Nan Chen

Dr. Nan Chen

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 August 2024 in Applied Energy
Verified
Journal Article
Closed access
XGXianhui Gao
Xianhui Gao
SWSheng Wang
Sheng Wang
YSYing Sun
Ying Sun
JZJunyi Zhai
Junyi Zhai
NCNan Chen
Nan Chen
XZXiao-Ping Zhang
Xiao-Ping Zhang

27 December 2022 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
NCNan Chen
Nan Chen
YYYuefeng Yang
Yuefeng Yang
LLLanfang Li
Lanfang Li
CCChunyan Cui
Chunyan Cui
YXYing Xue
Ying Xue
Xiao-Ping ZhangXiao-Ping Zhang
Xiao-Ping Zhang
Commutation failure (CF) occurs frequently under inverter AC system faults. Around 70% of power system faults are Single-Line-to-Ground (SLG) faults that affect not only magnitudes but also phase angles of non-faulty phases. This has not been thoroughly analyzed in existing research. Therefore, this paper proposes a new commutation voltage calculation method where the commutation voltages under asymmetrical faults in Multi-Infeed LCC-HVDC systems are derived. The proposed method considers the impact of transformer connections, fault location, fault impedance, and voltage magnitude change and voltage phase shift of faulty and non-faulty phases that have not been considered in previous publications. Secondly, based on this proposed commutation voltage calculation method, CF prediction criteria based on the Voltage-Time Area (VTA) theory are proposed. Thirdly, a calculation method of the extra commutation voltage needed for each inverter to avoid CF is proposed to measure how close the commutations are to being successful under SLG faults. The effectiveness of the proposed methods is demonstrated by simulation results using the CIGRE LCC-HVDC Benchmark system and a six-machine-two-area (6M2A) test system simulated by the Real Time Digital Simulator (RTDS).

29 August 2023 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
ZLZhixuan Li
Zhixuan Li
YXYing Xue
Ying Xue
YTYuan Tang
Yuan Tang
NCNan Chen
Nan Chen
CYConghuan Yang
Conghuan Yang
Line-Commutated Converter (LCC) based High-Voltage Direct Current (HVDC) systems are susceptible to commutation failure (CF) during fault recovery not only for faults at inverter, but also for faults at rectifier side. Although the mechanism of CF under each scenario (fault at inverter and fault at rectifier) have been widely discussed, no existing methods can mitigate CFs under both scenarios. This is because the lack of detailed comparative analysis for the root cause of CFs under both scenarios. In this study, it is shown that the essence of CF during fault recovery for faults at both ends are in fact the same – long duration of CC control at both end converters and inability of CEA control to maintain commutation margin after control mode switching during fault recovery. As a result, the inverter cannot maintain a stable operating point during fault recovery. Based on this, an adaptive advancement (beta) angle (ABA) control is proposed that can mitigate CFs during fault recovery for faults at both ends. The proposed control features a direct control of inverter advancement angle that ensures a sufficient commutation margin during recovery. At the same time, the negative impacts of the increase of reactive power consumption are minimized by avoiding the ‘over advancement’ of inverter firing angle. From the V-I trajectory point of view, the trajectory of the system is constrained at the stable operating point during recovery process. PSCAD simulation demonstrates the effectiveness of the proposed method.

8 April 2025 in IEEE Access
Verified
Journal Article
Open access
SAShami Ahmad Assery
Shami Ahmad Assery
NCNan Chen
Nan Chen
Xiao-Ping ZhangXiao-Ping Zhang
Xiao-Ping Zhang
The high penetration of renewable energy leads to reduced system inertia, which has caused considerable concerns over the stability of frequency and oscillations in power systems. This paper investigates the use of a hybrid system consisting of a Battery Energy Storage System (BESS) and a Synchronous Condenser (SC) to enhance the frequency response of power systems with low inertia. This paper firstly proposes a sizing strategy based on techno-economic analysis using the Genetic Algorithm (GA) optimization technique, which can minimize the cost of the BESS-SC hybrid system while maintaining the Rate of Change of Frequency (RoCoF) within an acceptable limit. Then this paper proposes a locating strategy for identifying the most suitable location for the BESS-SC hybrid system, which utilizes the Short Circuit Ratio (SCR) to identify the location and is further verified by the Prony method employing eigenvalues and damping ratio analysis. The proposed sizing and locating strategies for the BESS-SC hybrid system are demonstrated on the modified Kundur 4-Machine 2-Area system using MATLAB/Simulink. The effectiveness and feasibility of the proposed sizing and locating approaches are verified in three case studies, showing notable enhancements in the RoCoF and frequency nadir using the proposed sizing and locating strategies for the BESS-SC hybrid system.

13 November 2024 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
ZLZhixuan Li
Zhixuan Li
YXYing Xue
Ying Xue
YCYiping Chen
Yiping Chen
NCNan Chen
Nan Chen
CYConghuan Yang
Conghuan Yang
JHJiyu Huang
Jiyu Huang
Modern power systems require significant grid flexibility. As the AC transmission lines are passive and cannot be controlled, grid flexibility in the transmission system can only be provided by actively controlling High-Voltage Direct Current (HVDC) systems, particularly the dominant LCC-HVDC systems. Although grid-flexibility support using LCC-HVDC has been studied, existing methods fail to achieve bidirectional frequency support while maintaining AC voltage. Therefore, a coordinated control method is proposed for the LCC-HVDC system to achieve bilateral frequency support (BFS) and AC voltage regulation (AVR) for asynchronously interconnected systems. The level of frequency support and the coupled dynamics of sending-end (SE) and receiving-end (RE) system frequencies are quantified by the developed low-order frequency response model, different from frequency models in previous research for only one end of the system. With the developed model, the control parameters of the proposed method are analytically calculated. This ensures an appropriate level of primary frequency support without jeopardizing the frequency response of the system at the remote end. The effectiveness of the proposed method is demonstrated through real-time simulation.

26 December 2023 in Inventions
Verified
Journal Article
Open access
PDF file
SAShami Assery
Shami Assery
Xiao-Ping ZhangXiao-Ping Zhang
Xiao-Ping Zhang
NCNan Chen
Nan Chen
With the high penetration of renewable energy into power grids, frequency stability and oscillation have become big concerns due to the reduced system inertia. The application of the Battery Energy Storage System (BESS) is considered one of the options to deal with frequency stability and oscillation. This paper presents a strategy to size, locate, and operate the BESS within the power grid and, therefore, investigate how sizing capacity is related to renewable energy penetration levels. This paper proposes an identification method to determine the best location of the BESS using the Prony method based on system oscillation analysis, which is easy to implement based on measurements while actual physical system models are not required. The proposed methods for BESS size and location are applied using MATLAB/Simulink simulation software (version: R2023a) on the Kundur 2-area 11-bus test system with different renewable energy penetration levels, and the effectiveness of the applied method in enhancing frequency stability is illustrated in the study cases. The case studies showed a significant improvement in steady-state frequency deviation, frequency nadir, and Rate of Change of Frequency (ROCOF) after implementing BESS at the selected bus. The integration of BESS can help to avoid Under-frequency Load Shedding (UFLS) by proper selections of size, location, and operating strategy of the BESS within the power grid.