Hatim Fahad

Mr. Hatim Fahad


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 March 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
MAMohammed I Aldokhi
Mohammed I Aldokhi
NANaif M. Alsanabani
Naif M. Alsanabani
HFHatim Fahad
Hatim Fahad
AMAbdulrahman A. Bin Mahmoud
Abdulrahman A. Bin Mahmoud
The precast concrete production process faces uncertainties and risks that reduce the efficiency of the Saudi precast concrete industry. Assessing the risk factors’ interdependence yields better results than considering individual analyses only. The previous precast risk studies did not consider the interdependencies among risk factors concerning different process stages. This paper aims to identify precast risk factors and prioritize their importance in Saudi Arabia. Using a dynamic Bayesian network, the assessment considers the interrelationships among the risk factors and different production stages. The risk factors were collected from previous studies, evaluated, and classified into the five construction stages by performing structured interviews with ten experts. The probabilities of the root risks and conditional probabilities of intermediate and leaf risks were assessed based on the ten experts. Then, a Monte Carlo simulation was utilized to provide the status of these probabilities, which were considered input data for the GeNIe program. The main results revealed that erection productivity is the highest risk, with a probability value of 0.87. In addition, the design schedule’s significance directly impacts production capacity, resulting in a probability value of 0.74. However, the site management risk is low, with a 0.32 probability value. This paper assists practitioners in optimizing construction schedules.

7 September 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Khalid Saad A. Al-GahtaniKhalid Saad A. Al-Gahtani
Khalid Saad A. Al-Gahtani
NANaif M. Alsanabani
Naif M. Alsanabani
AAAbdullah M. Alsugair
Abdullah M. Alsugair
SASaad Aljadhai
Saad Aljadhai
HFHatim Fahad
Hatim Fahad
This paper investigates the Building Information Modeling (BIM) adoption impact on the factors of Contract Cost Variance (CCV) over time. The study considers qualitative and quantitative data to identify the most common causes of CCV through pre-tendering. A partial least square-structure model (PLS-SEM) procedure was used to develop a causal model and rank CCV factors based on their effect, partially based on prior survey raw data conducted in 2022 and the data from 94 projects. Construction industry experts assessed the prior five-year rate of BIM adoption on construction projects to infer the expected trend in BIM adoption in the future (until 2037). Based on the causal model of CCV factors and the future rates of BIM adoption, the dynamic impact of BIM on CCV factors over time was modeled and analyzed. The analysis shows that BIM reduces CCV over time by improving Estimator Performance (EP), Information Quality (IQ), and contractual procedure (CP). The results showed that the CP, EP, and EF have directly impacted CCV, and the PC and IQ indirectly affect the CCV. This paper considers the temporal aspect, examining how the impact of BIM on CCV factors evolves. This dynamic analysis is crucial for long-term strategic planning in construction management.