Lingxiao Guan

Dr. Lingxiao Guan

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 October 2023 in Buildings
Verified
Journal Article
Open access
PDF file
HJHaipeng Jia
Haipeng Jia
NWNing WANG
Ning WANG
HDHaibin Ding
Haibin Ding
LGLingxiao Guan
Lingxiao Guan
The Kerr foundation model simulates the interaction between piles and soil. Considering the impact of lateral soil displacement on adjacent piles, the lateral displacement and bending moment of the adjacent piles caused by shield tunnel excavation are calculated in detail. Additionally, the reactions of groups of piles are obtained by focusing on the shielding effect of the piles on the soil displacement caused by shield tunnel excavation. The validity of the solutions is verified by comparing the calculated results with the boundary element program GEPAN. Additionally, adjacent pile lateral displacement and bending moment are compared, with and without considering lateral soil effects. Furthermore, this study investigates the influence of various factors, such as soil spring stiffness, pile–tunnel distance, ground loss ratio, and pile diameter on the pile group’s lateral displacement and bending moment. The research findings indicate that increasing the soil spring stiffness or the horizontal distance between the pile and tunnel can reduce the lateral displacement and the bending moment of the pile. On the other hand, as the ground loss ratio gradually increases, the pile lateral displacement and bending moment will also increase. However, when the diameter of the pile grows, the lateral displacement reduces, while the bending moment increases.

4 July 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YLYi Liu
Yi Liu
LHLei Huang
Lei Huang
TLTang xiao Lin
Tang xiao Lin
YXYanbin Xue
Yanbin Xue
WKWenbin Ke
Wenbin Ke
LGLingxiao Guan
Lingxiao Guan
This study established a numerical model for a foundation pit at the Zhongyilu Station of the Wuhan Metro Line 12, using Plaxis3D version 2021 finite element software to examine the horizontal displacement of the diaphragm wall, ground surface settlement, and differential settlement between the diaphragm wall and the lattice columns across various construction stages. A comparison with the cut-and-cover method prompted the adoption of a strategy that integrates segmental pouring of the main structure and the installation of internal supports to optimize the original scheme. The results indicated that as the foundation pit was excavated, both the horizontal displacement of diaphragm wall and the ground surface settlement gradually increased, while the differential settlement between the diaphragm wall and the lattice columns shows exhibited an initial decrease followed by an increase. In comparison to the cut-and-cover method, the cover-and-cut method demonstrated greater efficacy in controlling foundation pit deformation and minimizing disturbances to surrounding environment. As the number of segmental pouring layers and support levels increased, the overall deformation of the foundation pit showed a gradual decreasing trend, and the differential settlement between the diaphragm wall and the lattice columns continued to fluctuate. When each floor slab was poured in three layers with two supports placed in the middle, the maximum horizontal displacement of the diaphragm wall could be reduced by 22.47%, and the maximum ground surface settlement could be decreased by 19.01%. The findings in this research can provide valuable basis and reference for the design and construction of similar projects.

21 December 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XLXinhuan Liang
Xinhuan Liang
LGLingxiao Guan
Lingxiao Guan
YTYuzhe Tang
Yuzhe Tang
MCMing Chen
Ming Chen
JPJunren Peng
Junren Peng
CXChangjie Xu
Changjie Xu
The dewatering of foundation pits leads to changes in the water level and effective stress within the surrounding strata. When existing tunnels are present within the dewatering influence zone, the impact of dewatering on these tunnels cannot be ignored. The Vlasov foundation beam model was used to simulate the interaction between the tunnel and the soil, and the key parameters of the model were precisely investigated. In addition, the constraining effect of the lateral soil on the tunnel was also considered. By integrating the principles of effective stress and Dupuit’s assumption, in this work we calculated the additional load on the tunnel caused by foundation pit dewatering, which was then applied to determine the tunnel stress and deformation induced by dewatering. The accuracy of this approach is validated through comparative analysis with finite element results. Furthermore, the relationships between the permeability coefficient (kt), the spacing (d) between the tunnel and the dewatering well, the water level drop (sw), and tunnel stress and deformation were further studied. The key findings are summarized as follows. Firstly, accounting for lateral soil effects enhances computational accuracy. Secondly, an increase in soil kt leads to a greater tunnel settlement with relatively minor changes in bending moments. Thirdly, as d increases, both tunnel settlements and bending moments decrease. Additionally, as the water level dropped from 10 m to 30 m, the maximum additional stress on the tunnel increased by 94.50%, and the settlement increased by 127.43%. Consequently, it is essential to pay close attention to the tunnel segment nearest to the water level.

2 February 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
WGWei Guo
Wei Guo
CLCong Luo
Cong Luo
ZLZhiyun Liu
Zhiyun Liu
LGLingxiao Guan
Lingxiao Guan
JDJingliang Dong
Jingliang Dong
NGNing Guo
Ning Guo
Blasting-induced vibrations from new tunnel construction pose a significant threat to the structural safety of existing tunnel linings due to dynamic stress concentration. To address this, this study establishes a transient-response analytical model for composite lining tunnels using wave function expansion and a combination of the Duhamel integral and Fourier transform methods. Through a case study of the Hongshan South Road Tunnel, the research systematically quantifies the influence of critical factors such as load rise time, lining thickness, and material stiffness. Numerical results reveal that under blasting P-wave action, the inner vault of the secondary lining exhibits the most significant dynamic stress concentration, identifying it as the primary vulnerable zone. Furthermore, peak dynamic stress and vibration velocity increase sharply as the load rise time decreases, indicating that short-duration, high-intensity impacts present the greatest hazard. To mitigate these effects, the study identifies several optimization strategies: increasing the thickness of the initial support and employing high-modulus materials effectively reduce stress peaks. Specifically, maintaining the elastic modulus ratio of the surrounding rock to the initial support at approximately 2.0 provides an optimal balance for enhancing blast resistance. The findings suggest that tunnel design should prioritize optimizing the stiffness of the initial support and utilizing grouting to reinforce the surrounding rock. This research provides a robust theoretical framework and specific parameter optimization directions for the seismic and blast-resistant design of composite lining tunnels.

3 July 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
RYRong Yao
Rong Yao
ZLZhiyun Liu
Zhiyun Liu
HDHaibin Ding
Haibin Ding
YSYang Sun
Yang Sun
LGLingxiao Guan
Lingxiao Guan
ZHZhipan Han
Zhipan Han
Grounded in the principles of wave dynamics, this study employs the wave function expansion approach to mathematically describe how plane P- and SV-waves scatter around a composite tunnel lining embedded in an unbounded medium. To establish the transient analytical framework for the dual-layer structure subjected to blast excitations, we integrate Fourier integral transforms alongside the Heaviside step and Dirac delta functions. We systematically analyze how the tunnel’s transient dynamic stress concentration factor (DSCF) responds to variations in the shear modulus ratio, as well as the specific characteristics of the incoming waves (i.e., wave type and dimensionless pulse duration). Furthermore, a seismic mitigation strategy featuring a “soft-exterior, rigid-interior” configuration is theoretically explored. The analytical outcomes theoretically indicate that short-duration transient waves provoke severe dynamic stress concentrations within the lining, with SV-waves posing a markedly greater threat to structural integrity than P-waves. Analyses reveal that the peak dynamic stress concentration (DSCFmax) primarily localizes at the tunnel’s crown and invert. Interestingly, altering the pulse duration does not significantly shift this spatial distribution pattern. Ultimately, analytical results suggest that adopting the “soft-exterior, rigid-interior” design and optimizing the thickness of the primary support can substantially alleviate these stress concentrations, providing preliminary theoretical guidance for vibration attenuation.