Sihui Dong

Prof. Dr. Sihui Dong

Dalian Jiaotong University, Dalian, Liaoning, China
orcid

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 June 2022 in Scientific Reports
Verified
Journal Article
Open access
PDF file
SDSihui Dong
Sihui Dong
FYFei Yu
Fei Yu
Kang WangKang Wang
Kang Wang
For safety engineering majors, it is very important to cultivate the practical ability of professional talents. Due to the difficulty of conducting experiments in dangerous environments, a virtual simulation experiment teaching platform was established. The platform allowed students to understand the structure of the subway ventilation room, and master the control requirements of the ventilation system in the event of sudden fire, blockage, and failure in the subway. Its construction used technologies such as 3D modeling, human–computer interaction, and VR. To test the teaching effect of the simulation experiment platform, two indexes of operating skills and cognitive load were selected to study and analyze the experimental results of students. The research adopts the method of stratified sampling, 46 boys and 10 girls were selected from the first-year students majoring in safety engineering, and they were randomly divided into experimental group and control group, with 23 boys and 5 girls in each group. The experimental group used the simulation platform for teaching, while the control group used the traditional teaching method. The score of the assessment module in the platform was taken as the index of students’ operating skills, and the cognitive load test was carried out by questionnaire to test the teaching effect. The test module scores showed that the average score of the experimental group was 32.79 points higher than that of the control group, and the results of the cognitive load test questionnaire showed that the experimental group scored 35.14% lower than the control group. The research shows that the virtual simulation experiment has a stronger teaching effect than the field experiment.

24 August 2022 in PLOS ONE
Verified
Journal Article
Open access
PDF file
SDSihui Dong
Sihui Dong
FYFei Yu
Fei Yu
Kang WangKang Wang
Kang Wang
The rail transit vehicle system is an important subsystem with the most frequent operation accidents and the most direct impact on passengers. Based on the particularity of the vehicle system and the complexity of the system, the hierarchical analysis method (AHP) is used to evaluate its safety. High-order judgment matrix often has inconsistency, and the judgment matrix consistency guarantee is the key to the hierarchical analysis method applied. Based on the hierarchical analysis principle, this paper corrects the inconsistency judgment matrix and realizes the optimization calculation based on the genetic algorithm. This paper constructs a vehicle system safety evaluation index system including 26 indexes at three layers and uses the fuzzy comprehensive evaluation method to evaluate the system safety level. The results show that the calculation results based on the improved AHP-GA are significantly better than that based on the conventional AHP method. The comprehensive evaluation conclusion of the case is "average", and the safety level of the vehicle system of the case enterprise needs to be strengthened.

27 July 2007 in Water Resources Management
Verified
Journal Article
Closed access
PDF file
SDSihui Dong
Sihui Dong

23 March 2023 in Processes
Verified
Journal Article
Open access
PDF file
SDSihui Dong
Sihui Dong
SLShiqun Li
Shiqun Li
FYFei Yu
Fei Yu
Kang WangKang Wang
Kang Wang
Due to the complexity of risk factors in constructing immersed tube tunnels, it is impossible to accurately identify risks. To solve this problem, and the uncertainty and fuzziness of risk factors, a risk assessment method for immersed tube tunnel construction was proposed based on WBS-RBS (Work Breakdown Structure-Risk Breakdown Structure), improved AHP (analytic hierarchy process), and cloud model theory. WBS-RBS was used to analyze the risk factors of immersed tube tunnel construction from the aspects of the construction process and 4M1E, and built a more comprehensive and accurate construction risk index system. The weight of each index was calculated by the improved AHP of a genetic algorithm. The cloud model theory was used to build the cloud map of risk assessment for immersed tunnel construction and evaluate construction risk. Taking the Dalian Bay subsea tunnel project as an example, the risk assessment method of immersed tunnel construction was verified. The results showed that this method not only solved the problem of failing the consistency check in the higher-order judgment matrix but also improved the consistency pass rate by 33.3% and accurately reflected the risk assessment results. The assessment results show that the construction risk level of the Dalian Bay submarine-immersed tunnel is medium. The risk level of indicators “slope instability” and “water-stop damage” are high risk, while “pipe section cracking”, “low underwater alignment accuracy”, “uneven crimping of a water-stop”, and “uneven substrate treatment” are medium risk. This provides a reference for the risk assessment study of immersed tunnel construction.

7 October 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
SDSihui Dong
Sihui Dong
JLjinxiao lv
jinxiao lv
Kang WangKang Wang
Kang Wang
WLWanjing Li
Wanjing Li
YTYining Tian
Yining Tian
To solve the disadvantages of the low protection grade, high weight, and high cost of the existing locomotive power battery system, this study optimizes the existing scheme and introduces the design concept of two-stage protection. The purpose of the research is to improve the protection level of the battery pack to IP68, to optimize the sheet metal power battery box structure into a more lightweight frame structure, to simplify the cooling mode of the battery pack for natural air cooling, and to improve the battery protection level and maintain the heat exchange capability. In the course of the study, a design scheme with a two-stage protection function is proposed. The numerical model analyzes the self-load, transverse load, longitudinal load, mode, and fatigue, and optimizes the layout of the power tank cell. The optimized box model was physically tested and economically compared. The results show that: (1) The maximum load stress is 128.4 MPa, which is lower than 235 MPa, the ultimate stress of the box material, and the fatigue factor of the frame box structure is 3.75, which is higher than 1.0, and it is not prone to fatigue damage. (2) Under the low-temperature heating condition, the overall temperature rise of the battery pack is 4.3 °C, which is greater than 2.3 °C under the air conditioning heat dissipation scheme. Under the high-temperature charging condition, the overall temperature rise of the battery pack is 2.0 °C, and the temperature value is the same as the temperature rise under the air conditioning cooling scheme. Under the high-temperature discharge condition, the overall temperature rise of the battery pack is 3.0 °C, and the temperature value is greater than 2.1 °C under the air conditioning heat dissipation scheme. At the same time, the temperature rise under the three working conditions is less than the 15 °C stipulated in the JS175-201805 standard. The simulation results show that the natural airflow and two-stage protection structure can provide a good temperature environment for the power battery to work. (3) The optimized box prototype can effectively maintain the structural integrity of the battery cell in the box in extreme test cases, reducing the probability of battery fire caused by battery cell deformation. (4) The power battery adopts a two-stage protection design under the battery power level, which can simultaneously achieve battery protection and prevent thermal runaway, while reducing costs. The research results provide a new concept for the design of a locomotive power battery system. (5) The weight of the optimized scheme is 2020 kg, and the original scheme is 2470 kg; thus, the reduction in weight is 450 kg. Meanwhile, the volume of the optimized scheme is 1.49 m3, and the original scheme is 1.93 m3; thus, the reduction in volume is 0.44 m3.

29 March 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
SDSihui Dong
Sihui Dong
Kang WangKang Wang
Kang Wang
CJChenxu Jia
Chenxu Jia
The special emergency plan for subway fires in China stipulates that when a fire occurs at a train stop, it is necessary to confirm whether the fire mode of the tunnel ventilation system is implemented. Because of the setting mode of tunnel ventilation and smoke exhaust in the station track area, the smoke exhaust at the rail top and tunnel cannot operate at the same time. To study the influence of rail top smoke exhaust and tunnel smoke exhaust on subway fire smoke control when a train stops at a station, we take an island station as an example. A 1:1 full-scale numerical model is established to study the smoke spread area, temperature field distribution, and carbon monoxide concentration. The results show that when a train fire occurs in a subway station, the rail top smoke exhaust mode has the best smoke exhaust effect compared with the other three smoke exhaust modes. In this mode, the smoke diffusion in the carriage is the slowest and the available escape time of personnel is the longest. Therefore, it is recommended to adopt the rail top smoke exhaust mode in case of train fire in the subway station; that is, open the smoke exhaust outlet on the rail top for smoke exhaust, and organize personnel to evacuate to the safe position of the platform through the connecting channel and escape exit. If conditions permit, local small fans can also be added to meet the requirements of smoke exhaust. The research results can provide guidance for the emergency plan and provide strong support for promoting the improvement of the fire emergency plan.