Jinsheng Jia

Dr. Jinsheng Jia


Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 January 2020 in Frontiers of Earth Science
Verified
Journal Article
Closed access
PDF file
TLTianjie Lei
Tianjie Lei
JFJie Feng
Jie Feng
CZCuiying Zheng
Cuiying Zheng
SLShuguang Li
Shuguang Li
YWYang Wang
Yang Wang
HCHui Cheng
Hui Cheng

1 March 2024 in Journal of Intelligent Construction
Verified
Journal Article
Open access
PDF file
JJJinsheng Jia
Jinsheng Jia
WBWambley Adomako Baah
Wambley Adomako Baah
CZCuiying Zheng
Cuiying Zheng
LDLianying Ding
Lianying Ding
YWYangfeng Wu
Yangfeng Wu
Cemented material dams (CMDs) can fully utilize local sand,gravel and rock materials for dam construction. It has many advantages such as flood overtopping without failure, environmental friendliness, economic savings, rapid construction and so on. It has been rapidly popularised and applied to domestic and foreign projects since was put forward by the first author. This paper illustrates the reasons for the proposal of CMDs, puts forward the stress-strain model of the cemented mixture and the intelligent system of production quality control, presents the model test results for CMD against flood overtopping and introduces the practice of dam construction with low-strength soft rock and weathered materials.

22 June 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YWYangfeng Wu
Yangfeng Wu
JJJinsheng Jia
Jinsheng Jia
CZCuiying Zheng
Cuiying Zheng
BJBaozhen Jia
Baozhen Jia
YWYang Wang
Yang Wang
WBWambley Adomako Baah
Wambley Adomako Baah
Effective seepage control is crucial for maintaining the structural integrity of Cemented Sand, Gravel and Rock (CSGR) dams. Traditional methods using conventional concrete (CVC) or grout-enriched roller-compacted concrete (GERCC) are costly and disruptive. This paper presents a novel technique for constructing the protection and seepage control layer in Cemented Sand, Gravel and Rock (CSGR) dams. The method involves grouting and vibrating the loosened Cemented Sand, Gravel and Rock (CSGR) material to create vibrated grout-enriched Cemented Sand, Gravel and Rock, which performs similarly to concrete. A new surface water stop structure has also been developed for the structural joints. Laboratory tests revealed that Cemented Sand, Gravel and Rock (CSGR) with a vibrating–compacted (VC) value of 2–6 s and a compressive strength of 4 MPa meets design requirements for medium and low dams when the slurry addition rate is 8–12%. The T-shaped surface water stop demonstrated a bonding strength of over 1.8 MPa, withstanding a water pressure of 1.6 MPa. This method, integrated with dam body construction, reduces material costs by about 50% and eliminates construction interference. Specialized equipment for this technique has been developed, with a capacity of 12 m2/h. Implemented in the Minjiang Navigation and Hydropower Qianwei Project and Shaping I Hydropower Station, it has shown significant economic, environmental and safety benefits, promoting sustainable dam construction.

18 June 2025 in Materials
Verified
Journal Article
Open access
PDF file
Mohamed RamadanMohamed Ramadan
Mohamed Ramadan
JJJinsheng Jia
Jinsheng Jia
LZLe Zh
Le Zh
XLXu LI
Xu LI
YWYangfeng Wu
Yangfeng Wu
High concrete gravity dams, particularly Roller-Compacted Concrete (RCC) types, face long-term safety challenges due to weak interlayer formation and crack propagation. This study presented a comprehensive evaluation of safety monitoring indexes for the Guxian high RCC dam (currently under construction) using both numerical and mathematical models. A finite element method (FEM) is employed with a strength reduction approach to assess dam stability considering weak layers. In parallel, a fracture mechanical model is used to investigate the safety of the Guxian dam based on failure assessment diagrams (FADs) for calculating the safety factor and the residual strength curve for calculating critical crack depth for two different crack locations, single-edge and center-through crack, to investigate the high possible risk associated with crack location on the dam safety. Additionally, the Guxian dam’s resistance to hydraulic fracture is assessed under two fracture mechanic failure modes, Mode I (open type) and Mode II (in-plane shear), by computing the ultimate overload coefficient using a proposed novel derived formula. The results show that weak layers reduce the dam’s safety index by approximately 20%, especially in lower sections with extensive interfaces. Single-edge cracks pose greater risk, decreasing the safety factor by 10% and reducing critical crack depth by 40% compared to center cracks. Mode II demonstrates higher resistance to hydraulic fracture due to greater shear strength and fracture energy, whereas Mode I represents the most critical failure scenario. The findings highlight the urgent need to incorporate weak layer behavior and hydraulic fracture mechanisms into dam safety monitoring, and to design regulations for high RCC gravity dams.

6 April 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JJJinsheng Jia
Jinsheng Jia
LDLianying Ding
Lianying Ding
YWYangfeng Wu
Yangfeng Wu
CZChun Zhao
Chun Zhao
LZLe Zh
Le Zh
In order to safely and efficiently use soft rock aggregate cemented dams in red bed regions and promote the development of widely sourced cemented sand and gravel dam materials, the Jinjigou project in China applied soft rock for the first time in the construction of cemented material dams. This article further explores the concept of cemented material dams from conducting on-site direct shear tests and research on soft rock material ratios and explores and invents a new structure and construction method by combining soft rock cemented sand and gravel with cemented rockfill. This article also proposes a digital mixing and intelligent dynamic control method for cemented material dams with soft rock. The research results show that soft rock aggregate content not exceeding 60% can produce soft rock cemented gravel with a compressive strength of no less than 6 MPa. The stress on the dam body is small and does not produce tensile stress. The dam body with added soft rock has certain shear-bearing capacity, with a shear friction coefficient of 0.99~1.10 MPa, cohesion of 0.26~0.53 MPa, and high residual strength, accounting for 60~80% of the peak strength. At the same time, the problems of large fluctuations in moisture content and the uneven grading of the soft rock and riverbed gravel mix during the mixing and production process, and the significant influence on safety caused by the large strength dispersion of the cemented sand and gravel, are resolved, ensuring the quality of soft rock cemented sand and gravel preparation. The successful application of soft rock cemented material dams in Jinjigou has achieved a breakthrough in key technologies for soft rock cemented dam construction in red bed regions, proving the feasibility of soft rock cemented material dam construction and having broad prospects for application and promotion.

16 August 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YWYangfeng Wu
Yangfeng Wu
JJJinsheng Jia
Jinsheng Jia
YWYang Wang
Yang Wang
CZCuiying Zheng
Cuiying Zheng
LZLei Zhao
Lei Zhao
BJBaozhen Jia
Baozhen Jia
Understanding hydraulic fracturing in concrete super-high arch dams is vital for the implementation of safety measures on the bearing surface. In this study, we conducted tests on hydraulic fracturing for the Xiaowan arch dam (294.5 m) to analyze concrete behavior at cracks under various stress conditions. The risk of hydraulic fracturing near the dam heel was identified without compressive stress. Addressing this, we propose a flexible anti-hydrofracturing system using GB sealing material and a spray polyurea coating. Simulation tests on three schemes: ‘3 mm GB plate + 4 mm polyurea’, ‘1 mm GB glue + 5 mm polyurea’, and ‘7 mm polyurea’ showed effective prevention of hydrofracturing at concrete crack openings of 5 mm, 8 mm, or 10 mm under 300 m water pressure. Field tests supported ‘3 mm GB plate + 4 mm polyurea’ and ‘7 mm polyurea’ as optimal solutions for dam sections. Implementation involves a protective block layout with ‘3 mm GB plate + 4 mm polyurea’ on blocks and ‘7 mm polyurea’ in interval zones and corners. Since 2008, maximum leakage, including rock foundation, has remained minimal at 2.78 L/s under regular water levels. These insights aid similar concrete dams in optimizing safety systems.