Jin Wei

Jin Wei


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 June 2022 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
GWGuan-Qing Wu
Guan-Qing Wu
YXYong-Li Xie
Yong-Li Xie
JWJin Wei
Jin Wei
XYXiabing Yue
Xiabing Yue

14 March 2022 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
GWGuanqing Wu
Guanqing Wu
YXYongli Xie
Yongli Xie
JWJin Wei
Jin Wei
XYXiabing Yue
Xiabing Yue

12 December 2024 in Water
Verified
Journal Article
Open access
PDF file
HBHaiding Bian
Haiding Bian
JWJin Wei
Jin Wei
In collapsible loess sites, large-scale collapsible settlement may occur after water immersion, which will reduce the bearing capacity of existing highway bridge pile foundations and pose serious potential safety hazards. Given this, a large-scale field pile foundation immersion–loading test was conducted in a collapsible loess site. The settlement law of collapsible loess during the immersion was obtained, the bearing characteristics of pile foundations under the loading and immersion–loading conditions were compared and analyzed, and the formation mechanism of negative skin friction was discussed. The results show that the degree of collapsible deformation is related to the duration of immersion, external load, boundary conditions, and soil layer depth. Whether the collapsible loess site is immersed or not can only change the value and transfer rate of the axial force of the pile foundation but cannot change its transfer law. The collapsible deformation will increase the utilization rate of the pile tip resistance. During the collapsible settlement process, part of the gravity of the soil around the pile will be transferred to the pile, generating negative skin friction on the pile shaft. On this basis, eight preventive measures for reducing the negative skin friction of pile foundations in collapsible loess sites were proposed. The research findings can serve as a valuable reference for the design and construction of highway bridge pile foundations in collapsible loess areas.

6 February 2025 in Periodica Polytechnica Civil Engineering
Verified
Journal Article
Open access
PDF file
MZMenghan Zhang
Menghan Zhang
JWJin Wei
Jin Wei
To achieve rapid and precise prediction of slope stability, we propose an intelligent assessment method utilizing machine learning techniques. This approach aims to enhance the precision of slope stability evaluations, facilitating more effective and timely decision-making in geotechnical engineering. By analyzing 188 slope cases from domestic and international sources, we have identified six key feature variables to evaluate the Factor of Safety (FOS) for slope stability assessment. The dataset was established for evaluating slope stability, and to ensure robustness, it was divided into training and testing set using a 5-fold cross-validation approach. Four slope stability prediction models- GBM, SVM, XGB, and RF- were developed using machine learning algorithms. The accuracy of the models in predicting FOS for slopes was assessed using metrics such as MAE, MSE, RMSE, and R2. The best-performing machine learning model, along with the finite element model developed using GeoStudio, was applied to engineering examples to compare their feasibility and efficiency. The research findings demonstrates that the GBM model has a minimal error between the predicted and actual slope FOS, highlighting its high accuracy. The model shows a strong correlation between predicted and actual FOS, indicating its superior performance relative to other models. GBM model and the finite element model align well with the actual field conditions. However, the GBM model stands out due to its higher accuracy and faster computational efficiency. Therefore, the GBM model offers a high degree of fit between the predicted FOS and the actual values, making it well-suited for evaluating slope stability.

30 July 2023 in International Journal of Steel Structures
Verified
Journal Article
Closed access
PDF file
GWGuanqing Wu
Guanqing Wu
YXYongli Xie
Yongli Xie
JWJin Wei
Jin Wei
ZYZengliang Yin
Zengliang Yin
XYXiabing Yue
Xiabing Yue