Predrag Jovančić

Prof. Dr. Predrag Jovančić


Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 March 2022 in Mathematics
Verified
Journal Article
Open access
PDF file
SDStevan Djenadic
Stevan Djenadic
Milos TanasijevicMilos Tanasijevic
Milos Tanasijevic
PJPredrag Jovančić
Predrag Jovančić
DIDragan Ignjatovic
Dragan Ignjatovic
DPDejan Petrović
Dejan Petrović
UBUglješa Srbislav Bugarić
Uglješa Srbislav Bugarić
The risk assessment of engineering systems represents an important part of the quality of service and dependability. The existing methods for risk evaluation use crisp sets for rating partial indicators’ proposition and their cumulative products as an overall indicator. In this paper, existing FMEA and FMECA methods have been improved using the fuzzy expert system for calculating the risk priority number. The application of fuzzy logic allows the use of linguistic descriptions for risk analysis. In this way, the state of the system in terms of risks and consequences is better described. The settings of the fuzzy systems are based on the application of two multi-criteria decision-making methods. The AHP method was used to define the mutual relationship of the impact of partial indicators (occurrence, severity, and detectability) on risk. In this way, subjectivity in risk assessment is reduced. In the composition of the fuzzy model, the TOPSIS method is introduced to reduce the dissipation of results, which contributes to the accuracy of the outcome. This contributes to the accuracy of the results. The results were verified through a case study of a complex engineering system—bucket-wheel excavators. The risk was observed from the aspect of the danger of damage and the danger of downtime. The initial information for weak points of ES is defined according to historical damage events and statistics of downtime. Expert knowledge was used for weak points grading in the model. Additional model verification was performed using similar methods, using the same input data. The innovative model, presented in the paper, shows that it is possible to correct different weights of risk indicators. The obtained results show less dispersion compared with other existing methods. Weak points with increased risk have been located, and an algorithm has been proposed for risk-based maintenance application and implementation.

1 August 2012 in Expert Systems with Applications
Verified
Journal Article
Closed access
RMRajko Miodragović
Rajko Miodragović
MTMiloš Tanasijević
Miloš Tanasijević
ZMZoran Mileusnić
Zoran Mileusnić
PJPredrag Jovančić
Predrag Jovančić

1 June 2011 in Engineering Failure Analysis
Verified
Journal Article
Closed access
PJPredrag Jovančić
Predrag Jovančić
DIDragan Ignjatović
Dragan Ignjatović
MTMiloš Tanasijević
Miloš Tanasijević
TMTaško Maneski
Taško Maneski

1 March 2011 in Energy Policy
Verified
Journal Article
Closed access
PJPredrag Jovančić
Predrag Jovančić
Milos TanasijevicMilos Tanasijevic
Milos Tanasijevic
DIDejan D. Ivezić
Dejan D. Ivezić

1 June 2012 in Engineering Failure Analysis
Verified
Journal Article
Closed access
TMTaško Maneski
Taško Maneski
PJPredrag Jovančić
Predrag Jovančić
DIDragan Ignjatović
Dragan Ignjatović
VMVesna Milošević-Mitić
Vesna Milošević-Mitić
MMMiloš Maneski
Miloš Maneski

19 April 2012 in Quality and Reliability Engineering International
Verified
Journal Article
Closed access
PDF file
MTMiloš Tanasijević
Miloš Tanasijević
DIDejan Ivezić
Dejan Ivezić
PJPredrag Jovančić
Predrag Jovančić
DĆDobrivoje Ćatić
Dobrivoje Ćatić
DZDragan Zlatanović
Dragan Zlatanović