal forces of the lining structure decreased with the existence of prefabricated cracks. Whether or not there were prefabricated cracks, tension cracks appeared in the inside fiber of the vault and inverted arch. (3) The deformation of the lining structure with the existence of prefabricated cracks increased. When the prefabricated crack was located at the vault, the deformation was the largest, followed by the arch spring, side wall, and arch shoulder. (4) The analysis shows that prefabricated cracks at the vault are the most damaging under stress and deformation of the lining structure, so longitudinal cracks at the vault should be strengthened.
With the increasing operation time of tunnels, the drainage system cannot fulfil its proper function as a result of the deterioration of traditional waterproof and drainage systems (TWDS), such as the blockage of drainage blind pipes and the failure of drainage boards. Therefore, the lining bears a high water pressure and even causes disasters such as tunnel leakage and lining cracking. An effective solution to mitigate these issues is to adjust the tunnel drainage scheme. In view of this, a composite waterproof and drainage system (CWDS) is proposed in this paper. To verify the effectiveness of the proposed system, a series of model experiments were conducted to study the change law of the seepage field of two drainage systems under different blockage conditions. The study results showed that longitudinal blind pipe blockage caused a more significant increase in water pressure than circular blind pipe blockage. In the case of blind pipe blockage, the water pressure of the TWDS tunnels rise rapidly, while the CWDS tunnels could effectively drain and reduce pressure.
The concrete lining in subway tunnels often undergoes cracking damage in coastal cities. The combination of cracked tunnel lining structures and high concentrations of corrosive ions in the groundwater (e.g., chlorine) can accelerate concrete erosion, reduce the mechanical performance of the lining structures and shorten the tunnel service life. This paper investigates the chloride ion concentration in the groundwater of several subway tunnels in the coastal city of Qingdao, China. Indoor experiments and numerical simulations are conducted to investigate the chloride ion transport behaviour and service performance of cracked concrete linings. The results are applied to predict the service life of lining structures. The crack depth in concrete linings is found to have the most significant effect on the transport rate of chloride ions, followed by the crack width. The numerical simulations are carried out using COMSOL software to study the chloride transport behaviour in cracked specimens and predict the service lifetimes of lining structures of different thicknesses, and the results correspond well with the experimental data. The durability of a concrete lining can be enhanced by increasing the thickness of the protective concrete layer. Additional measures are proposed for treating cracked concrete linings to resist chloride ion attack in subway tunnels.