Newmark analyses of lateral spreading induced by liquefaction were conducted using a database of 22 documented case histories. Site stratigraphy and SPT values for the liquefiable soil were based upon the case-history documentation. The yield acceleration was estimated based on post-liquefaction residual shear strength estimated using three different correlations with SPT blow count. Representative acceleration time histories were selected from time histories recorded in the earthquake. The probabilistic analysis using a truncated normal distribution indicates that the lateral spreading displacement calculated using the Olson and Johnson correlation will be no more than twice the reported displacement with a confidence of 97%.
Coarse-grained red sandstone soil is often used as embankment filling material but is prone to being broken by extrusion, which lowers the stability of the roadbed. This paper aimed to clarify the influence of the variation in coarse-grain content on the mechanical properties of coarse-grained red sandstone soil. Soil with a grain size greater than 5 mm is regarded as coarse-grained soil, and coarse-grained red sandstone soils with different contents of coarse grains were prepared as cylindrical specimens with a diameter of 300 mm and a height of 600 mm. Under three different confining pressures, a large-scale triaxial apparatus was used to carry out triaxial shear tests. The results showed that as the content of coarse grains of red sandstone (denoted as p) increased, the deviation stress of static failure increased, showing a hyperbolic relationship. The internal friction angle also increased hyperbolically, while the cohesion reached a peak value and then decreased, and the maximum value of 133.8 kPa was reached at p = 30%. As the content of coarse grains increased, the maximum dilatancy increased. The maximum amount of shrinkage reached a peak value and then decreased, and the maximum value was reached when p = 30%. A coarse grain content p equal to 30% was the optimum value when coarse-grained red sandstone soil was used as a filling material.
With an increase in the service time of high-speed railway tunnels, various defects caused by construction-quality defects in the secondary lining begin to appear. How to evaluate the safety of such tunnels and take countermeasures is very important for the safe operation of tunnels. Based on the load-structure method and a numerical simulation, this paper studied the short-term and long-term safety of the missing section of anti-crack reinforcement mesh in the plain concrete lining of a high-speed railway mountain tunnel. The short-term safety evaluation considered the influence of negative pressure caused by aerodynamic effects. The long-term safety evaluation considered the combined influence of the surrounding rock and concrete deterioration and the negative pressure and concrete fatigue damage caused by aerodynamic effects. The results showed that under the negative pressure generated by aerodynamic effects, the minimum tensile safety factor of the lining in the defective section increased by 3.8%, while the minimum compressive safety factor of the lining decreased by 7.9%. The negative pressure generated by the aerodynamic effects had little impact on the short-term safety of the lining in the defective section. During the long-term safety evaluation, the overall safety of the defective section decreased significantly, and the minimum tensile and minimum compressive safety factors of the lining decreased by 59.4% and 66.8%, respectively. The calculation results for the initial design do not meet the long-term design requirements and cannot guarantee the long-term safe operation of the tunnel. Finally, two new strengthening methods of galvanized steel mesh-short bolts and galvanized corrugated steel plate-short bolts were proposed to strengthen the defective section of the concrete lining, so as to improve the ultimate bearing capacity and toughness of the plain concrete lining structure.
The use of a geotextile to treat subgrade subsidence after subsidence has occurred is investigated in this paper. To optimize the anchorage length and buried depth of the geotextile and evaluate the influences of the two factors on subgrade subsidence treatment, finite element analysis is performed and validated with existing model tests. The soil pressure, displacement, tensile force and deformation of the geotextile are studied. The results showed that the geotextile prevented an upward development of subsidence and stabilized the upper soil. The increase of the anchorage length of the geotextile transferred greater soil pressure from the subsidence to a stable area, induced a greater tensile force in the geotextile, and resulted in less soil displacement. As the anchorage length of the geotextile increased from 375 mm to 1500 mm, the surface settlement was effectively reduced from 1.05% to 34.18% when comparing to the situation without a geotextile. As the buried depth of the geotextile increased from 2 m to 6 m, the percentage of surface settlement was effectively reduced from 29.14% to 65.91% when comparing with the settlement corresponding to a buried depth of 2 m. It is suggested that the anchorage length of a geotextile should be the length of the subsidence with respect to width and that the buried depth of the geotextile should be 3–4 m for subsidence treatment. This provides insight into the treatment of sinkholes using geosynthetic approaches in karst areas.