In this paper, a model named fictitious soil pile was introduced to solve the boundary coupled problem at the pile tip. In the model, the soil column betwe
Characterized by long spans, low aspect ratios, and intricate construction sequences, super-large cross-section tunnels present substantial construction risks. Therefore, the selection of the optimal excavation method and construction sequence is crucial for ensuring the safety of tunnel construction and minimizing project costs. This paper takes a super large transverse-section highway tunnel as a case study, employing field monitoring data combined with ABAQUS software to analyze the stress and deformation of surrounding rock and support structures under different excavation methods. The findings reveal that the deformation of surrounding rock and support structures excavated by the Double-Side Drift Method is smaller than those caused by the three-benching seven-step method and the CRD excavation method. Nevertheless, the significant stresses of surrounding rock and support structures are released by the Double-Side Drift Method, leading to potential stress concentrations. Thus, it is necessary to ensure the rapid completion of early support and quick sealing of the tunnel. Furthermore, the sixth process achieves smaller deformation (including arch displacement and surface settlement) of the tunnel, a shorter construction period, and lower economic costs when compared to other construction processes. Consequently, it can obviously be concluded that both the Double-Side Drift Method and the sixth construction process stand out as the most appropriate choices for excavating super large cross-section tunnels. The insights obtained from this study provide theoretical guidance for the design and construction of similar tunnel projects.
The Kerr foundation model simulates the interaction between piles and soil. Considering the impact of lateral soil displacement on adjacent piles, the lateral displacement and bending moment of the adjacent piles caused by shield tunnel excavation are calculated in detail. Additionally, the reactions of groups of piles are obtained by focusing on the shielding effect of the piles on the soil displacement caused by shield tunnel excavation. The validity of the solutions is verified by comparing the calculated results with the boundary element program GEPAN. Additionally, adjacent pile lateral displacement and bending moment are compared, with and without considering lateral soil effects. Furthermore, this study investigates the influence of various factors, such as soil spring stiffness, pile–tunnel distance, ground loss ratio, and pile diameter on the pile group’s lateral displacement and bending moment. The research findings indicate that increasing the soil spring stiffness or the horizontal distance between the pile and tunnel can reduce the lateral displacement and the bending moment of the pile. On the other hand, as the ground loss ratio gradually increases, the pile lateral displacement and bending moment will also increase. However, when the diameter of the pile grows, the lateral displacement reduces, while the bending moment increases.
The bearing capacity of an open caisson under lateral loads is a key factor affecting the normal operation of an open caisson. It will inevitably have a disturbing effect on the surrounding soil layers during the sinking process of the caisson; that is, a disturbance ring will develop around the caisson. Based on the Jurong Yangtze River water supply project, the lateral bearing characteristics of the open caisson are analyzed by the numerical method with due consideration to soil disturbance, and the reinforcement scheme is optimized. The numerical results show that when the thickness of the disturbance ring is less than 0.5 m the disturbance ring has little effect on the lateral bearing capacity of the open caisson. An arc-shaped cement–soil reinforcement at the loading area can effectively improve the lateral bearing performance of the caisson. The optimized reinforcement thickness is 2 times that of the disturbance ring, and the reinforcement angle is approximately 60°.
The combined finite‐discrete element method (FDEM) and laboratory test were selected to study the extent of deformation range and time‐dependent deformation of surrounding rock during tunnel excavation without support in a fault‐crossing tunnel project. FDEM was found to accurately reflect the deformation and failure characteristics of different surrounding rocks during stress release, including conjugate shear and extrusion. Analysis of the results showed that the disturbance range of surrounding rocks could reach 1.5 to 2.5 times the tunnel diameter when crossing the fault zone. The rock surrounding the tunnel was found to incur significant conjugate shear deformation and extrusion deformation: conjugate shear deformation was identified as dominant in the deep rock mass, whereas extrusion deformation prevailed in the rock mass near the cave wall. The conjugate shear distribution was represented as a spiral line of deformation circling around the tunnel section, with an elliptical main deformation zone with its long axis parallel to the fault plane. Compared with the findings when crossing the intact rock mass, the deformation of the surrounding rocks when crossing the fault zone was characterized by rapid development, deep expansion area, and large deformation. The study conclusions were that supporting bolts and steel arches should be implemented timely when excavating fault zones and that both lithology and optimal construction timing were essential considerations in determining the length of the supporting bolts.