Concrete slabs are widely used in modern railways to increase the inherent resilient quality of the tracks, provide safe and smooth rides, and reduce the maintenance frequency. In this paper, the elastic performance of a novel slab trackform for high-speed railways is investigated using three-dimensional finite element modelling in Abaqus. It is then compared to the performance of a ballasted track. First, slab and ballasted track models are developed to replicate the full-scale testing of track sections. Once the models are calibrated with the experimental results, the novel slab model is developed and compared against the calibrated slab track results. The slab and ballasted track models are then extended to create linear dynamic models, considering the track geodynamics, and simulating train passages at various speeds, for which the Ledsgård documented case was used to validate the models. Trains travelling at low and high speeds are analysed to investigate the track deflections and the wave propagation in the soil, considering the issues associated with critical speeds. Various train loading methods are discussed, and the most practical approach is retained and described. Moreover, correlations are made between the geotechnical parameters of modern high-speed rail and conventional standards. It is found that considering the same ground condition, the slab track deflections are considerably smaller than those of the ballasted track at high speeds, while they show similar behaviour at low speeds.
Significant savings in carbon emissions, cost, and time could be achieved via the reduction in maintenance frequency, capital costs of track construction, and land used. Geosynthetic-reinforced soils offer such sustainable solutions. The experimental work presented in this paper investigates the long-term performance of a Geosynthetic-Reinforced Soil Retaining Wall (GRS-RW) system as an alternative to the conventional railway embankment. Full-scale testing was carried out on three sleeper sections of ballasted and slab tracks by simulating train loads cyclically, phased to 360 km/h. The tracks were supported by either a low-level fully confined conventional embankment or a GRS-RW substructure. The substructures were formed of a 1.2 m deep subgrade and frost protection layer, in accordance with high-speed railway design standards. The overall aim was to assess the performance of the tracks, in terms of transient displacements and total settlements. It was observed that once the GRS-RW system reached its active state, it deformed in a very similar way to a conventional embankment despite the fact that the GRS-RW system is less confined than the conventional embankment. The results indicate that the cumulative settlement of the slab track, which is due to the plastic deformation of the soil, is significantly less than that of the ballasted track, which is primarily caused by the movement of the ballast particles.