Wanping Pan

Dr. Wanping Pan

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 December 2024 in Composites Part B: Engineering
Verified
Journal Article
Closed access
AXAiyan Xu
Aiyan Xu
YDYunxing Du
Yunxing Du
AGAofei Guo
Aofei Guo
WPWanping Pan
Wanping Pan
DZDeju Zhu
Deju Zhu

1 December 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
YHYing Huang
Ying Huang
WPWanping Pan
Wanping Pan
YHYifei He
Yifei He
ZXZheqing Xie
Zheqing Xie
XZXiufang Zheng
Xiufang Zheng
In the construction industry, the reverse logistics supply chain (RLSC) is one of the measures used to effectively manage demolition waste. However, there are still many problems associated with its operation, including inaccurate calculation of demolition waste supplies and insufficient interaction between supply and demand information, and waste suppliers usually choose transportation alternatives associated with high carbon emissions to obtain economic benefits. These issues have hindered the sustainable development of the RLSC. This paper proposes a waste recycling facility selection system (WRFSS) that integrates building information modeling (BIM), web map service (WMS), and an application programming interface (API) plug-in. Compared to the actual transportation scenario, the transportation distance of the WRFSS was reduced by 30.6 km and the amount of carbon dioxide emissions were reduced by 0.0259 tons. This selection system realizes an optimal selection mechanism for waste recycling facilities and develops the shortest transportation plan, thereby reducing carbon emissions during transportation and achieving sustainable development.

14 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
Feng GuoFeng Guo
Feng Guo
XLXuancen Li
Xuancen Li
YPYifang Pan
Yifang Pan
AXAiyan Xu
Aiyan Xu
WPWanping Pan
Wanping Pan
YZYuchen Zhang
Yuchen Zhang
Major railway projects are large-scale infrastructure investments facing significant safety challenges due to complex geological conditions, extreme environments, and uncertain risks. This study integrates resilience theory into railway construction safety management, shifting from traditional risk management (Safety-I) to resilience-based management (Safety-II). A resilience evaluation framework was developed using the 4Rs (robustness, redundancy, resourcefulness, rapidity) and ARRA (absorptive, resistant, restorative, adaptive) capabilities. Adversarial Interpretative Structural Modeling (AISM) and systematic clustering analysis were applied to identify key safety resilience factors and construct an evaluation index system. The findings highlight that optimized personnel allocation, adaptive machinery, standardized material use, comprehensive emergency response, and a stable construction environment are crucial for enhancing safety resilience. The proposed framework provides practical insights for improving safety strategies, minimizing risks, and ensuring sustainable railway infrastructure development.

15 April 2025 in Buildings
Verified
Journal Article
Open access
PDF file
Feng GuoFeng Guo
Feng Guo
起刘起萱 刘
起萱 刘
LLLemin Li
Lemin Li
YZYixue Zuo
Yixue Zuo
YPYifang Pan
Yifang Pan
WPWanping Pan
Wanping Pan
Technological innovation risk in major railway projects is high, and the risk factors in the innovation process are complex and variable. In order to successfully complete the goal of technological innovation in major railway projects. This paper identifies the risk factors of technological innovation in major railway projects, establishes a system dynamics model of technological innovation risk evolution, and carries out simulation analysis by taking the C railway project as an example, to understand the risk evolution process, clarify the key tasks of risk prevention, and finally draw the following research conclusions: (1) Technological innovation risk is categorized into innovation management risk, technology R&D risk, and technology application risk, of which innovation management risk has a greater impact on technological innovation risk. (2) During the construction process, the risk of technological innovation shows a general trend of increasing and then stabilizing, with the technology R&D stage being the centralized emergence stage of technological innovation risk. (3) Changes in the values of risk factors will have different degrees of impact on technological innovation risk, with changes in planning and implementation having the greatest impact on the technological innovation risk system, followed by the feasibility of results, and changes in the value of technological difficulties risk having a lesser impact on the system. The results of this study can provide lessons and references for the prevention of technological innovation risks in major railway projects.

3 December 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Feng GuoFeng Guo
Feng Guo
XLXuancen Li
Xuancen Li
AXAiyan Xu
Aiyan Xu
YZYuchen Zhang
Yuchen Zhang
WPWanping Pan
Wanping Pan
The design of structures to resist progressive collapse primarily focuses on enhancing structural safety and robustness. However, given the low probability of accidental events, such designs often lead to a negative cost–benefit. To address this problem, this paper uses risk analysis to optimize the progressive collapse resistance design of steel frame structures. The elements’ cross-section design for the progressive collapse resistance of steel frame structures is optimized using genetic algorithms and SAP2000 23, which identify the structural model with the minimum robustness index while ensuring safety. The results show that the risk-based robustness index can effectively assess the cost of progressive collapse design. More importantly, the optimization model can rapidly identify the most cost-effective structural design solution that complies with progressive collapse resistance guidelines, enhancing the simplicity and usability of the structure design optimization process. Additionally, the integration of the SAP2000 API with Python 3.8 automation streamlines the parameterization process, minimizes manual errors, and enhances the precision and efficiency of the structural design optimization. Finally, the model’s effectiveness is validated through a case study, where the refined single-frame structure shows a reduction in initial construction and collapse-related costs by 2.4% and 9.1%, respectively. Meanwhile, the three-dimensional frame shows a 2.9% rise in initial costs but a 13.5% decrease in total collapse-resistant design costs, illustrating the model’s ability to balance safety with cost-effectiveness.

11 October 2026 in Buildings
Verified
Journal Article
Open access
PDF file
BKBigyata Karki
Bigyata Karki
Feng GuoFeng Guo
Feng Guo
WPWanping Pan
Wanping Pan
Green building projects in Least Developed Countries (LDCs) are exposed to significant socio-economic sustainability risks during the construction stage. This study develops an integrated risk assessment framework and applies it to green building projects in Nepal, which was classified as an LDC during the study period. Following a structured literature search, 30 respondents participated in risk-factor screening, which resulted in the retention of 20 construction-stage socio-economic sustainability risk factors for assessment. Eleven domain experts conducted pairwise comparison assessments using the fuzzy analytic hierarchy process (FAHP), while 30 construction practitioners evaluated the likelihood and impact of the identified risks for further analysis through the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). An integrated risk score (IRS) is subsequently calculated to produce the final prioritisation ranking. This involves employing FAHP to assess structural importance and TOPSIS to evaluate contextual severity. Results indicate that economic risk factors dominate, particularly cost premiums, import-dependent material price escalation, inaccurate cost forecasting, and cash flow instability, with skilled labour shortages emerging as the key social risk factor. Sensitivity analyses confirm ranking stability, while literature alignment and case-based assessment support the contextual plausibility of the findings in the Nepal-referenced setting. The framework provides a structured decision-support tool for prioritising socio-economic sustainability risk factors in green building projects. Although the empirical rankings are context-specific, the proposed hybrid MCDM framework can be adapted and tested in other resource-constrained construction contexts.