The EU DEMO Tokamak is foreseen to be equipped with an electron cyclotron (EC) system for plasma heating, magnetohydrodynamic (MHD) control, and thermal instability suppression. Up to six launchers will be installed into equatorial ports with the aim to inject a maximum of 130 MW millimeter wave power at frequencies of 136/170/204 GHz toward dedicated positions into the plasma. This article presents the current layout of the typical EC system launcher components within the available space reservation areas in the equatorial level of the DEMO baseline model. Beside the general arrangement of the EC launcher components, preliminary design features of the launcher port plug modules, an active cooling system approach, integration concepts for mirrors and waveguides (WGs) of the optical system, the shielding component formation, and safety important elements of the first containment barrier of the launcher are presented. Furthermore, relevant aspects of assembly and potential remote maintenance (RM) procedures are discussed.
Comprehensive neutronic analyses are being performed for different variants of the International Thermonuclear Experimental Reactor (ITER) electron cyclotron resonance heating upper launcher under development in the European Union making use of modern computation tools such as the McCad code for geometry conversion and the rigorous two-step (R2S) interface for rigorous shutdown dose rate calculation. There were many reasons for the challenges encountered during the shielding analyses: deep-penetrated radiation transport in the complex geometry of the launcher, frequent need to introduce changes in the three-dimensional MCNP model, and necessity to meet a broad range of nuclear sufficiency requirements specified for ITER. The challenges were successfully addressed and resulted in radiation shielding and nuclear safety support for the current version of the launcher design, which should be workable in ITER. During the process of the launcher design development, a comprehensive knowledge of neutronic...
This paper presents an overview of the evolution of the radiation shielding calculations for the ITER upper port electron cyclotron heating (ECH) launcher performed over the last 6 yr at Karlsruhe Institute of Technology (KIT). The current advances at KIT in the development of the McCad program as an interface between a computer-aided-design (CAD) system and the Monte Carlo radiation transport codes Monte Carlo N-Particle (MCNP) Version 5 (MCNP5) and TRIPOLI-4 enable a substantial increase of neutronic calculation efficiency for the development of nuclear systems design. This work provides new results in the application of calculation techniques enhanced with the CAD-based radiation transport capabilities of McCad and with the inherent features of MCNP5 such as its variance-reduction techniques (VRTs) and mesh tallies. High-resolution mapping of the helium production distribution in the ITER location that was supposed to be rewelded was accomplished using the MCNP mesh tally. This mapping is impor...