This study presents an intelligent framework for the analysis of multidimensional geomechanical states in underground mining systems based on numerical simulation and machine learning methods. A three-dimensional geomechanical model of the Zholymbet deposit was developed in the RS3 environment using the generalized Hoek–Brown failure criterion. Numerical simulations were performed for representative mining scenarios characterized by complex excavation interaction and stress redistribution. The modelling results were transformed into a multidimensional geomechanical dataset containing stress, deformation, displacement, and yielding parameters. Principal component analysis (PCA) was applied to investigate the internal structure of the geomechanical state space and identify dominant patterns controlling the rock mass behavior. Clustering analysis revealed several geomechanical regimes corresponding to stable, transitional, and instability-prone conditions. Isolation Forest anomaly detection demonstrated that atypical geomechanical states are not randomly distributed but spatially localized near excavation systems and mining horizons. The obtained results indicate that hazardous geomechanical conditions are governed by complex interactions between stress concentration, deformation intensity, yielding processes, and excavation geometry. The proposed approach provides a basis for intelligent interpretation of large-scale numerical modelling results and may support geomechanical risk assessment in underground mining operations.
Designing interlevel pillars for deep, structurally complex vein deposits requires balancing rock mass stability against ore recovery. This study evaluates the geomechanical response of the Kenzhem area of the Akbakay gold deposit using a three-dimensional finite-element model that reproduces the lithological structure, irregular ore-body geometry, underground workings, and mined-out stopes. Four extraction scenarios were analyzed: complete extraction without pillars and mining with 10, 15, and 20 m inter-stope pillars. Stability was assessed using maximum total displacement, the extent and connectivity of yielded zones predicted by the generalized Hoek–Brown criterion, and numerical convergence. Pillarless extraction produced displacements of 2.6–3.0 m, a continuous yielded zone extending toward the surface, and loss of numerical convergence. A 10 m pillar reduced displacements to 0.50–0.66 m but did not provide a stable equilibrium state. Increasing the pillar thickness to 15 m reduced the maximum displacement to approximately 0.08 m, localized the yielded zones near excavation boundaries, and ensured convergence. A 20 m pillar produced only a minor additional reduction to 0.065–0.070 m without materially changing the failure pattern. Therefore, a 15 m inter-stope pillar provides the most rational balance between geomechanical safety and ore recovery under the investigated conditions.
This study seeks to raise the operational efficiency and economic return of the Vasilkovskoye open-pit gold mine by integrating real-time ground-penetrating-radar (GPR) monitoring, geomechanical modeling, and digital optimization of drilling-and-blasting parameters. Continuous GPR scanning identified hazardous fracture zones that were subsequently characterized in DIPS and RS2 to model slope stability, while ShotPlus-based blast simulations and OrePro 3D displacement modeling guided the redesign of hole spacing, charge distribution, and delay timing. Fragmentation quality was verified with high-resolution photogrammetry and correlated to blast design through statistical analysis; a comparative techno-economic assessment quantified cost and dilution differentials between conventional and optimized schemes. The integrated workflow established a robust predictive link between blast geometry and fragment size, reducing oversize generation by 17% and ore dilution by 9%, while increasing gold grade in mill feed from 0.84 g t⁻¹ to 0.94 g t⁻¹. GPR-informed hazard mapping eliminated unplanned wall failures, and the revised pattern lowered specific explosive consumption without compromising fragmentation, cutting total unit costs by 8%. Unlike previous studies that treat slope stability and blasting as separate tasks, this study couples deformation dynamics with blast design in a single digital loop, offering a transferable framework for automation-ready, risk-aware mine planning at complex geological sites.
Designing interlevel pillars for deep, structurally complex vein deposits requires balancing rock mass stability against ore recovery. This study evaluates the geomechanical response of the Kenzhem area of the Akbakay gold deposit using a three-dimensional finite-element model that reproduces the lithological structure, irregular ore-body geometry, underground workings, and mined-out stopes. Four extraction scenarios were analyzed: complete extraction without pillars and mining with 10, 15, and 20 m inter-stope pillars. Stability was assessed using maximum total displacement, the extent and connectivity of yielded zones predicted by the generalized Hoek–Brown criterion, and numerical convergence. Pillarless extraction produced displacements of 2.6–3.0 m, a continuous yielded zone extending toward the surface, and loss of numerical convergence. A 10 m pillar reduced displacements to 0.50–0.66 m but did not provide a stable equilibrium state. Increasing the pillar thickness to 15 m reduced the maximum displacement to approximately 0.08 m, localized the yielded zones near excavation boundaries, and ensured convergence. A 20 m pillar produced only a minor additional reduction to 0.065–0.070 m without materially changing the failure pattern. Therefore, a 15 m inter-stope pillar provides the most rational balance between geomechanical safety and ore recovery under the investigated conditions.
В статье приведена методология секторального моделирования по периметру открытой горной выработки в программе RS3 компании Rocscience. Макромодель разбивается на секторальные модели меньшего масштаба радиально ориентированными плоскостями так, чтобы охватить потенциально неустойчивые области борта. Упругопластическая модель среды и критерий прочности Кулона-Мора реализованы в кодах программы RS3. Впервые на основе двухуровневого моделирования показано различие в определении коэффициента запаса устойчивости в зависимости от масштаба модели и степени отражения структуры грунтово-породного массива. Установлено распределение показателя устойчивости борта по периметру карьера и локализованы потенциальные поверхности скольжения в каждом из выделенных секторов карьера на основе процедуры «снижения сдвиговой прочности» (Shear Strength Reduction) Мақалада Rocscience компаниясының RS3 бағдарламасында ашық кеніштің периметрі бойынша секторлық модельдеу әдістемесі берілген. Макромодель тақтаның ықтимал тұрақсыз аймақтарын қамту үшін радиалды бағытталған жазықтықтар бойынша кішірек масштабтағы салалық модельдерге бөлінген. Ортаның эластопластикалық моделі және Кулон-Мор беріктік критерийі RS3 бағдарлама кодтарында жүзеге асырылады. Алғаш рет екі деңгейлі модельдеу негізінде модельдің масштабы мен топырақ-тау жынысы массивінің құрылымынын шағылысу дәрежесіне байланысты тұрақтылық коэффициентін анықтаудағы айырмашылық көрсетілген. Карьердің периметрі бойынша карьер беткейі тұрақтылығының таралу көрсеткіштері белгіленді және «сырғу беріктігін төмендету» процедурасы негізінде карьердің әрбір таңдалған секторында потенциалды сырғанау беттері анықталды The article presents the methodology of sector modeling along the perimeter of an open-pit mine in the RS3 program from Rocscience. The finite element 3D analysis of the stress-strain state (SSS) of the soil and rock mass is determined based on models of different scales. The macro-level model includes the entire quarry bowl and allows for a primary stability assessment due to changes in the general slope angle of the side along the quarry perimeter. The macro-model is then broken down into smaller-scale sector models by radially oriented planes so as to cover potentially unstable areas of the side. Sector models allow for a more detailed display of a complex line of benches, as well as simulating the layered structure of the massif. The elastic-plastic model of the medium and the Coulomb-Mohr strength criterion are implemented in the RS3 program codes. The distribution of the edge stability index along the quarry perimeter was determined and potential sliding surfaces were localized in each of the selected quarry sectors based on the «Shear Strength Reduction» procedure