Single-task construction robots (STCRs) have become a popular research topic for decades. However, there is still a gap in the ubiquitous application of STCRs for onsite construction due to various reasons, such as cost concerns. Therefore, cost–benefit analysis (CBA) can be used to measure the net economic benefit of the STCRs, compared to traditional construction methods, in order to boost the implementation of STCRs. This paper presents a simple and practical framework for the economic evaluation of STCRs and conducts a case study of a cable-driven facade installation robot to verify the method. The results show that the cable-driven robot for facade installation is worth investing in in the UK, as well as in the majority of G20 countries. Furthermore, other socioenvironmental implications of STCRs and the limitations of the study are also discussed. In conclusion, the proposed method is highly adaptable and reproducible. Therefore, researchers, engineers, investors, and policy makers can easily follow and customize this method to assess the economic advantages of any STCR systems, compared to traditional construction technologies.
(1) The overall energy requirement of a building may be impacted by the building design, the selection of materials, the construction methods, and lifecycle management. To achieve an optimum energy-efficiency level when dealing with a new building or renovation project, it is important to improve the entire construction process as it is not enough to merely focus on the operational phase. If conventional construction practices do not evolve, compromise, or adapt to necessary changes, then it becomes challenging to deliver an ultimate low energy building. (2) This paper demonstrates the trend of off-site prefabrication and its production principles and the notions of open-building design and Design for X, as well as offering an overview of the development of automation in construction, which provides both insights and evaluations based on the context of the research. (3) Three European Union Horizon 2020 research projects were evaluated, and the outcome of the projects served as the backbone for the research and inspired the design of the proposed integrated façade system. Two design scenarios were proposed to demonstrate the potential improvements that could be achieved in a new build as well as in renovation projects. (4) The research lays a foundation for establishing a larger cross-disciplinary collaboration in the future.
Prefabricated modules are being used to renovate the building envelope. However, compared to manual methods, the design and prefabricated module’s definition is time consuming. Therefore, it is necessary to improve the efficiency of the prefabricated layout definition processes by incorporating automation and computational design. The purpose of this paper is to present a semi-automated definition of the layout of the prefabricated modules with the only input of the existing building facade being the Point Cloud. In this research, a novel step-by-step workflow was developed. More precisely, an algorithm was developed that processes the coordinates of each point of the cloud and generates the layout of the prefabricated modules. To validate the workflow and the algorithm, four facades were tested, considering two parameters: (a) working time and (b) output accuracy. According to the results, it was concluded that spending more time achieving an accurate laser data acquisition can be a good strategy to obtain the primary layout with sufficient precision.
The rising global energy demand has made it essential to reduce energy consumption in the residential building stock. Adding a new insulating envelope with Renewable Energy Sources (RESs) onto the existing buildings’ facade is one way to achieve zero energy consumption in residential buildings. The ENSNARE project aims to semi-automate this process by using prefabricated facade modules and developing new building data acquisition techniques. Prior to this research project, an analysis was carried out and several research gaps were identified. One of the obstacles to using prefabricated modules with RES is that the layout needs to be drawn and adjusted during different phases of the project. That is time-consuming. For this reason, this article describes two new solutions: (1) automated drafting of the optimized layout of prefabricated modules of the facade and the number of solar panels based on the existing residential building model, and (2) automated adjustment of the layout depending on the phase of the renovation project and the accuracy of the measurements in each step. The proposed semi-automated approach has the potential to significantly reduce the time used in drafting the layout of the prefabricated modules, which benefits the whole renovation process, contributing to a more sustainable future for the residential building stock.