Henrik Matz

Mr. Henrik Matz

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 February 2019 in Beton- und Stahlbetonbau
Verified
Journal Article
Closed access
PDF file
VOVincent Oettel
Vincent Oettel
HMHenrik Matz
Henrik Matz
MEMartin Empelmann
Martin Empelmann

12 July 2021 in Beton- und Stahlbetonbau
Verified
Journal Article
Closed access
PDF file
HMHenrik Matz
Henrik Matz
MEMartin Empelmann
Martin Empelmann

13 July 2021 in Beton- und Stahlbetonbau
Verified
Journal Article
Closed access
PDF file
HMHenrik Matz
Henrik Matz
MEMartin Empelmann
Martin Empelmann

14 May 2020 in Beton- und Stahlbetonbau
Verified
Journal Article
Closed access
PDF file
MEMartin Empelmann
Martin Empelmann
HMHenrik Matz
Henrik Matz

31 October 2019 in Beton- und Stahlbetonbau
Verified
Journal Article
Closed access
PDF file
MEMartin Empelmann
Martin Empelmann
HMHenrik Matz
Henrik Matz

16 December 2022 in CivilEng
Verified
Journal Article
Open access
PDF file
HMHenrik Matz
Henrik Matz
MEMartin Empelmann
Martin Empelmann
In response to housing shortages in densely inhabited urban areas, there is a search for structural engineering solutions for serial and modular construction. Prefabricated concrete columns can make an important difference. Using industrial manufacturing processes, it is possible to produce highly loadable, durable and true-to-size columns that enable accelerated construction progress and dismantling or reuse of the components at the end of the structure’s economic life. However, there are challenges in designing the detachable connection between highly loaded columns due to an undesired reduction of the load-bearing capacity on the one hand and a high sensitivity to geometrical deviations on the other hand. To investigate the load-bearing and deformation behaviour of butt-jointed columns, large-scale component tests as well as three-dimensional numerical analyses using the finite element method were carried out. The analyses show that measures to increase the stiffness of the joint, such as thicker steel plates, lower mortar thickness, etc., lead to an increase of the ultimate load. It could also be demonstrated that butt-jointed columns are very sensitive to unevenness of the end faces. Finally, the investigations allow first conclusions on the design and detailing of detachable compression connections between prefabricated concrete columns.