This paper presents the engineering geological properties and roof control tecnology for a thick coal seam fully-mechanized face mining with hard roof conditions (THC) at the Jinhuagong Coal Mine (JCM), northwest China. The effective support working resistance and appropriate roof control technology are two critical factors for safe and productive mining in the THC. The load-estimate-method (LOEM) is the effective method to determine the support working resistance for normal working conditions (the mining height less than 3.5 m). In order to prevent support crushing accidents from happening and to ensure the safety and high-efficiency in the THC, the LOEM was modified based on the structure of the overlying strata in the THC. The strata which can form the voussoir beam structure in normal working conditions and will break in the form of cantilever beam in the THC is defined as the key strata in the immediate roof. Therefore, the hanging length of the key strata in the immediate roof was considered in the LOEM. Furthermore, a method for calculating the hanging length of the key strata in the immediate roof and its influencing factors were proposed using cantilever beam theory analysis of the structure of the overlying strata. Moreover, in order to fully fill the goaf area with caving roof to reduce the energy accumulation of main roof movement, it was decided to apply destress blasting technique (DEBT) at the JCM to control the large hanging length of the hard roof, so as to reduce the impact of the hard main roof movement on the working face. The key technique parameters of the roof caving borehole were also proposed. The obtained results demonstrated that the theoretical analysis is reasonable, and the chosen support type and the DEBT could meet the roof control requirements. The THC has achieved safety and high-efficiency mining.
Backfill mining has significant advantages in safe mining, solid waste utilization and ecological environmental protection, but solid waste materials (tailings, gangue and coal gasification slag, etc.), as derivative residues of the chemical and metallurgical industries, contain a large number of heavy metal elements, which is posing great challenges to the underground environment after backfill. In order to study the feasibility of bentonite for reducing the permeability of gangue/tailing sand cemented backfill body, relevant tests were carried out from the basic performance index, flow performance and mechanical properties of paste backfill materials. The test results show that bentonite has a significant effect on the water secretion rate of cemented fillers, and also promotes the improvement of slump and diffusion diameter of backfill slurry. The enhancement effect of mechanical properties in the early stage is not obvious, mainly concentrated in the middle and late stages of specimen curing. With the increase of bentonite content, the 28-day uniaxial compressive strength increased from 7.1 MPa and 7.9 MPa to 8.7 MPa and 9.0 MPa, respectively. Bentonite is filled between the pores of the cemented backfill with its fine particles and water swelling, which can reduce the porosity and permeability of the gangue and tailings cemented backfill. Therefore, on the premise of satisfying the flow and mechanical properties of paste backfill, bentonite can be used to improve the permeability of cemented backfill and reduce the leaching and migration of heavy metal ions.
A concrete artificial side (AS) is introduced to stabilize a gob-side entry (GSE). To evaluate the stability of the AS, a uniaxial compression failure experiment was conducted with large and small-scale specimens. The distribution characteristics of the shear stress were obtained from a numerical simulation. Based on the failure characteristics and the variation of the shear stress, a failure criterion was determined and implemented in the strengthening method for the artificial side. In an experimental test, the distribution pattern of the maximum shear stress showed an X shape, which contributed to the failure shape of the specimen. The shear stress distribution and failure shape are induced by a combination of two sets of shear stresses, which implies that failure of the AS follows the twin shear strength theory. The use of anchor bolts, bolts, and anchor bars enhances the shear strength of the artificial side. When this side is stable, the components can constrain the lateral deformation as well as improve the internal friction angle and cohesion. When the AS is damaged, the components prevent the sliding of broken blocks along the shear failure plane and improve the residual strength of the artificial side. When reinforced with an anchor bar, the AS is still stable even after mining operations for three years.
Presplit blasting can reduce vibration and back impact induced by cast blasting, thus resulting in a smooth bench slope. To design reasonable presplit blasting parameters, this research investigated the formation of presplit faces based on the explosion mechanics and revealed the cracking mechanism of presplit blasting. According to the stress distribution in the vicinity of the blast holes under the action of explosive stress waves and blasting gas, we deduced theoretical formulae for parameters including charge mass in blast holes, hole spacing, and distance from presplit blast holes to cushion holes. On this basis, a method was proposed for the design of large‐diameter deep‐hole presplit blasting. Field testing was conducted by setting different spacing for presplit blast holes, to monitor the blasting‐induced vibration. The results showed that appropriate hole spacing can reduce the particle vibration velocity and the attenuation index of blasting‐induced vibration changed slightly while the attenuation coefficient decreased significantly; the formed presplit faces were smooth and had a high half‐cast factor. Finally, the reasonable hole spacing for presplit blasting, distance from presplit blast hole to the cushion hole, and the charge mass in blast holes in the Heidaigou open‐pit coal mine were determined, respectively.
To reveal the critical factors of the main roof influencing stability of surrounding rocks of roadways driven along goaf in fully‐mechanized top‐coal caving faces, this paper builds a structural mechanics model for the surrounding rocks based on geological conditions of the 8105 fully‐mechanized caving face of Yanjiahe Coal Mine, and the stress and equilibrium conditions of the key rock block B are analyzed, and focus is on analyzing rules of the key rock block B influencing stability of roadways driven along goaf. Then, the orthogonal experiment and the range method are used to confirm the sensitivity influencing factors in numerical simulation, which are the basic main roof height and the fracture location, the length of the key rock block B, and the main roof hardness in turn. It is revealed that the basic main roof height and its fracture location have a greater influence on stability of god‐side entry driving. On the one hand, the coal wall and the roof of roadways driven along goaf are damaged, and the deformation of surrounding rocks of roadways and the vertical stress of narrow coal pillars tend to stabilize along with the increase of the basic main roof height. On the other hand, when the gob‐side entry is located below the fracture line of the main roof, the damage caused by gob‐side entry is the most serious. Therefore, on‐site gob‐side entry driving should avoid being below the fracture line of the main roof. At last, industrial tests are successfully conducted in the fully‐mechanized top‐coal caving faces, 8105 and 8215, of Yanjiahe Coal Mine.
A drainage roadway was constructed in the fractured zone beside an air-return roadway of a mining site. However, drainage roadways serve only one working face and are discarded after mining, thus weakening sustainable mining practices. To improve the sustainability at mining sites, this paper proposes a new drainage roadway that can serve two adjacent working faces. A schematic layout of the proposed lateral high drainage roadway (LHDR) is presented. The LHDR can be used to extract pressurized gas from two neighboring mining zones. A theoretical study, numerical simulation, and field observations were performed to identify the mining-induced fractures and stress distribution. The layout of the LHDR and the optimal position of the extraction boreholes were derived considering the geological conditions in the Liyazhuang Coal Mine in China. A borehole and LHDR were installed at the specified mining site and the rock displacement of the LHDR and gas concentration at branch pipelines, boreholes of the LHDR, and upper part of the working face were monitored during mining. The performance of the LHDR was validated.