Javier Ortego

Mr. Javier Ortego


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 March 2015 in Sensors
Verified
Journal Article
Open access
PDF file
FÁFernando Álvarez
Fernando Álvarez
FGFernando Garnacho
Fernando Garnacho
JOJavier Ortego
Javier Ortego
MSMiguel Ángel Sánchez-Urán
Miguel Ángel Sánchez-Urán
Partial discharge (PD) measurements provide valuable information for assessing the condition of high voltage (HV) insulation systems, contributing to their quality assurance. Different PD measuring techniques have been developed in the last years specially designed to perform on-line measurements. Non-conventional PD methods operating in high frequency bands are usually used when this type of tests are carried out. In PD measurements the signal acquisition, the subsequent signal processing and the capability to obtain an accurate diagnosis are conditioned by the selection of a suitable detection technique and by the implementation of effective signal processing tools. This paper proposes an optimized electromagnetic detection method based on the combined use of wideband PD sensors for measurements performed in the HF and UHF frequency ranges, together with the implementation of powerful processing tools. The effectiveness of the measuring techniques proposed is demonstrated through an example, where several PD sources are measured simultaneously in a HV installation consisting of a cable system connected by a plug-in terminal to a gas insulated substation (GIS) compartment.

16 August 2024 in Sensors
Verified
Journal Article
Open access
PDF file
JOJavier Ortego
Javier Ortego
FGFernando Garnacho
Fernando Garnacho
FÁFernando Álvarez
Fernando Álvarez
EÁEduardo Arcones del Álamo
Eduardo Arcones del Álamo
AKAbderrahim Khamlichi
Abderrahim Khamlichi
In general, a high voltage (HV) substation can be made up of multiple insulation subsystems: an air insulation subsystem (AIS), gas insulation subsystem (GIS), liquid insulation subsystem (power transformers), and solid insulation subsystem (power cables), all of them with their grounding structures interconnected and linked to the substation earth. Partial discharge (PD) pulses, which are generated in a HV apparatus belonging to a subsystem, travel through the grounding structures of the others. PD analyzers using high-frequency current transformer (HFCT) sensors, which are installed at the connections between the grounding structures, are sensitive to these traveling pulses. In a substation made up of an AIS, several non-critical PD sources can be detected, such as possible corona, air surface, or floating discharges. To perform the correct diagnosis, non-critical PD sources must be separated from critical PD sources related to insulation defects, such as a cavity in a solid dielectric material, mobile particles in SF6, or surface discharges in oil. Powerful diagnostic tools using PD clustering and phase-resolved PD (PRPD) pattern recognition have been developed to check the insulation condition of HV substations. However, a common issue is how to determine the subsystem in which a critical PD source is located when there are several PD sources, and a critical one is near the boundary between two HV subsystems, e.g., a cavity defect located between a cable end and a GIS. The traveling direction of the detected PD is valuable information to determine the subsystem in which the insulation defect is located. However, incorrect diagnostics are usually due to the constraints of PD measuring systems and inadequate PD diagnostic procedures. This paper presents a diagnostic procedure using an appropriate PD analyzer with multiple HFCT sensors to carry out efficient insulation condition diagnoses. This PD procedure has been developed on the basis of laboratory tests, transient signal modeling, and validation tests. The validation tests were carried out in a special test bench developed for the characterization of PD analyzers. To demonstrate the effectiveness of the procedure, a real case is also presented, where satisfactory results are shown.

14 July 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Carlos Vera RomeroCarlos Vera Romero
Carlos Vera Romero
FGFernando Garnacho
Fernando Garnacho
JKJoni Kluss
Joni Kluss
CMChristian Mier
Christian Mier
FÁFernando Álvarez
Fernando Álvarez
ASAntonio Squicciarini
Antonio Squicciarini
The insulation condition of HVDC grids consisting of cable systems, GIS, and converters should be monitored by partial discharge (PD) analysers using artificial intelligence (AI) tools for efficient insulation diagnosis. Although there are many experiences of PD monitoring solutions developed for the supervision of the insulation condition of HVAC grids using PD analysers, there are no standardised requirements for their qualification available yet. The international technical specification TS IEC 62478 provides general rules for PD measurements using electromagnetic methods but does not define performance requirements for qualification tests. HVDC and HVAC PD analysers must be tested by unambiguous test procedures. This paper compiles experiences of using PD analysers with HFCT sensors in HVAC grids (cable systems, GIS, and AIS) to define a qualification procedure for HVAC systems. This procedure is applicable to HVDC grids (cable systems, GIS, AIS, and converters) because the particularities related to the insulation behaviour under HVDC voltage are also considered. Representative PD sources are discussed in HVAC and HVDC positive and negative polarity. The PD pulse trend of representative insulation defects in HVDC cable systems is quite different from that of HVAC grids. Special attention should be paid to the acquisition of PD signals in HVDC grids since few pulses appear in solid insulations, mainly during voltage changes (polarity reversals or surges), but rarely in continuous operation with constant direct voltage. A synthetic PD simulator has been developed to reproduce trains of PD pulses or noise signals, similar to those that can appear in the power network. A set of three functionality tests has been developed for qualification of the diagnostic capabilities of PD analysers working up to 30 MHz addressed to HVDC or HVAC grids: (1) PD recognition test, (2) PD clustering test, and (3) PD location test. This qualification procedure has been validated by means of a round-robin test performed by five research institutes (RISE, FFII, TUDelft, TAU, and UPM) using commercial and in-development AI PD recognition and clustering tools to demonstrate its robustness and applicability. Applying this qualification procedure, two PD methods for electrical detection and prevention of insulation defects have been approved, one for HVAC and the other for HVDC grids.

11 June 2024 in Sensors
Verified
Journal Article
Open access
PDF file
EÁEduardo Arcones del Álamo
Eduardo Arcones del Álamo
FÁFernando Álvarez
Fernando Álvarez
JOJavier Ortego
Javier Ortego
FGFernando Garnacho
Fernando Garnacho
During their lifespan, high-voltage (HV) electrical systems are subjected to operating conditions in which electrical, mechanical, thermal and environmental-related stresses occur. These conditions over time lead to unforeseen failures caused by various types of defects. For this reason, there are several technologies for measuring and monitoring the electrical systems, with the aim of minimizing the number of faults. The early detection of defects, preferably in their incipient state, will enable the necessary corrective actions to be taken in order to avoid unforeseen failures. These failures generally lead to human risks and material damage, lack of power supply and significant economic losses. An efficient maintenance technique for the early detection of defects consists of the supervision of the dielectrics status in the installations by means of on-line partial discharge (PD) measurement. Nowadays, there are numerous systems in the market for the measurement of PD in HV installations. The most efficient with a reasonable cost will be those that offer greater security guarantees and the best positioned in the market. Currently, technology developers and users of PD measuring systems face difficulties related to the lack of reference procedures for their complete characterization and to the technical and economic drawback of performing the characterization tests on site or in laboratory installations. To deal with the previous difficulties, in this paper a novel method for the complete and standardized characterization of PD measuring systems is presented. The applicability of this method is mainly adapted for the characterization of systems operating in on-line applications using high-frequency current transformer (HFCT) sensors. For the appropriate application of the method, an associated and necessary scale modular test platform is used. In the test platform, the real on-site measuring conditions of an HV insulated distribution line are simulated in a controlled way. Practical characterizations, showing the convenience and advantages of applying the method using the modular test platform, are also presented.