Guowei Zhu

Dr. Guowei Zhu


Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 June 2022 in PLOS ONE
Verified
Journal Article
Open access
PDF file
YLYao Li
Yao Li
GZGuowei Zhu
Guowei Zhu
QZQingchao Zhang
Qingchao Zhang
Numerical simulation is very important to solve geotechnical problems. However, it is difficult to obtain required comprehensive and accurate information such as parameters, boundary conditions, and etc. In this paper, a grey distributed parameter model, which integrates the finite element method (FEM) with the grey system theory, was proposed to address the issue. The analysis of grey properties on rock and soil system was performed. The equilibrium equations, geometric equations, physics equations and related differential equations were obtained, each of the equations contains grey parameters and variables. And the discretization and solution methods of the FEM with the grey variables were discussed. An example of deep-buried circular mining tunnel was applied to test the proposed model. The calculation results were compared with those of the exact solution (analytical solution) and the classical FEM, respectively, through which the rationality of the proposed model was demonstrated. For the first time, grey variables and grey parameters are defined in geotechnical numerical simulation. The expressions of basic equations with grey variables are given respectively. A grey distributed parameter model which integrates the FEM with the grey system theory is proposed to solve geotechnical problems, and the optimal solution to the proposed model is determined through calculation and comparison of an application example. The proposed numerical model with grey variables not only has the advantage of grey system theory, but also greatly improves the adaptability and application effect of the model, which contributes to the prediction and evaluation problems in geological engineering, geotechnical engineering, water conservancy engineering and civil engineering with complex structures.


10 July 2016 in Modern Physics Letters B
Verified
Journal Article
Closed access
GZGuowei Zhu
Guowei Zhu
XWxianpei wang
xianpei wang
MTMeng Tian
Meng Tian
DDDangdang Dai
Dangdang Dai
JLJiachuan Long
Jiachuan Long
QZQilin Zhang
Qilin Zhang

19 April 2024 in Energies
Verified
Journal Article
Open access
PDF file
CZChenyang Zhu
Chenyang Zhu
GZGuowei Zhu
Guowei Zhu
玉宫玉菲 宫 宫
玉菲 宫 宫
LZLei Zhang
Lei Zhang
To study the influence of coal mining on the water richness overlying strata in the mining area using time-lapse electrical monitoring technology, four dataset acquisitions were completed with the same acquisition method, equipment, parameters, and processing flow. According to the characteristics of the data, major problems such as topographic correction, high-precision denoising, spatial and temporal normalization, and resistivity data inversion have been solved. Precise tomographic imaging was achieved through high-precision data processing and difference inversion. The results show that the electrical stratification characteristics of the overlying soil and rock layers are clear, the resistivity from the surface down gradually increases, and the electrical layers are not uniform locally. During mining, the overlying strata are affected by mining, the electrical resistivity of the underlying aquifers increased to varying degrees, and the fluctuation of electrical resistivity increased while the aquifer’s water content decreased. After mining, the overlying aquifer has the phenomenon of ‘reduced resistivity and water recovery’. After a period of time, the overlying soil disturbance and overlying rock failure zone will gradually tend to be stable. Meanwhile, the aquifer structure and water content will also gradually recover. Our results could provide guidance for water resources protection in this region.

8 June 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JZJunjie Zhou
Junjie Zhou
YWYanhui Wu
Yanhui Wu
QZQingchao Zhang
Qingchao Zhang
ZNZhen Nie
Zhen Nie
TDTao Ding
Tao Ding
GZGuowei Zhu
Guowei Zhu
Existing goaves (e.g., shafts and roadways) in mines represent important hidden dangers during the production of underlying coal seams. In this view, the accurate identification, analysis, and delimitation of the scope of goaves have become important in the 3D seismic exploration of mines. In particular, an accurate identification of the boundary swing position of goaves for 3D seismic data volumes within a certain depth interval is key and difficult at the same time. Here, a wide-band and wide-azimuth observation system was used to obtain high-resolution 3D seismic data. The complex structure of a mine was analyzed, and a seismic double processing system was applied to verify the fine processing effect of a goaf and improve the resolution of the 3D seismic data. Based on the seismic attribute identification characteristics of the goaf structure, we decided to adopt multi-attribute comprehensive identification and data fusion technologies to accurately determine the position of the goaf and of its boundary. Combining this information with the mine roadway engineering layout, we verified the accurateness and correctness of the goaf boundary location. Our study provides a good example of the accurate identification of the 3D seismic data of a roadway goaf.

7 September 2023 in Interpretation
Verified
Journal Article
Closed access
玉宫玉菲 宫 宫
玉菲 宫 宫
CZChenyang Zhu
Chenyang Zhu
GZGuowei Zhu
Guowei Zhu
LZLei Zhang
Lei Zhang
GZGuanGui Zou
GuanGui Zou
Accurate fault identification in coal mines is important to improve mine safety and economic benefits. We compare various intelligent algorithms for data preprocessing and optimization and analyze the construction methods of seismic attribute data sets and the performance of intelligent optimization algorithms using fault identification accuracy as the discrimination index to find a better combined model for seismic fault identification. First, the training data set is constructed by mining the fault and nonfault information revealed by the roadway. The distribution characteristics of the seismic attribute data indicate similarities among them, and they are nonlinearly separable. Directly using the attributes to construct the data set, the accuracy of fault identification using the support vector machine (SVM) model is 78.41%. Principal component analysis (PCA) and self-organizing mapping (SOM) neural networks are used to extract effective information and then combined with the SVM classification model, and the accuracy of fault identification is 83.82% and 87.47%, respectively. Compared with the original data and PCA dimensionality reduction data, the accuracy of fault detection is improved by 9.06% and 3.66%, respectively, indicating that SOM can effectively improve the accuracy of fault detection by eliminating similar attributes and reducing the weight of redundant information. Then, through a fixed attribute data set, genetic algorithm (GA), particle swarm optimization (PSO), and gray wolf optimizer (GWO) intelligent optimization algorithms are used to find the optimal kernel function parameter and penalty parameter of the SVM classifier. The accuracy rate of the SOM-GWO-SVM model reaches 91.12%, compared with the SOM-PSO-SVM and SOM-GA-SVM, and the model accuracy is increased by 5.2% and 5.61%, respectively. Compared with PSO and GA, the GWO algorithm has a better global search ability. The identification result of the SOM-GWO-SVM model is closest to the actual fault exposure, especially for the identification of “short” faults and associated faults, which has obvious advantages over the traditional manual interpretation in terms of efficiency and accuracy.