This paper presents the engineering geological properties and roof control tecnology for a thick coal seam fully-mechanized face mining with hard roof conditions (THC) at the Jinhuagong Coal Mine (JCM), northwest China. The effective support working resistance and appropriate roof control technology are two critical factors for safe and productive mining in the THC. The load-estimate-method (LOEM) is the effective method to determine the support working resistance for normal working conditions (the mining height less than 3.5 m). In order to prevent support crushing accidents from happening and to ensure the safety and high-efficiency in the THC, the LOEM was modified based on the structure of the overlying strata in the THC. The strata which can form the voussoir beam structure in normal working conditions and will break in the form of cantilever beam in the THC is defined as the key strata in the immediate roof. Therefore, the hanging length of the key strata in the immediate roof was considered in the LOEM. Furthermore, a method for calculating the hanging length of the key strata in the immediate roof and its influencing factors were proposed using cantilever beam theory analysis of the structure of the overlying strata. Moreover, in order to fully fill the goaf area with caving roof to reduce the energy accumulation of main roof movement, it was decided to apply destress blasting technique (DEBT) at the JCM to control the large hanging length of the hard roof, so as to reduce the impact of the hard main roof movement on the working face. The key technique parameters of the roof caving borehole were also proposed. The obtained results demonstrated that the theoretical analysis is reasonable, and the chosen support type and the DEBT could meet the roof control requirements. The THC has achieved safety and high-efficiency mining.
To explore the bolt-grouting method of the deep roadway under three-dimensional unequal ground stress, a unidirectional coupling model of surrounding rock plastic failure and grouting diffusion considering the influence of excavation disturbance stress was established. Spatial evolution characteristics of plastic failure and grouting diffusion, and the impact of the spacing and row spacing of grouting bolts/cables on grout diffusion, were simulated by using the numerical method. The results revealed that the horizontal ground stress perpendicular to the axial direction of the roadway was the main factor inducing roadway damage. Moreover, the more significant the difference of the ground stress in three directions, the larger the plastic zone of the roof corner and floor corner of the roadway. Under different lateral pressure coefficients, the grout diffused can be approximate ellipsoid and cylinders. Furthermore, the larger the ratio of lateral pressure coefficients perpendicular to and parallel to the axial direction of roadway, the larger the diffusion length of grout in each spatial direction in the surrounding rock. In bolt-grouting support, the length of the grouting bolts/cables should be greater than the plastic zone of the surrounding rock, and the optimal relationship between their spacing and row spacing and diffusion length of grout is determined. The research results were applied in the bolt-grouting engineering for the three-level main roadway in the Haizi Coal Mine, and a good support effect was achieved. This can provide technical guidance and a method of reference for the design and parameter optimization of bolt-grouting support for roadways under deep high ground stress.
A concrete artificial side (AS) is introduced to stabilize a gob-side entry (GSE). To evaluate the stability of the AS, a uniaxial compression failure experiment was conducted with large and small-scale specimens. The distribution characteristics of the shear stress were obtained from a numerical simulation. Based on the failure characteristics and the variation of the shear stress, a failure criterion was determined and implemented in the strengthening method for the artificial side. In an experimental test, the distribution pattern of the maximum shear stress showed an X shape, which contributed to the failure shape of the specimen. The shear stress distribution and failure shape are induced by a combination of two sets of shear stresses, which implies that failure of the AS follows the twin shear strength theory. The use of anchor bolts, bolts, and anchor bars enhances the shear strength of the artificial side. When this side is stable, the components can constrain the lateral deformation as well as improve the internal friction angle and cohesion. When the AS is damaged, the components prevent the sliding of broken blocks along the shear failure plane and improve the residual strength of the artificial side. When reinforced with an anchor bar, the AS is still stable even after mining operations for three years.
In order to explore the effective support method for deep broken roadway, based on the in situ stress test results, the analytical and numerical solutions of the stress and the range of plastic failure zone (PFZ) in a circular roadway subjected to non-uniform loads were obtained using analytical and finite difference numerical methods based on the elastoplastic theory, respectively. Their comparison results show that the analytical and numerical methods are correct and reasonable. Furthermore, the high geostress causes the stress and range of PFZ in roadway roof and floor to increase sharply while those in roadway ribs decrease. Moreover, the greater the difference of horizontal geostress in different horizontal directions is, the larger the range of PFZ in roadway roof and floor is. The shape of PFZ in roadway varies with the ratio of horizontal lateral pressure coefficient in x-direction and y-direction. Finally, according to the distribution characteristics of PFZ and range of PFZ under the non-uniformly high geostress, this paper has proposed a combined support scheme, and refined and optimized supporting parameters. The field monitoring results prove that the roadway deformation and fracture have been effectively controlled. The research results of this paper can provide theoretical foundation as well as technical reference for the stability control of deep broken roadway under non-uniformly high geostress.