Aleksandar Doderovic

Mr. Aleksandar Doderovic

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 October 2023 in Minerals
Verified
Journal Article
Open access
PDF file
ADAleksandar Doderovic
Aleksandar Doderovic
SDSvetozar-Milan Doderovic
Svetozar-Milan Doderovic
SSSasa Stepanovic
Sasa Stepanovic
MBMirjana Banković
Mirjana Banković
DSDejan Stevanovic
Dejan Stevanovic
Waste management is an unavoidable technological operation in the process of raw material extraction. The main characteristic of this technological operation is the handling of large quantities of waste material, which can amount to several hundred million cubic metres. At the same time, this operation must comply with all administrative and environmental standards. Therefore, optimising waste rock management (particularly haulage and dumping) has the potential to significantly improve the overall value of the project. This paper presents a hybrid model for the optimisation of waste dump design and site selection. The model is based on different mathematical methods (Monte Carlo simulation, genetic algorithm, analytic hierarchy process and heuristic methods) adapted to different aspects of the problem. The main objective of the model is to provide a solution (in analytical and graphical form) for the draft waste dump design, on the basis of which the final waste dump design can be defined. The functioning of the model is verified using an example of an existing open pit. In the case study, 2250 members of the initial population (different waste dump variants) were generated, and a total of 110 optimised solutions were obtained using 15 optimisations. The solution with the best value of the objective function is adopted, and the final waste dump design is created.

1 January 2016 in Mining and Metallurgy Engineering Bor
Verified
Journal Article
Open access
PDF file
Nikola StanicNikola Stanic
Nikola Stanic
ADAleksandar Doderovic
Aleksandar Doderovic
SSSasa Stepanovic
Sasa Stepanovic
Miljan GomilanovicMiljan Gomilanovic
Miljan Gomilanovic
This work presents a method of determining the dynamics of development the open pit Gacko in the zone roof coal series with the annual capacity 3∙106 t/year of run-of-mine coal using the module cut evaluation of the software package Gemcom Gems. Defining the dynamics was preceded by optimization of the open pit that is done in the software Whittle. By optimization, the optimum boundary of mining (final contour) was obtained which includes 66∙106 t of run-of-mine coal. The contour of the open, obtained in the process of optimization, was used as the final contour of dynamics of the open pit development. Dynamics was developed for the period from 2016 to 2036 (until the end of service life). In the first 5 years, a detailed dynamics was made for the annual period, and after the fifth year, the dynamics was made for a five-year period.

1 January 2016 in Mining and Metallurgy Engineering Bor
Verified
Journal Article
Open access
PDF file
ADAleksandar Doderovic
Aleksandar Doderovic
Nikola StanicNikola Stanic
Nikola Stanic
Miljan GomilanovicMiljan Gomilanovic
Miljan Gomilanovic
Protection of the open pit against water is very important, especially if the open pit is located in the complex conditions regarding protection of the open pit against water. To reduce the investments, it is proposed to define the protection system of the open pit against water for a longer period. In the specific case, the technological system of protection against water was considered at the open pit Gacko with construction the canal system with a The Cumulative water collector. The aim of developing such system is the water directing water the river Musnica riverbed and effective protection of the open pit.

1 January 2023 in Mining and Metallurgy Engineering Bor
Verified
Journal Article
Open access
PDF file
ADAleksandar Doderovic
Aleksandar Doderovic
Nikola StanicNikola Stanic
Nikola Stanic
Miljan GomilanovicMiljan Gomilanovic
Miljan Gomilanovic
SSSasa Stepanovic
Sasa Stepanovic
Functioning of the drainage system has a great importance for the efficient and continuous exploitation at the open pits. Modern exploitation is realized at the open pits with increasing depth and surface, so it is of a crucial importance to accept as much water as possible before it enters the open pit contour. By this way, the loading of a drainage system inside the open pit is greatly reduced, but it also prevents the negative effects of water on the massif. This paper, using the example of the open pit Potrlica, presents how the already existing system, which fully solves all problems in a dynamic environment such as surface mining of lignite, can be improved. Timely improvement of the system can greatly relieve the existing drainage system and improve the exploitation system.

24 July 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
ADAleksandar Doderovic
Aleksandar Doderovic
SDSvetozar-Milan Doderovic
Svetozar-Milan Doderovic
SSSasa Stepanovic
Sasa Stepanovic
MBMirjana Banković
Mirjana Banković
DSDejan Stevanovic
Dejan Stevanovic
Waste management is an unavoidable technological operation in the process of raw material extraction. The main characteristic of this technological operation is the handling of large quantities of waste material, which can amount to several hundred million cubic metres. Working with this amount of material usually requires high-capacity systems for excavation and loading, a large fleet of trucks for haulage, construction, and maintenance of a complex roads network, use of a significant area of land in order to achieve the required capacities, etc. At the same time, this operation must comply with all administrative and environmental standards. Therefore, optimising waste rock management (particularly haulage and dumping) has the potential to significantly improve the overall value of the project. This paper presents a hybrid model for the optimisation of waste dump design and site selection. The model is based on different mathematical methods (genetic algorithm, analytic hierarchy process and heuristic methods) adapted to different aspects of the problem. The main objective of the model is to provide a solution (in analytical and graphical form) for the draft waste dump design, on the basis of which the final waste dump design can be defined.

1 January 2017 in Mining and Metallurgy Engineering Bor
Verified
Journal Article
Closed access
PDF file
Nikola StanicNikola Stanic
Nikola Stanic
SSSasa Stepanovic
Sasa Stepanovic
DGDejan Govedarica
Dejan Govedarica
ADAleksandar Doderovic
Aleksandar Doderovic
This paper describes a software solution for calculation and analyzed the impact resistance to excavation on technical capacity of a bucket wheel excavator was analyzed at the open pit Gacko. The analysis was carried out for many characteristic cases with the values of resistance to excavation of 750, 1000, 1250 and 1500 N/cm, and in accordance with the set values in the working environment of the open pit Gacko - Central Field.