The risk assessment of engineering systems represents an important part of the quality of service and dependability. The existing methods for risk evaluation use crisp sets for rating partial indicators’ proposition and their cumulative products as an overall indicator. In this paper, existing FMEA and FMECA methods have been improved using the fuzzy expert system for calculating the risk priority number. The application of fuzzy logic allows the use of linguistic descriptions for risk analysis. In this way, the state of the system in terms of risks and consequences is better described. The settings of the fuzzy systems are based on the application of two multi-criteria decision-making methods. The AHP method was used to define the mutual relationship of the impact of partial indicators (occurrence, severity, and detectability) on risk. In this way, subjectivity in risk assessment is reduced. In the composition of the fuzzy model, the TOPSIS method is introduced to reduce the dissipation of results, which contributes to the accuracy of the outcome. This contributes to the accuracy of the results. The results were verified through a case study of a complex engineering system—bucket-wheel excavators. The risk was observed from the aspect of the danger of damage and the danger of downtime. The initial information for weak points of ES is defined according to historical damage events and statistics of downtime. Expert knowledge was used for weak points grading in the model. Additional model verification was performed using similar methods, using the same input data. The innovative model, presented in the paper, shows that it is possible to correct different weights of risk indicators. The obtained results show less dispersion compared with other existing methods. Weak points with increased risk have been located, and an algorithm has been proposed for risk-based maintenance application and implementation.
The main goal of this research was the development of an algorithm for the implementation of negative risk parameters in a synthesis model for a risk level assessment for a specific machine used in the mining industry. Fuzzy sets and fuzzy logic theory, in combination with statistical methods, were applied to analyze the time picture state of the observed machine. Fuzzy logic is presented through fuzzy proposition and a fuzzy composition module. Using these tools, the symmetric position of the fuzzy sets with regard to class was used, and the symmetric fuzzy inference approach was used in an outcome calculation. The main benefit of the proposed model is being able to use numerical and linguistic data in a risk assessment model. The proposed risk assessment model, using fuzzy logic conclusions and min–max composition, was used on a mobile crushing machine. The results indicated that the risk level of the mobile crushing machine was in the “high” category, which means that it is necessary to introduce maintenance policies based on this high risk. The proposed risk assessment model is useful for any engineering system.
The authors discuss why the current conceptual base of project management research and practice continues to attract criticism since it does not adequately address the complexity that leads to software-project failure. To do so, the study explores systems thinking and artificial neural networks to shed light on complexity in software-project behavior using nonlinear functional relationships between critical success factors and project success to utilize their connectedness as an approach in order to create project-outcome prediction models. The artificial neural networks were used to create two project-outcome prediction models: one for a binary classification task to discriminate failed from successful projects using a multi-input-single-output configuration and one for a multi-task binary classification to discriminate success from failure in multiple project-success dimensions using a multi-input multi-output configuration. The results yielded high-performance values for a binary classification task, performed to predict overall project success, and slightly lower performance values for the multi-task binary classification, which was also performed to predict success in project-success dimensions. It was found that the nonlinear behavior of critical success factors may be used to create prediction models, by embedding equifinality and connectedness constructs that prove to be useful to understand projects as complex, multi-loop, and nonlinear systems. Further research is needed to investigate the causality between critical success factors in order to explore the possible propagation of critical success factors within a project system network and its implications on project success.