Alex Coutinho Pereira

Mr. Alex Coutinho Pereira

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 January 2023 in Energies
Verified
Journal Article
Open access
PDF file
TCTúlio Costa
Túlio Costa
Ayrlw Carvalho ArcanjoAyrlw Carvalho Arcanjo
Ayrlw Carvalho Arcanjo
AVAndrea Sarmento Maia Vasconcelos
Andrea Sarmento Maia Vasconcelos
WSWashington Silva
Washington Silva
CAClaudia Azevedo
Claudia Azevedo
Manoel Henrique Nóbrega MarinhoManoel Henrique Nóbrega Marinho
Manoel Henrique Nóbrega Marinho
This article addresses the development of the energy compensation method used for the design of hybrid energy storage systems—HBESS. The combination of two battery technologies offers better cost and performance when considering microgrid systems to provide uninterrupted power to sensitive loads (substation auxiliary system) and also provides greater energy security. In the event of a failure, the load needs to continue operating, and batteries such as lithium ions have a fast response, but are expensive for large-scale systems. However, some technologies offer low-cost and good availability of energy for long hours of discharge, such as lead–acid batteries. Consequently, different battery technologies can be used to meet all the needs of the sensitive loads. A specific method for sizing a HBESS was developed for islanded microgrids to support sensitive loads. This method was developed to meet the demand for substations outside the Brazilian standard of power systems that lack an uninterrupted and reliable energy source. The method is validated by designing a microgrid to support the auxiliary systems of a transmission substation in northeastern Brazil. The results showed a system with a capacity of 1215 kWh of lead-carbon and 242 kWh of lithium ions is necessary to maintain an islanded microgrid for at least 10 h. Furthermore, the microgrid comprises a PV plant with an AC output power of 700 kW in connected operation and 100 kW when islanded from the grid.

5 July 2023 in Energies
Verified
Journal Article
Open access
PDF file
AGAilton Gonçalves
Ailton Gonçalves
GCGustavo Oliveira Cavalcanti
Gustavo Oliveira Cavalcanti
MFMARCILIO FEITOSA
MARCILIO FEITOSA
RFRoberto Feliciano Dias Filho
Roberto Feliciano Dias Filho
APAlex Coutinho Pereira
Alex Coutinho Pereira
LMLuis Arturo Gómez Malagón
Luis Arturo Gómez Malagón
Electric substations (ESS) are important facilities that must operate even under contingency to guarantee the electrical system’s performance. To achieve this goal, the Brazilian national electricity system operator establishes that alternating current (AC) auxiliary systems of ESS must have, at least, two power supplies, and in the case of failure of these sources, an emergency generator (EG) must at least supply energy to the essential loads. In order to improve the availability of auxiliary systems, a microgrid with other sources, such as photovoltaic (PV) systems and Battery Energy Storage Systems (BESS), can be an alternative. In this case, an economical optimization of the PV/BESS system must be addressed considering the costs associated with the installation and maintenance of equipment, and the gains from the credits generated by the photovoltaic system in the net metering scheme. In this paper, the size of the BESS system was determined to supply energy to the load of auxiliary systems of an ESS, as well as a PV system to achieve a null total cost. Furthermore, multi-objective optimization using the genetic algorithm technique was employed to optimize the size of the hybrid PV/BESS to minimize the investment cost and time when the demand was not met. Simulations under different scenarios of contingency were allowed to obtain the Pareto frontier for the optimal sizing of a PV/BESS system to supply energy to AC auxiliary systems in an ESS under contingency.

15 September 2023 in Energies
Verified
Journal Article
Open access
PDF file
JOJoão Fausto de Oliveira
João Fausto de Oliveira
PNPaulo De Mattos Neto
Paulo De Mattos Neto
Hugo Valadares SiqueiraHugo Valadares Siqueira
Hugo Valadares Siqueira
DJDomingos S. Oliveira Santos Jr.
Domingos S. Oliveira Santos Jr.
ALAranildo Lima
Aranildo Lima
Manoel Henrique Nóbrega MarinhoManoel Henrique Nóbrega Marinho
Manoel Henrique Nóbrega Marinho
The worldwide appeal has increased for the development of new technologies that allow the use of green energy. In this category, photovoltaic energy (PV) stands out, especially with regard to the presentation of forecasting methods of solar irradiance or solar power from photovoltaic generators. The development of battery energy storage systems (BESSs) has been investigated to overcome difficulties in electric grid operation, such as using energy in the peaks of load or economic dispatch. These technologies are often applied in the sense that solar irradiance is used to charge the battery. We present a review of solar forecasting methods used together with a PV-BESS. Despite the hundreds of papers investigating solar irradiation forecasting, only a few present discussions on its use on the PV-BESS set. Therefore, we evaluated 49 papers from scientific databases published over the last six years. We performed a quantitative analysis and reported important aspects found in the papers, such as the error metrics addressed, granularity, and where the data are obtained from. We also describe applications of the BESS, present a critical analysis of the current perspectives, and point out promising future research directions on forecasting approaches in conjunction with PV-BESS.

16 January 2023 in Energies
Verified
Journal Article
Open access
PDF file
WJWashington de Araujo Silva Júnior
Washington de Araujo Silva Júnior
AVAndrea Sarmento Maia Vasconcelos
Andrea Sarmento Maia Vasconcelos
Ayrlw Carvalho ArcanjoAyrlw Carvalho Arcanjo
Ayrlw Carvalho Arcanjo
TCTúlio Costa
Túlio Costa
RNRafaela Nascimento
Rafaela Nascimento
Manoel Henrique Nóbrega MarinhoManoel Henrique Nóbrega Marinho
Manoel Henrique Nóbrega Marinho
Substation (SS) auxiliary systems (SAux) are facilities responsible for hosting the alternating (AC) and direct current (DC) busbar to serve the equipment and systems that perform the substation’s protection, control, and supervision. External and internal power supplies typically ensure the continuity of such a facility. The electricity support will be restricted to diesel emergency generators (DG) if the external power supply is unavailable due to a contingency. The DG present a slower response time and are susceptible to starting failures. Microgrids with Battery Energy Storage Systems (BESS) paired with photovoltaic systems (PV) are presented as an innovative and reliable solution for powering the SAux. In this article, tests were carried out on the microgrid of the Edson Mororó Moura Institute of Technology (ITEMM) in Brazil to support the use of microgrids BESS/PV in the SAux of a transmission SS of the São Francisco Hydroelectric Company (Chesf). Without an external power supply, BESS commands the action of islanded operation, maintaining both voltage and frequency requirements of the microgrid without load shedding. It was possible to observe all operations of the microgrid. The experimental results showed that the solution proposed in the paper implements a dependable self-dispatchable autonomous power supply.

15 July 2023 in Energies
Verified
Journal Article
Open access
PDF file
MCMariana de Morais Cavalcanti
Mariana de Morais Cavalcanti
TCTúlio Costa
Túlio Costa
APAlex Coutinho Pereira
Alex Coutinho Pereira
Eduardo Boudoux JatobaEduardo Boudoux Jatoba
Eduardo Boudoux Jatoba
JFJosé Bione de Melo Filho
José Bione de Melo Filho
Manoel Henrique Nóbrega MarinhoManoel Henrique Nóbrega Marinho
Manoel Henrique Nóbrega Marinho
This paper presents case studies for replacing diesel generators (DGs) that are used as the main and emergency power sources for alternating current (AC) auxiliary services in substations (SS) within the transmission network (voltage greater than or equal to 230 kV). The objective of this research is to present a solution that is more reliable, environmentally friendly, and financially viable than DGs. To achieve this, the proposed solutions incorporate Battery Energy Storage Systems (BESSs) with or without the integration of Photovoltaic (PV) Systems. These solutions were simulated using the HOMER PRO Version 3.14.5 software for the Messias SS /AL, and the results were analyzed and compared to the DG in terms of reliability, financial viability, and environmental impact. Based on the conducted analyses, the BESS solution with the PV system was found to be the most suitable for the main source. However, in the case of the emergency source, if one of the main sources is a DG/BESS, maintaining the emergency DG is the preferable option. If both main sources are independent, the BESS solution with the PV system is a suitable solution.