Adrian Belowski

Mr. Adrian Belowski

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 January 2024 in Energies
Verified
Journal Article
Open access
PDF file
Paweł PijarskiPaweł Pijarski
Paweł Pijarski
ABAdrian Belowski
Adrian Belowski
The challenges currently faced by network operators are difficult and complex. Presently, various types of energy sources with random generation, energy storage units operating in charging or discharging mode and consumers with different operating characteristics are connected to the power grid. The network is being expanded and modernised. This contributes to the occurrence of various types of network operating states in practice. The appearance of a significant number of objects with random generation in the power system complicates the process of planning and controlling the operation of the power system. It is therefore necessary to constantly search for new methods and algorithms that allow operators to adapt to the changing operating conditions of the power grid. There are many different types of method in the literature, with varying effectiveness, that have been or are used in practice. So far, however, no one ideal, universal method or methodology has been invented that would enable (with equal effectiveness) all problems faced by the power system to be solved. This article presents an overview and a short description of research works available in the literature in which the authors have used modern methods to solve various problems in the field of power engineering. The article is an introduction to the special issue entitled Advances in the Application of Methods Based on Artificial Intelligence and Optimisation in Power Engineering. It is an overview of various current problems and the various methods used to solve them, which are used to cope with difficult situations. The authors also pointed out potential research gaps that can be treated as areas for further research.

17 June 2024 in Energies
Verified
Journal Article
Open access
PDF file
Paweł PijarskiPaweł Pijarski
Paweł Pijarski
CSCandra Saigustia
Candra Saigustia
Piotr KacejkoPiotr Kacejko
Piotr Kacejko
ABAdrian Belowski
Adrian Belowski
Piotr MillerPiotr Miller
Piotr Miller
The increasing number of renewable energy sources in power systems contributes to overloads of power lines in emergency situations. Lines made with relatively small cross-section cables, which in the past were designed for an operating temperature of 40 °C, are particularly exposed to overloads. Currently, they constitute the so-called “bottlenecks” in network capacity. This is manifested in the fact that when carrying out expert opinions aimed at examining the impact of a source on the network, computational analyses show overloads of its elements. This article proposes a methodology for eliminating these overloads. It involves the use of two methods at the same time, namely optimal network reconfiguration combined with minimisation of the total power curtailment in RE sources. The search for the optimal network configuration will also allow for minimising power curtailment in renewable energy sources, and thus reduce the costs of this type of operation. With such a tool, network operators will be able to achieve the effect of relieving the line load with the lowest possible cost of redistribution. Based on the IEEE 118 bus test network, calculations were performed that confirmed the effectiveness of the proposed approach. The operation of the proposed methodology is presented with the example of two selected network failure states. The novelty of the proposed solution lies in the simultaneous use of two methods of eliminating line overloads. This streamlines the entire process and improves its effectiveness.

21 November 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Paweł PijarskiPaweł Pijarski
Paweł Pijarski
Damir JakusDamir Jakus
Damir Jakus
ABAdrian Belowski
Adrian Belowski
PSPetar Sarajcev
Petar Sarajcev
Dominik PrzepiórkaDominik Przepiórka
Dominik Przepiórka
The power system is constantly changing. New elements are being added. The network structure is being changed. Existing network infrastructure is being modernised. This results in the need to perform various types of computational analyses. These analyses are designed to assess the impact of new and existing power system components on its operation. These analyses can be complicated, complex and difficult. These analyses are influenced by the size of the actual grid, technical conditions, and the specific requirements of grid operators. Therefore, there is a constant search for methods that simplify them without significantly compromising the accuracy of the obtained results. In real networks, computation time is also a crucial parameter, which can be excessive when analysing multiple operating variants. Linearisation of the computational model significantly contributes to reducing computational time but also affects their accuracy. Particular attention should be paid to two frequently used and compared linearization methods: the DC method and the first-order Taylor expansion. The DC (Direct Current) method offers relatively simple formulas. These relationships are based on simplifying assumptions. They are well suited for error analysis, at the expense of neglecting reactive power and voltage changes. Taylor linearization preserves the full AC structure around a selected operating point. It takes reactive power and voltage changes into account. Its accuracy is local and depends on the base point. It may require re-linearization for large changes in the power system operating states. This article presents a detailed literature review. It concerns the linearization of the power flow problem in the context of solving various computational problems in the power system. Selected works are grouped and categorised by topic. Linearisation methods used in the literature are presented, and the most frequently used ones are also indicated. Research gaps that may be addressed in future work are highlighted.

22 May 2024 in Archives of Electrical Engineering
Verified
Journal Article
Open access
PDF file
Paweł PijarskiPaweł Pijarski
Paweł Pijarski
CSCandra Saigustia
Candra Saigustia
Piotr KacejkoPiotr Kacejko
Piotr Kacejko
ĽBĽubomír Beňa
Ľubomír Beňa
ABAdrian Belowski
Adrian Belowski
Studying the impact of renewable energy sources planned to be connected to the grid, requires the preparation of expert opinions. The task of this opinion is to verify that there are possibilities enabling the connection of the considered source to the network. Each opinion is required to take into account other facilities and those sources which were previously connected to the grid or connection agreement were signed with them. The need to take into account such a large number of sources contributes to potential thermal overloads of high-voltage lines. Sometimes these overloads are insignificant, but in certain situations it turns out that their occurrence may be a reason for refusing to sign connection agreements for new sources. According to network operators, their presence may constitute a threat to the operational security of the grid. The article presents the use of the method of tracking active power flows and the DC method of determining power flows to estimate the impact of these sources on thermal overloading of lines. Using of the IEEE-118 test network, selected nodes were analysed where connecting sources might significantly worsen overloads previously observed or would cause new overloads. The proposed approach will enable potential investors to make proper decisions regarding selection of source connection points. Combining the results obtained by both methods at the same time will allow for the indication of appropriate connection nodes for sources from the point of view of minimising the number of overloaded lines and prospective costs of their uprating.

18 July 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Paweł PijarskiPaweł Pijarski
Paweł Pijarski
ABAdrian Belowski
Adrian Belowski
The dynamic development of distributed sources (mainly RES) contributes to the emergence of, among others, balance and overload problems. For this reason, many RES do not receive conditions for connection to the power grid in Poland. Operators sometimes extend permits based on the possibility of periodic power reduction in RES in the event of the problems mentioned above. Before making a decision, investors, for economic reasons, need information on the probability of annual power reduction in their potential installation. Analyses that allow one to determine such a probability require knowledge of the reliability indicators of transmission lines and transformers, as well as failure removal times. The article analyses the available literature on the annual risk of outages of these elements and methods to determine the appropriate reliability indicators. Example calculations were performed for two networks (test and real). The values of indicators and times that can be used in practice were indicated. The unique contribution of this article lies not only in the comprehensive comparison of current, relevant transmission line and transformer reliability analysis methods but also in developing the first reliability indices for the Polish power system in more than 30 years. It is based on the relationships presented in the article and their comparison with results reported in the international literature.

11 June 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Paweł PijarskiPaweł Pijarski
Paweł Pijarski
ABAdrian Belowski
Adrian Belowski
ĽBĽubomír Beňa
Ľubomír Beňa
TBTomasz Binkowski
Tomasz Binkowski
BMBartlomiej Mroczek
Bartlomiej Mroczek
The increasing integration of renewable energy sources (RESs) reduces dependence on conventional generators, thereby minimizing the negative environmental impact of fossil fuels. The distributed location of RESs also affects the voltage profiles (voltage values in network nodes) and reduces power losses. The growing number of RESs connected to the network increases the total installed power in the sources in the power system. This contributes to the periodic excess of generated power. It creates the need to limit generation in conventional power plants and to switch off some RESs. This article proposes an original methodology for optimally managing overloads of high-voltage power lines. The combination of the power flow tracking method and metaheuristic optimization allows for the effective elimination of line overloads. The aim of the calculations is to find the optimal power distribution in the selected sources, which provide minimal power limitation. As a result, this means a minimal reduction in the total generation in RESs. In this way, the effect of eliminating line overloads is achieved at the lowest possible cost of power redispatching. On the basis of the IEEE 118 bus test network, computational cases are considered, which are examples of emergency states.