Krisanthi Seneviratne

Dr. Krisanthi Seneviratne

orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 December 2010 in International Journal of Strategic Property Management
Verified
Journal Article
Open access
KSKrisanthi Seneviratne
Krisanthi Seneviratne
DBDavid Baldry
David Baldry
CPChaminda Pathirage
Chaminda Pathirage
The number of reported natural disasters has increased steadily over the past century and risen very sharply during the past decade. These bring about the loss of lives, property, employment and damage to the physical infrastructure and the environment. Disaster management efforts aim to reduce or avoid the potential losses from hazards, assure prompt and appropriate assistance to victims of disaster, and achieve rapid and effective recovery. While knowledge management can enhance the process of disaster management, there is a perceived gap in information coordination and sharing within the context of disaster management. Identifying key success factors will be an enabler to manage the disasters successfully. In this context, this study aims to identify and map key knowledge success factors for managing disasters successfully through capturing the good practices and lessons learned. The objective of this paper is to present the literature findings on factors which support successful disaster management. Accordingly the identified factors were classified into eight main categories as technological, social, legal, environmental, economic, functional, institutional and political. Santruka Pastaraji amžiu pranešimu apie stichines nelaimes nuolat daugejo, o pastaraji dešimtmeti ypač. Per nelaimes žūsta žmones, prarandama nuosavybe ir darbo vietos, suniokojama fizine infrastruktūra ir aplinka. Valdant nelaimes siekiama sumažinti arba išvengti potencialiu nuostoliu del pavoju, užtikrinti greita ir tinkama pagalba nelaimes aukoms, viska greitai bei efektyviai atkurti. Nors žiniu vadyba nelaimiu valdymo procesui gali padeti, nelaimiu valdymo kontekste pastebima spraga tarp informacijos koordinavimo ir dalijimosi ja. Nustačius pagrindinius sekmes veiksnius, tai leis sekmingai valdyti nelaimes. Šiame kontekste tyrimu siekiama nustatyti ir surūšiuoti pagrindinius žiniu sekmes veiksnius, leidžiančius sekmingai valdyti nelaimes, užfiksuojant geraja patirti ir išmoktas pamokas. Šio darbo tikslas – pateikti literatūros išvadas apie veiksnius, kurie prisideda prie sekmingo nelaimiu valdymo. Nustatyti veiksniai atitinkamai suklasifikuoti i aštuonias pagrindines kategorijas: technologiniai, socialiniai, teisiniai, aplinkos, ekonominiai, funkciniai, instituciniai ir politiniai.

28 September 2012 in International Journal of Disaster Resilience in the Built Environment
Verified
Journal Article
Closed access
CPChaminda Pathirage
Chaminda Pathirage
KSKrisanthi Seneviratne
Krisanthi Seneviratne
Dilanthi AmaratungaDilanthi Amaratunga
Dilanthi Amaratunga
RHRichard Haigh
Richard Haigh
Purpose: Knowledge management can play a vital role through ensuring the availability and accessibility of accurate and reliable disaster risk information when required and through effective lesson learning. Identification of key disaster knowledge factors will be an enabler to manage disasters successfully. The purpose of this paper is to present key knowledge factors relating to disaster management cycle, and explore a few challenges relating to identified disaster knowledge factors.Design/methodology/approach: A list of disaster knowledge factors was first identified through a comprehensive literature review and later semi‐structured interviews were conducted among few disaster management practitioners to explore the influence and challenges relating to identified knowledge factors.Findings: Technological, operational/managerial, economic, social, legal and environmental factors seem to have direct influence over the disaster management cycle, while the influence of institutional and political factors seemed indirect and it is through other factors identified. Among key challenges, the lack of detection and warning systems, the need for effective education, training and awareness raising programmes, the need for regular updating of disaster related laws, lack of funds for economic planning measures, poor planning, poor communication, poor leadership, and poor institutional arrangement were highlighted.Originality/value: Owing to paucity of literature and inadequate empirical research done, this paper provides the basis for more empirical research on disaster knowledge factors and sharing of lessons learned. In order to enhance the management of disasters in future, challenges identified need to be addressed.

5 June 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
KSKrisanthi Seneviratne
Krisanthi Seneviratne
MNMalka Nadeeshani
Malka Nadeeshani
Sepani SenaratneSepani Senaratne
Sepani Senaratne
Srinath PereraSrinath Perera
Srinath Perera
Studies on social media (SM) and disaster management (DM) have mainly focused on the adaptation, application, and use of SM in each stage of DM. With the widespread availability and use of SM, the effective utilisation of SM in DM is impeded by various challenges but not yet comprehensively researched. Therefore, this paper aims to identify the challenges as well as the strategies to overcome the challenges and categorises them into a classified model. This study adopts a systematic literature review to present and analyse the challenges and strategies for using SM in DM. Utilising prominent databases, 72 publications were carefully selected and analysed qualitatively using content analysis. The findings revealed four key challenges to its users: the spread of misinformation; insufficient human resources to manage SM use; the lack of trust in information and authorities; and the poor information quality and content of messages. This study identified several strategies to overcome challenges, which can be classified into three sectors of the SM community: individuals, organisations, and SM companies. These findings contribute to enhancing the effective utilisation of SM in DM by community practitioners. Furthermore, this study provides insight into the current status of knowledge and identifies the research gaps around SM in DM for future research.

24 September 2018 in International Journal of Construction Management
Verified
Journal Article
Closed access
KSKrisanthi Seneviratne
Krisanthi Seneviratne
GMGladstan Vimal Michael
Gladstan Vimal Michael
The time bar clause facilitates informing the Engineer (Contract Administrator) in a timely manner of the occurrence of events that may result in delayed completion and/or incur additional costs. Such notices allow parties to mitigate any potential impacts in terms of time and/or cost. Nevertheless, the time bar clause forfeits a contractor’s claim, if the notice of claim is not submitted within the stipulated time in the contract, giving rise to numerous disputes. The purpose of this study is to identify the disputes surrounding the time bar clause in the FIDIC 1999 Red Book, which is an internationally used Standard Form of Contract (SFoC) for building and engineering works designed by the employer. After identifying the sources of disputes and modifications to the standard provisions via a comprehensive literature review, the researchers conducted an online questionnaire survey with 61 construction contract professionals (employers, contract consultants and contractors) and semi-structured interviews with four contract specialists to determine the level of agreement with the identified sources of disputes and modifications to standard provisions. Sources of disputes and modifications were ranked based on the Relative Agreement Index (RAI) from the survey. Interviews were qualitatively analyzed to identify agreement/disagreement and the reasons for the agreement/disagreement.

13 October 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
MMMahir Msawil
Mahir Msawil
Faris ElgaishFaris Elgaish
Faris Elgaish
KSKrisanthi Seneviratne
Krisanthi Seneviratne
SMStephen McIlwaine
Stephen McIlwaine
Forecasting the cash flow for infrastructure projects has not received much attention in the existing models. Moreover, disregarding the cost flow behaviour and proposing models that entail a relatively high dimensionality of inputs have been the main drawbacks of the existing models. This study proposes a heuristic cash flow forecasting (CFF) model for infrastructure projects, and it explores the underlying behaviour of the cost flow. The proposed model was validated by adopting a case study approach,the actual cost flow datasets were mined from a verified data system. The results invalidated the employment of a dominant heuristic rule with regard to a cost-flow-time relationship in infrastructure projects. On the other hand, a mathematical parameter-based comparison between the trends analysed from previous studies revealed that the cost flows of infrastructure projects procured through a design-bid-build (D-B-B) route behaved in a similar manner to building projects procured through a construction management route. This research contributes to the body of knowledge providing a method to enable infrastructure contractors to accurately forecast the required working capital through adding a new dimension for project classification by coining the term “the quaternary flow percentage”. In addition, this study indicates the importance of identifying the impact of root risks on the individual cost flow components rather than on the aggregated cost flow, which is a recommendation for future research.

20 March 2017 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
KSKrisanthi Seneviratne
Krisanthi Seneviratne
Dilanthi AmaratungaDilanthi Amaratunga
Dilanthi Amaratunga
RHRichard Haigh
Richard Haigh
Purpose: Post conflict housing reconstruction is crucial to development and peacekeeping. However, the success of it, is hindered by a number of problems related to a lack of addressing housing needs. The purpose of this paper is to explore how such housing needs can be effectively managed in post conflict housing reconstruction in Sri Lanka. Design/methodology/approach: Using the grounded theory method as the research strategy, unstructured interviews were conducted with policy makers, practitioners, beneficiaries and academics in Sri Lanka. Data were analysed using open, axial and selective coding to develop the theoretical framework. Findings: The study reveals the challenges, contributing factors and strategies in addressing housing needs of accessibility, habitability, affordability, location, facilities, cultural considerations and security of land tenure. It also identifies the gaps and recommendations. The paper establishes the links between these and presents a theoretical framework for managing housing needs effectively in post conflict housing reconstruction in Sri Lanka. Practical implications: This research enhances the success of post conflict housing reconstruction through addressing housing needs effectively, which contributes to sustainable housing development after conflicts. Originality/value: The study combines the literature from five main areas: conflicts, post conflict, post conflict reconstruction, post conflict housing reconstruction and housing needs and provides a better understanding on how the housing needs can be managed during post conflict housing reconstruction in developing countries based on empirical evidence.