Major railway projects are large-scale infrastructure investments facing significant safety challenges due to complex geological conditions, extreme environments, and uncertain risks. This study integrates resilience theory into railway construction safety management, shifting from traditional risk management (Safety-I) to resilience-based management (Safety-II). A resilience evaluation framework was developed using the 4Rs (robustness, redundancy, resourcefulness, rapidity) and ARRA (absorptive, resistant, restorative, adaptive) capabilities. Adversarial Interpretative Structural Modeling (AISM) and systematic clustering analysis were applied to identify key safety resilience factors and construct an evaluation index system. The findings highlight that optimized personnel allocation, adaptive machinery, standardized material use, comprehensive emergency response, and a stable construction environment are crucial for enhancing safety resilience. The proposed framework provides practical insights for improving safety strategies, minimizing risks, and ensuring sustainable railway infrastructure development.
Technological innovation risk in major railway projects is high, and the risk factors in the innovation process are complex and variable. In order to successfully complete the goal of technological innovation in major railway projects. This paper identifies the risk factors of technological innovation in major railway projects, establishes a system dynamics model of technological innovation risk evolution, and carries out simulation analysis by taking the C railway project as an example, to understand the risk evolution process, clarify the key tasks of risk prevention, and finally draw the following research conclusions: (1) Technological innovation risk is categorized into innovation management risk, technology R&D risk, and technology application risk, of which innovation management risk has a greater impact on technological innovation risk. (2) During the construction process, the risk of technological innovation shows a general trend of increasing and then stabilizing, with the technology R&D stage being the centralized emergence stage of technological innovation risk. (3) Changes in the values of risk factors will have different degrees of impact on technological innovation risk, with changes in planning and implementation having the greatest impact on the technological innovation risk system, followed by the feasibility of results, and changes in the value of technological difficulties risk having a lesser impact on the system. The results of this study can provide lessons and references for the prevention of technological innovation risks in major railway projects.