The high water content of the surrounding rock in loess tunnels will lead to the deterioration of rock strength, causing deformation and damage to the initial support structure and thereby affecting safety during construction and operation. This article first analyzes the strength characteristics of loess under different water contents through indoor physical and mechanical tests. Secondly, based on numerical simulation results, the ecological environment, and design requirements, the water content threshold is determined. Finally, a reinforcement scheme combining surface precipitation measures and curtain grouting measures is proposed, and the reinforcement effect is analyzed based on on-site monitoring data. The results show that as the water content of loess increases, the cohesion, internal friction angle, and elastic modulus of the surrounding rock all decrease, leading to an increase in the sensitivity of the surrounding rock to excavation disturbances and a deterioration in strength. During the construction process, it shows an increase in the vault settlement and sidewalls’ convergence. During the process of increasing the distance between the monitoring section and the palm face, the settlement and convergence of the tunnel show a rapid growth stage, slow growth stage, and stable stage. The water content threshold is determined to be 22%. The reinforcement scheme of combining surface precipitation measures with curtain grouting measures not only meets the requirements of the ecological environment but also makes the settlement and convergence values lower than the yellow warning deformation values required by the design.
With an increase in the service time of high-speed railway tunnels, various defects caused by construction-quality defects in the secondary lining begin to appear. How to evaluate the safety of such tunnels and take countermeasures is very important for the safe operation of tunnels. Based on the load-structure method and a numerical simulation, this paper studied the short-term and long-term safety of the missing section of anti-crack reinforcement mesh in the plain concrete lining of a high-speed railway mountain tunnel. The short-term safety evaluation considered the influence of negative pressure caused by aerodynamic effects. The long-term safety evaluation considered the combined influence of the surrounding rock and concrete deterioration and the negative pressure and concrete fatigue damage caused by aerodynamic effects. The results showed that under the negative pressure generated by aerodynamic effects, the minimum tensile safety factor of the lining in the defective section increased by 3.8%, while the minimum compressive safety factor of the lining decreased by 7.9%. The negative pressure generated by the aerodynamic effects had little impact on the short-term safety of the lining in the defective section. During the long-term safety evaluation, the overall safety of the defective section decreased significantly, and the minimum tensile and minimum compressive safety factors of the lining decreased by 59.4% and 66.8%, respectively. The calculation results for the initial design do not meet the long-term design requirements and cannot guarantee the long-term safe operation of the tunnel. Finally, two new strengthening methods of galvanized steel mesh-short bolts and galvanized corrugated steel plate-short bolts were proposed to strengthen the defective section of the concrete lining, so as to improve the ultimate bearing capacity and toughness of the plain concrete lining structure.