To solve the technical problem of supporting a water-dripping roadway below contiguous seams at the Tuanbai coal mine, the deformation law of surrounding rocks for the roadway was studied using Fast Lagrangian Analysis of Continua in Three Dimensions (FLAC3D) numerical simulation. Then, a mechanical model of water-dripping rock using a bolt support was established, and further, technical countermeasures to control the deformation of the roadway with a bolt and cable support are proposed. The results show that the erosion of the water dripping on the roadway was substantial and showed notable changes over time during roadway excavation and mining work. These effects caused the road to heave slightly, but it tended to be stable during roadway excavation. Moreover, the erosion of the roof and two ribs increased exponentially, and the floor heave increased with significant displacement oscillation during mining. The anchoring length of bolts and the rock weakening from water dripping had noticeable effects on the surrounding rocks of the roadway. The logical parameters of the bolt spacing and tightening force (the bolt line spacing was 0.7–0.9 m and the tightening force exceeded 40 kN) of the bolt supports were studied and optimized. Finally, a support scheme for water dripping on the roadway at the Tuanbai coal mine is proposed. The observation data regarding the deformation of the surrounding rocks, monitoring of bolt and cable stress, endoscopy results of roof failure, and roof bed separation monitoring were used to verify the reasonableness of the scheme and ensure the requirements for support were met. The study results can serve as a reference regarding the support for water dripping on a roadway under similar conditions.
The study of evolution laws of the mining-induced stress in floor strata affected by overhead mining is extremely important with respect to the stability and support of a floor roadway. Based on the geological conditions of the drainage roadway in the 10th district in a coalmine, a mechanical model of a working face for overhead mining over the roadway is established, and the laws influencing mining stress on the roadway in different layers are obtained. The evolution of mining stress in floor with different horizontal distances between the working face and the floor roadway that is defined as LD are examined by utilizing UDEC numerical simulation, and the stability of roadway is analyzed. The results of the numerical simulation are verified via on-site tests of the deformation of the surrounding rocks and bolts pull-out from the drainage roadway. The results indicate that the mining stress in floor is high, which decreases slowly within a depth of less than 40 m where the floor roadway is significantly affected. The mining stress in the floor increases gradually, and the effect of the mining on the roadway is particularly evident within 0 m ≤ LD ≤ 40 m. Although the floor roadway is in a stress-relaxed state, the worst stability of the surrounding rocks is observed during the range -20 m ≤ LD < 0 m, in which the negative value indicates that the working face has passed the roadway. The roadway is affected by the recovery of the abutment stress in the goaf when -60 m ≤ LD <20 m, and thus it is important to focus on the strengthening support. The results may provide a scientific basis for establishing a reasonable location and support of roadways under similar conditions.