Due to the complexity of risk factors in constructing immersed tube tunnels, it is impossible to accurately identify risks. To solve this problem, and the uncertainty and fuzziness of risk factors, a risk assessment method for immersed tube tunnel construction was proposed based on WBS-RBS (Work Breakdown Structure-Risk Breakdown Structure), improved AHP (analytic hierarchy process), and cloud model theory. WBS-RBS was used to analyze the risk factors of immersed tube tunnel construction from the aspects of the construction process and 4M1E, and built a more comprehensive and accurate construction risk index system. The weight of each index was calculated by the improved AHP of a genetic algorithm. The cloud model theory was used to build the cloud map of risk assessment for immersed tunnel construction and evaluate construction risk. Taking the Dalian Bay subsea tunnel project as an example, the risk assessment method of immersed tunnel construction was verified. The results showed that this method not only solved the problem of failing the consistency check in the higher-order judgment matrix but also improved the consistency pass rate by 33.3% and accurately reflected the risk assessment results. The assessment results show that the construction risk level of the Dalian Bay submarine-immersed tunnel is medium. The risk level of indicators “slope instability” and “water-stop damage” are high risk, while “pipe section cracking”, “low underwater alignment accuracy”, “uneven crimping of a water-stop”, and “uneven substrate treatment” are medium risk. This provides a reference for the risk assessment study of immersed tunnel construction.

9 October 2025
Verified
Book Chapter
Open access
PDF file
DQDongyin Qi
Dongyin Qi
FYFei Yu
Fei Yu
The risk factors in the construction of subway shield tunnels have complex and variable characteristics. To address the impact of these characteristics in the evaluation process, a risk assessment method for subway tunnel shield tunneling through the biogas layer construction using WBS-RBS, AHP combined with cloud models is proposed. The WBS-RBS method is used to analyze the construction risk factors from the construction stage and 4M1E, and 24 risk indicators are identified. Use AHP to calculate the weight of risk indicators. Construction risk assessment model is constructed by cloud model theory to evaluate construction risk. Based on the construction project of Hangzhou–Haining Intercity Railway under biogas layer, this paper verifies the construction risk assessment method of subway tunnel under biogas layer with shield. The case study shows that the construction risk of biogas layer under the shield of Hangzhou–Haining Intercity Railway tunnel is medium risk. This paper provides reference value for the analysis and control of the construction risk factors of biogas layer under the shield of subway tunnel.