The aim of this study has been to develop a novel two-level multi-objective genetic algorithm (GA) to optimize time series forecasting data for fans used in road tunnels by the Swedish Transport Administration (Trafikverket). Level 1 is for the process of forecasting time series cost data, while level 2 evaluates the forecasting. Level 1 implements either a multi-objective GA based on the ARIMA model or a multi-objective GA based on the dynamic regression model. Level 2 utilises a multi-objective GA based on different forecasting error rates to identify a proper forecasting. Our method is compared with using the ARIMA model only. The results show the drawbacks of time series forecasting using only the ARIMA model. In addition, the results of the two-level model show the drawbacks of forecasting using a multi-objective GA based on the dynamic regression model. A multi-objective GA based on the ARIMA model produces better forecasting results. In level 2, five forecasting accuracy functions help in selecting the best forecasting. Selecting a proper methodology for forecasting is based on the averages of the forecasted data, the historical data, the actual data and the polynomial trends. The forecasted data can be used for life cycle cost (LCC) analysis.
7 October 2014 in Journal of Quality in Maintenance Engineering
Purpose: – The purpose of this paper is to analyse and compare the downtime of four drilling machines used in two underground mines in Sweden. The downtime of these machines was compared to show what problems affect downtime and which strategies should be applied to reduce it.Design/methodology/approach: – The study collects failure data from a two-year period for four drilling machines and performs reliability analysis. It also performs downtime analysis utilising a log-log diagram with a confidence interval.Findings: – There are notable differences in the downtime of most of the studied components for all machines. The hoses and feeder have relatively high downtime. Depending on their downtime, the significant components can be ranked in three groups. The downtime of the studied components is due to reliability problems. The study suggests the need to improve the reliability of critical components to reduce the downtime of drilling machines.Originality/value: – The method of analysing the downtime, identifying dominant factors and the interval estimation for the downtime, has never been studied on drilling machines. The research proposed in this paper provides a general method to link downtime analysis with potential component improvement. To increase the statistical accuracy; four case studies was performed in two different mines with completely different working environment and ore properties. Using the above method showed which components need to be improved and suggestions for improvement was proposed and will be implemented accordingly.
The purpose of this article is to develop a practical economic replacement decision model to identify the economic lifetime of a mining drilling machine. A data-driven optimization model was developed for operating and maintenance costs, purchase price, and machine resale value. Equivalent present value of these costs by using discount rate was considered. The proposed model shows that the absolute optimal replacement time (ORT) of a drilling machine used in one underground mine in Sweden is 115 months. Sensitivity and regression analysis show that the maintenance cost has the largest impact on the ORT of this machine. The proposed decision-making model is applicable and useful and can be implemented within the mining industry.
21 July 2014 in International Journal of Mining, Reclamation and Environment
Collecting the failure data and reliability analysis in an underground mining operation is challenging due to the harsh environment and high level of production pressure. Therefore, achieving an accurate, fast, and applicable analysis in a fleet of underground equipment is usually difficult and time consuming. This paper aims to discuss the main reliability analysis challenges in mining machinery by comparing three main approaches: two analytical methods (white-box and black-box modeling), and a simulation approach. For this purpose, the maintenance data from a fleet of face drilling rigs in a Swedish underground metal mine were extracted by the MAXIMO system over a period of two years and were applied for analysis. The investigations reveal that the performance of these approaches in ranking and the reliability of the studies of the machines is different. However, all mentioned methods provide similar outputs but, in general, the simulation estimates the reliability of the studied machines at a higher level. The simulation and white-box method sometimes provide exactly the same results, which are caused by their similar structure of analysis. On average, 9% of the data are missed in the white-box analysis due to a lack of sufficient data in some of the subsystems of the studies’ rigs.
11 May 2015 in Journal of Quality in Maintenance Engineering
Purpose: – The purpose of this paper is to present a practical model to determine the economic replacement time (ERT) of production machines. The objective is to minimise the total cost of capital equipment, where total cost includes acquisition, operating, maintenance costs and costs related to the machine’s downtime. The costs related to the machine’s downtime are represented by the costs of using a redundant machine. Design/methodology/approach: – In total, four years of cost data are collected. Data are analysed, practical optimisation model is developed and regression analysis is done to estimate the drilling rigs ERT. The artificial neural network (ANN) technique is used to identify the effect of factors influencing the ERT of the drilling rigs. Findings: – The results show that the redundant rig cost has the largest impact on ERT, followed by acquisition, maintenance and operating costs. The study also finds that increasing redundant costs per hour have a negative effect on ERT, while decreases in other costs have a positive effect. Regression analysis shows a linear relationship between the cost factors and ERT. Practical implications: – The proposed approach can be used by the decision maker in determining the ERT of production machines which used in mining industry. Originality/value: – The research proposed in this paper provides and develops an optimisation model for ERT of mining machines. This research also identifies and explains the factors that have the largest impact on the production machine’s ERT. This model for estimating the ERT has never been studied on mining drilling rigs.