Serik K. Moldabayev

Dr. Serik K. Moldabayev

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 June 2026 in Mathematics
Verified
Journal Article
Open access
PDF file
Dmytro BabetsDmytro Babets
Dmytro Babets
AYAmirbek Yerkinbekov
Amirbek Yerkinbekov
SMSerik K. Moldabayev
Serik K. Moldabayev
SASamal Assylkhanova
Samal Assylkhanova
VHVolodymyr Volodymyrovych Hnatushenko
Volodymyr Volodymyrovych Hnatushenko
OSOlena Sdvyzhkova
Olena Sdvyzhkova
This study presents an intelligent framework for the analysis of multidimensional geomechanical states in underground mining systems based on numerical simulation and machine learning methods. A three-dimensional geomechanical model of the Zholymbet deposit was developed in the RS3 environment using the generalized Hoek–Brown failure criterion. Numerical simulations were performed for representative mining scenarios characterized by complex excavation interaction and stress redistribution. The modelling results were transformed into a multidimensional geomechanical dataset containing stress, deformation, displacement, and yielding parameters. Principal component analysis (PCA) was applied to investigate the internal structure of the geomechanical state space and identify dominant patterns controlling the rock mass behavior. Clustering analysis revealed several geomechanical regimes corresponding to stable, transitional, and instability-prone conditions. Isolation Forest anomaly detection demonstrated that atypical geomechanical states are not randomly distributed but spatially localized near excavation systems and mining horizons. The obtained results indicate that hazardous geomechanical conditions are governed by complex interactions between stress concentration, deformation intensity, yielding processes, and excavation geometry. The proposed approach provides a basis for intelligent interpretation of large-scale numerical modelling results and may support geomechanical risk assessment in underground mining operations.

3 August 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
SMSerik K. Moldabayev
Serik K. Moldabayev
AKAlikhan Khairullayev
Alikhan Khairullayev
OSOlena Sdvyzhkova
Olena Sdvyzhkova
Dmytro BabetsDmytro Babets
Dmytro Babets
SASamal Assylkhanova
Samal Assylkhanova
Nurzhigit SarybayevNurzhigit Sarybayev
Nurzhigit Sarybayev
Designing interlevel pillars for deep, structurally complex vein deposits requires balancing rock mass stability against ore recovery. This study evaluates the geomechanical response of the Kenzhem area of the Akbakay gold deposit using a three-dimensional finite-element model that reproduces the lithological structure, irregular ore-body geometry, underground workings, and mined-out stopes. Four extraction scenarios were analyzed: complete extraction without pillars and mining with 10, 15, and 20 m inter-stope pillars. Stability was assessed using maximum total displacement, the extent and connectivity of yielded zones predicted by the generalized Hoek–Brown criterion, and numerical convergence. Pillarless extraction produced displacements of 2.6–3.0 m, a continuous yielded zone extending toward the surface, and loss of numerical convergence. A 10 m pillar reduced displacements to 0.50–0.66 m but did not provide a stable equilibrium state. Increasing the pillar thickness to 15 m reduced the maximum displacement to approximately 0.08 m, localized the yielded zones near excavation boundaries, and ensured convergence. A 20 m pillar produced only a minor additional reduction to 0.065–0.070 m without materially changing the failure pattern. Therefore, a 15 m inter-stope pillar provides the most rational balance between geomechanical safety and ore recovery under the investigated conditions.

15 September 2026 in Geosciences
Verified
Journal Article
Open access
PDF file
SMSerik K. Moldabayev
Serik K. Moldabayev
AKAlikhan Khairullayev
Alikhan Khairullayev
OSOlena Sdvyzhkova
Olena Sdvyzhkova
Dmytro BabetsDmytro Babets
Dmytro Babets
SASamal Assylkhanova
Samal Assylkhanova
Nurzhigit SarybayevNurzhigit Sarybayev
Nurzhigit Sarybayev
Designing interlevel pillars for deep, structurally complex vein deposits requires balancing rock mass stability against ore recovery. This study evaluates the geomechanical response of the Kenzhem area of the Akbakay gold deposit using a three-dimensional finite-element model that reproduces the lithological structure, irregular ore-body geometry, underground workings, and mined-out stopes. Four extraction scenarios were analyzed: complete extraction without pillars and mining with 10, 15, and 20 m inter-stope pillars. Stability was assessed using maximum total displacement, the extent and connectivity of yielded zones predicted by the generalized Hoek–Brown criterion, and numerical convergence. Pillarless extraction produced displacements of 2.6–3.0 m, a continuous yielded zone extending toward the surface, and loss of numerical convergence. A 10 m pillar reduced displacements to 0.50–0.66 m but did not provide a stable equilibrium state. Increasing the pillar thickness to 15 m reduced the maximum displacement to approximately 0.08 m, localized the yielded zones near excavation boundaries, and ensured convergence. A 20 m pillar produced only a minor additional reduction to 0.065–0.070 m without materially changing the failure pattern. Therefore, a 15 m inter-stope pillar provides the most rational balance between geomechanical safety and ore recovery under the investigated conditions.

30 June 2024 in Вестник КазУТБ
Verified
Journal Article
Open access
PDF file
SMSerik K. Moldabayev
Serik K. Moldabayev
AAA.A. Adamchuk
A.A. Adamchuk
Nurzhigit SarybayevNurzhigit Sarybayev
Nurzhigit Sarybayev
AMA.S. Moldabayev
A.S. Moldabayev
ANA.N. Nurmanova
A.N. Nurmanova
Different types of constructions of transshipment devices for combined schemes of automobile-conveyor transport are analyzed. A device of a new design was developed based on the identified shortcomings of known devices. The efficiency of the rock unloading device with through-passing trucks has been checked for the conditions of iron-ore mines in Kazakhstan. New device works because of rock weight force, which rotates bridges, that cover bunker for truck to move above it. Rotating bridges makes it possible to move rock down to bunker. After that, bridges close because of counterweight, which is a fence at the same time. The efficiency criteria of rock unloading device is volume reduce of mining capital works. Parameters were considered: width of the open-cast mine at the top and bottom, design depth of the mine, load capacity, turning radius and width of trucks, as well as the cost of extracting 1 m3 of rock. The dependence of reducing the costs of conducting mining capital works in deep open-cast mines during the construction of a transshipment point of combined automobile-conveyor transport with a through passage when unloading trucks from their carrying capacity have been established.