This research article concentrates on process conditions in addition to improving color selections in polymer compounders and developing more accurate simulation models. The feed rate (FR), temperature (T) and screw speed (SS) are three processing variables that the research investigates using general trends (GTs) and Box–Behnken design (BBD) response surface methodology. The identical set of processing settings was tweaked at three separate phases independently of one another. This study uses the experimental design to investigate process parameters’ optimization while holding all other parameters constant. This design was given the name GT. To develop this design and its statistical optimization, this study used the software of the design expert method. A regression model was run in this design, which displayed collective as well as individual effects of the parameters on color images. The values of tri-stimulus color with the best optimization had the smallest proper color variance (dE*). To obtain information on pigment characteristics, an SEM image analysis was conducted, which aids in improving future designs and overcoming manufacturing issues that affect color fluctuation properties and waste reduction for various chemical grades, both of which enhance environmentally friendly processes.
The construction sector is considered the most important sector, as it contributes to raising the country’s economy. Therefore, it is necessary to search for the obstacles. One of these obstacles is the delay, as the project is rarely completed within the planned period. Among the most prominent reasons for this delay are change orders, financial problems for the owner, and slow decision-making on the part of stakeholders. This delay led to various risks, like financial risks, which were represented in exceeding the cost of the project as well as the other in operating the facility and benefiting from the planned benefit. The risk identification process starts with Existence of uncertainty, Preliminary checklist, Risk events consequence scenarios, Logical categorization scheme, Risk mapping, and finally is risk category summary. Therefore, these risks should be analyzed during the planning stage, which can reduce risks during the implementation of the project must be developed. Also, money must be involved in the planning process to be able to fully understand the owner’s perception of the project. The provision of the required budget for the project in the early stages ensures the availability of financial liquidity and thus does not delay payment to the contractor.