Excessive surface settlement poses significant challenges to shield tunnelling construction, resulting in damage to adjacent buildings, infrastructure, and underground pipelines. This study focused on investigating the surface settlement induced by shield tunnelling during the construction of Qingdao Metro Line 6 between Haigang Road Station and Chaoyang Road Station. Firstly, the settlement data from the left line of the shield tunnel were evaluated by grey relational analysis. The relational coefficients were calculated to assess the correlation degrees of each influential parameter. Subsequently, the four critical influential parameters with the highest relational degrees were chosen to investigate their effects on surface settlement through numerical simulations under different scenarios. The results show that the four parameters with the highest relational degrees were thrust, grouting pressure, earth pressure, and strata elastic modulus. It should be noted that the strata elastic modulus significantly affects surface settlement, while the grouting pressure influences the settlement trough width in weak strata. Moreover, improper thrust magnitude can lead to an increase in surface settlement. Based on these findings, recommendations are proposed for the right-line tunnel construction and practical countermeasures for surface settlement during shield tunnelling construction are provided.
As the main cutting tool of Tunnel Boring Machine (TBM) for rock-breaking, the rock-breaking efficiency of TBM disc cutters directly affects the TBM’s boring speed, which in turn affects the overall progress of the tunnelling project. Therefore, a simple and accurate evaluation method of the rock-breaking efficiency of TBM disc cutters is an essential prerequisite to improve the rock-breaking performance of TBM. In this paper, the classical force prediction equations of disc cutters were summarized and the applicability of each equation for the constant cross-section disc cutters was analyzed. The calculation equation of the specific energy per ring of TBM rock-breaking was derived based on the Rostami prediction equations and the specific energy theory for disc cutter rock-breaking. The specific energy per ring equation was verified through a practical engineering case. The results show that the maximum relative error of the effective thrust force and the effective torque of the cutter head based on the Rostami force prediction equations is 9.8%. The relative error of the specific energy per ring is 8.0%, which indicates that the prediction of the specific energy per ring equation can accurately reflect the rock-breaking efficiency of disc cutters. The derived equation of the specific energy per ring can not only simplify the rock-breaking efficiency evaluation of TBM disc cutters, but also serve as a valuable reference for practical engineering projects.
In fracture zones, tunneling with a double-shield Tunnel Boring Machine (TBM) presents significant challenges, including deformation overrun of the surrounding rock, TBM jamming, and excavation face collapse. To assure the tunnel construction safety and efficiency, it is necessary and crucial to conduct a stability analysis of the tunnel surrounding rock when a TBM passes through the fracture zones. The tunnels from Jiadingshan Road Station to Anshan Road Station in Qingdao Metro Line 8 are constructed by double-shield TBMs. It inevitably passes through fracture zones with different deterioration levels and dip angles. In this study, based on this construction section, numerical models of fracture zones with different deterioration levels and dip angles were developed to analyze the displacements of tunnel vaults, inverts, and haunches. In addition, the maximum shear stresses of the surrounding rock were analyzed. Finally, the displacement and shear stress variation patterns of the surrounding rock with different deterioration levels and dip angles were obtained. The findings reveal the stability behavior of tunnels under various fracture zones. They can serve as a valuable reference and theoretical foundation for future tunnel construction projects utilizing double-shield TBMs in areas with fracture zones.
Existing component-based models have difficulty interpreting the field response of earth pressure balance (EPB) shield tunneling parameters when the excavation face gradually changes from hard rock to sandy strata. To address this problem, this study proposes a mechanism-informed semi-empirical analysis based on a continuous face sand fraction function, , which represents the evolution of the sand-bearing area fraction at the excavation face along the shield advance direction. The function is constructed from the geological profile and is used as a continuous reformulation of existing face-composition descriptors such as rock/sand ratio and composite ratio. Based on , engineering-equivalent models for total thrust and cutterhead torque are developed and evaluated using field tunneling data from Qingdao Metro Line 15 and Line 5. The Dandan right-line data are used for parameter calibration, while the Basi right-line data from Rings 590–650 are used for independent validation without further parameter tuning. The results show that the η-related correction term improves the independent validation performance of the total thrust model, reducing the MAPE from 22.56% to 14.25%. In contrast, cutterhead torque exhibits stronger operational variability and interval-specific baseline offset. After applying a baseline correction determined from the stable hard-rock section of the Basi interval, the ring-scale torque MAPE decreases from 44.07% to 17.25%, but the additional -related torque contribution remains limited. These results indicate that total thrust is more sensitive to the gradual increase in face sand fraction, whereas cutterhead torque is more strongly influenced by machine condition, cutter wear, and operational control. The proposed approach provides a field-based semi-empirical reference for interpreting tunneling parameter responses in similar hard-rock-to-sandy-strata transition zones.
When an earth pressure balance (EPB) shield operates in hard rock under air-assisted excavation, the conventional face-pressure term for full-chamber EPB operation is no longer directly applicable, while chamber air pressure and cutterhead–rock interaction become important components of the axial load. This study proposes an axial force-balance model for partially filled air-assisted excavation in hard rock. An effective air-pressure action-area coefficient is introduced to account for uncertainty in the air-pressure reaction, while unit-penetration torque, together with cutterhead rotational speed and advance rate, is used to represent the equivalent hard-rock excavation resistance. Field data from a hard-rock section of the Qingdao Metro are used for parameter identification, air-pressure-term ablation, sensitivity analysis, continuous-block validation, and cross-line validation. At the representative condition of χa = 0.75, the left-line model achieves R2 = 0.771, an RMSE of 1158.6 kN, and a correlation coefficient of 0.878 between measured and calculated total thrusts. Removing the air-pressure reaction reduces model accuracy and markedly increases the correlation between the residuals and air pressure, confirming that this term cannot be neglected. Refitting the same model structure to the right line yields R2 = 0.647, whereas direct transfer of the left-line parameters performs poorly. This indicates cross-line applicability of the model structure but condition dependence of its parameters. The proposed model provides a physically constrained framework for interpreting ring-averaged shield thrust and evaluating deviations between measured and calculated thrusts during air-assisted excavation in hard rock.