Pei Tai

Dr. Pei Tai


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 March 2022 in Computers and Geotechnics
Verified
Journal Article
Closed access
Zhaofeng LIZhaofeng LI
Zhaofeng LI
JCJun Kang Chow
Jun Kang Chow
JLJinhui Li
Jinhui Li
PTPei Tai
Pei Tai
ZZZuosheng Zhou
Zuosheng Zhou

29 May 2024 in Transportation Geotechnics
Verified
Journal Article
Closed access
PTPei Tai
Pei Tai
BIBuddhima Indraratna
Buddhima Indraratna
CRCholachat Rujikiatkamjorn
Cholachat Rujikiatkamjorn
RCRui Chen
Rui Chen
Zhaofeng LIZhaofeng LI
Zhaofeng LI

16 July 2020 in International Journal for Numerical and Analytical Methods in Geomechanics
Verified
Journal Article
Closed access
PDF file
CZChao Zhou
Chao Zhou
PTPei Tai
Pei Tai
JYJian‐Hua Yin
Jian‐Hua Yin

6 May 2022 in Materials
Verified
Journal Article
Open access
PDF file
XZXuqun Zhang
Xuqun Zhang
Zhaofeng LIZhaofeng LI
Zhaofeng LI
PTPei Tai
Pei Tai
QZQing Zeng
Qing Zeng
QBQishan Bai
Qishan Bai
In cemented sand, the influences of the sampling factors (i.e., the curing time, cement–sand ratio, and initial void ratio) on the triaxial shear behavior were investigated using discrete element method. Cemented sand samples with different initial conditions were prepared and subjected to the consolidated drained triaxial shearing test. In the simulations, the peak strength, residual strength, and pre-peak stiffness of cemented sand were enhanced by increasing the curing time and cement–sand ratio, and the enhancements could be explained by the increases in bond strength and bond number. Resulting from the increases of these two sampling factors, bond breakage emerged at a greater axial strain but lower intensity. However, some uncommon phenomena were generated; that is, the contractive but strain-softening response occurred in the sample with a curing time of 3 days, and the shear band and the strain-hardening behavior coexisted in the sample with a cement–sand ratio of 1%. The peak strength and pre-peak stiffness were also enhanced by decreasing the initial void ratio, more distinctly than by increasing the curing time and cement–sand ratio. However, the residual strength, bond breakage, and failure pattern with the persistence of shear band were insensitive to this change.

13 September 2021 in Powder Technology
Verified
Journal Article
Closed access
JCJun Kang Chow
Jun Kang Chow
PTPei Tai
Pei Tai
JLJinhui Li
Jinhui Li
Zhaofeng LIZhaofeng LI
Zhaofeng LI
WWWenzeng Wang
Wenzeng Wang

19 August 2024 in Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards
Verified
Journal Article
Closed access
WZWensheng Zhang
Wensheng Zhang
JLJinhui Li
Jinhui Li
LZLimin Zhang
Limin Zhang
PTPei Tai
Pei Tai
Xiaohong ChenXiaohong Chen
Xiaohong Chen