VICENTE SALVADOR MARTÍNEZ LIRÓN

Mr. VICENTE SALVADOR MARTÍNEZ LIRÓN

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 April 2023 in Construction and Building Materials
Verified
Journal Article
Closed access
JAJoaquin Abellan-Garcia
Joaquin Abellan-Garcia
MKM. Iqbal Khan
M. Iqbal Khan
Yassir AbbasYassir Abbas
Yassir Abbas
VLVICENTE SALVADOR MARTÍNEZ LIRÓN
VICENTE SALVADOR MARTÍNEZ LIRÓN
JCJuan S. Carvajal-Muñoz
Juan S. Carvajal-Muñoz

7 April 2023 in Buildings
Verified
Journal Article
Open access
PDF file
Francisco Pellicer MartínezFrancisco Pellicer Martínez
Francisco Pellicer Martínez
VLVICENTE SALVADOR MARTÍNEZ LIRÓN
VICENTE SALVADOR MARTÍNEZ LIRÓN
AHAlejandro Mateo Hernández-Díaz
Alejandro Mateo Hernández-Díaz
Jorge Pérez-AracilJorge Pérez-Aracil
Jorge Pérez-Aracil
JLJosé Antonio López-Juárez
José Antonio López-Juárez
Building foundations are usually retrofitted with directly connected micropiles; however, at the present time, there are different approaches for predicting shear capacity in the micropile–foundation connection. At first, the concrete shear strength was considered. Nowadays, in the EU countries, it is prescribed to use the shear strength of the interface between successive concrete casts at different times. This implies a reduction of the connection capacity by half, and these values are not in consonance with the lab results. This work analyses the economic impact of the previous considerations on retrofit projects with micropiles. To this aim, firstly, seven different formulations were applied to 29 building projects, and the results were compared. Secondly, a Monte Carlo sensitivity analysis was performed using bond stress distribution data obtained from lab tests. Thus, numerical results acquired by comparing European and American regulations show an average difference in cost of around 40%, which may reach up to 50%. Moreover, the Monte Carlo simulation confirms that the connection strength may become a limitation in retrofit projects, also indicating that the application of European codes usually leads to the most expensive designs. Finally, the results show that it is not worth improving the connection to exceed a bond stress of 0.60 MPa, since no relevant savings are produced by achieving higher values.