Suspension bridges are the most common type of bridge used to cross the ocean. The cable clamps in suspension bridges clamp the main cables by bolt preload, but the elastic interaction of the bolts reduces the preload, which is detrimental to the force in suspension bridges. However, research on the factors influencing the elastic interaction of cable clamp bolts in suspension bridges is currently limited. This paper aims to explore the law of influence of external factors on the elastic interaction of bolts through a combined approach of theoretical analysis, full-scale experiment, and finite element simulation. The results indicate that the average preload loss was reduced by about 27% when the elastic modulus was increased by about 110%. The average preload loss was reduced by about 45% when the bolt center distance was increased by 75%. The number of bolts has a small effect on the elastic interaction, which can be ignored. When the preload of bolt installation was increased by 133%, the average preload loss was reduced by approximately 125%, which was almost a linear relationship. Tightening the bolt from the center bolt creates greater elastic interaction. The conclusions can provide suggestions for reducing the elastic interaction of bolts in the design and construction of suspension bridge cable clamps.
The pull-out method is a simple and effective method for detecting the preload of suspension bridge cable clamp bolts. However, research on the pull-out method is currently limited. The force principles governing the bolt during the pulling process are unclear, and the relationship between tension force and the desired preload remains uncertain. This paper aims to explore the force principles of bolts during the pull-out method detection process through a combined approach of theoretical analysis, full-scale test, and finite element simulation. The results indicate that the bolt preload increases during the pulling process. The preload detected by the pull-out method is not the initial preload of the bolt, but rather it exceeds the initial preload. The force relationships among various components are determined as follows: the preload subtracts the change value of the force exerted by the nut at the tension end, which equals the change value of tension force. Additionally, an analysis of the impact of the length of the bolt clamping section and the bolt area on the preload was conducted. Under the same bolt area, a shorter clamping section length corresponds to a greater increase in preload. With the same clamping section length, the increment of preload increases with the bolt area. These findings can serve as references for detecting and specifying the preload of the bolts.