Mingtao Ji

Mingtao Ji

Auto-generated profile, based on publicly available information

Mingtao Ji

School of Civil Engineering, Qingdao University of Technology, Qingdao 266520, China

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 March 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
MJMingtao Ji
Mingtao Ji
Xuchun WangXuchun Wang
Xuchun Wang
MLMinhe Luo
Minhe Luo
DWDing Wang
Ding Wang
HTHongwei Teng
Hongwei Teng
MDMingqing Du
Mingqing Du
In fracture zones, tunneling with a double-shield Tunnel Boring Machine (TBM) presents significant challenges, including deformation overrun of the surrounding rock, TBM jamming, and excavation face collapse. To assure the tunnel construction safety and efficiency, it is necessary and crucial to conduct a stability analysis of the tunnel surrounding rock when a TBM passes through the fracture zones. The tunnels from Jiadingshan Road Station to Anshan Road Station in Qingdao Metro Line 8 are constructed by double-shield TBMs. It inevitably passes through fracture zones with different deterioration levels and dip angles. In this study, based on this construction section, numerical models of fracture zones with different deterioration levels and dip angles were developed to analyze the displacements of tunnel vaults, inverts, and haunches. In addition, the maximum shear stresses of the surrounding rock were analyzed. Finally, the displacement and shear stress variation patterns of the surrounding rock with different deterioration levels and dip angles were obtained. The findings reveal the stability behavior of tunnels under various fracture zones. They can serve as a valuable reference and theoretical foundation for future tunnel construction projects utilizing double-shield TBMs in areas with fracture zones.

2 November 2026 in Geotechnics
Verified
Journal Article
Open access
PDF file
Guangzhao ZhangGuangzhao Zhang
Guangzhao Zhang
DWDing Wang
Ding Wang
XWXuchun Wang
Xuchun Wang
MJMingtao Ji
Mingtao Ji
YZYanbo Zhang
Yanbo Zhang
HHHaotian Huang
Haotian Huang
When an earth pressure balance (EPB) shield operates in hard rock under air-assisted excavation, the conventional face-pressure term for full-chamber EPB operation is no longer directly applicable, while chamber air pressure and cutterhead–rock interaction become important components of the axial load. This study proposes an axial force-balance model for partially filled air-assisted excavation in hard rock. An effective air-pressure action-area coefficient is introduced to account for uncertainty in the air-pressure reaction, while unit-penetration torque, together with cutterhead rotational speed and advance rate, is used to represent the equivalent hard-rock excavation resistance. Field data from a hard-rock section of the Qingdao Metro are used for parameter identification, air-pressure-term ablation, sensitivity analysis, continuous-block validation, and cross-line validation. At the representative condition of χa = 0.75, the left-line model achieves R2 = 0.771, an RMSE of 1158.6 kN, and a correlation coefficient of 0.878 between measured and calculated total thrusts. Removing the air-pressure reaction reduces model accuracy and markedly increases the correlation between the residuals and air pressure, confirming that this term cannot be neglected. Refitting the same model structure to the right line yields R2 = 0.647, whereas direct transfer of the left-line parameters performs poorly. This indicates cross-line applicability of the model structure but condition dependence of its parameters. The proposed model provides a physically constrained framework for interpreting ring-averaged shield thrust and evaluating deviations between measured and calculated thrusts during air-assisted excavation in hard rock.