There are many studies on fiber-reinforced polymer (FRP)-confined pre-damaged concrete under quasi-static strain rates. However, few studies have focused on FRP-confined pre-damaged concrete under high strain rates. Thus, an experimental and analytical investigation was conducted to obtain the mechanical behavior of FRP-confined pre-damaged concrete under different strain rates. The results show that the stress–strain curves, ultimate stress, and strain values were affected by strain rate and the extent of concrete damage. A stress–strain model of FRP-confined pre-damaged concrete considering the strain rate was developed by modifying a stress–strain model of FRP-confined pre-damaged concrete under quasi-static loading. The proposed model was evaluated by using test data. The evaluation results show that the proposed model can predict the stress–strain behavior of FRP-confined pre-damaged concrete under different strain rates.
Due to the large number of welding process parameters and the model output parameters, the prediction result of weld bead geometry using neural network in wire and arc welding test is not ideal. Therefore, multi-population genetic algorithm is introduced to optimize the initial weights and threshold of neural network in this paper, and this can avoid premature convergence. The performance between back propagation (BP) neural network and improved BP neural network prediction model are compared based on the designed verification samples, and the results show that the improved BP neural network model has higher accuracy. In addition, the improved BP neural network model is used to simulate the weld process, and the influence of the weld process parameters on weld bead geometry is revealed.
Cable system construction is one of the most risky construction stages of long‐span suspension bridges, and a reliable risk assessment is an important means to ensure the construction safety. This study proposes a risk assessment method for cable system construction of suspension bridges based on the cloud model, which can combine randomness and fuzziness of risk information effectively. First, a multilevel evaluation index system is built by disassembling the process of cable system construction. Next, the index weights are calculated by the uncertain analytic hierarchy process (AHP). Then, according to the cloud model, a risk assessment model for cable system construction of the suspension bridge is established by realizing the mutual transformation between qualitative language and quantified data. Finally, an illustrative example concerning the risk of cable system construction of Wuhan Yang‐Si‐Gang Yangtze River Bridge is provided to demonstrate the feasibility and objectivity of the proposed method.
The deterioration of high-penetration asphalt pavements due to oxidative aging presents a significant challenge in highway maintenance. This study investigates the rejuvenation effect of three bio-oils, namely palm oil, soybean oil, and sunflower oil, on aged PEN 90 asphalt through an integrated approach combining experimental characterization and molecular dynamics (MD) simulations. Laboratory evaluations, including penetration, softening point, dynamic shear rheology (DSR), and Fourier Transform Infrared (FTIR) spectroscopy, were conducted to quantify the recovery of the physical, rheological, and chemical properties of aged high-penetration asphalt. MD simulations were conducted to provide insights into diffusion behavior and intermolecular interactions between bio-oil molecules and aged asphalt components. Experimental results show that bio-oils effectively restore the lost viscoelastic performance after long-term aging. An 8% dosage was determined as optimal, with rejuvenation efficiency decreasing in the order of SSO, SO, and PO. MD simulations clarify mechanisms by showing that soybean and palm oils have higher diffusion efficiency than sunflower oil, thus promoting the dispersion of asphaltene and resin. RDF shows that bio-oils enhance asphalt molecules’ short-range order via hydrogen bonds and van der Waals forces, which improves compatibility.
1 January 2015 in Mathematical Problems in Engineering
Based on the nonlinear stability analysis method, the 3D nonlinear finite element model of a composite girder cable-stayed bridge with three pylons is established to research the effect of factors including geometric nonlinearity, material nonlinearity, static wind load, and unbalanced construction load on the structural stability during construction. Besides, the structural nonlinear stability in different construction schemes and the determination of temporary pier position are also studied. The nonlinear stability safety factors are calculated to demonstrate the rationality and safety of construction schemes. The results show that the nonlinear stability safety factors of this bridge during construction meet the design requirement and the minimum value occurs in the maximum double cantilever stage. Besides, the nonlinear stability of the structure in the side of edge-pylon meets the design requirement in the two construction schemes. Furthermore, the temporary pier can improve the structure stability, effectively, and the actual position is reasonable. In addition, the local buckling of steel girder occurs earlier than overall instability under load in some cable tension stages. Finally, static wind load and the unbalanced construction load should be considered in the stability analysis for the adverse impact.