Excavation in foundation pits can result in serious issues for nearby tunnel structures like deformation, differential settlement, and seepage damage, which profoundly impact project timelines and potentially endanger life and property safety. Therefore, it is imperative to investigate these impacts before and after construction and to facilitate timely adjustments of construction measures and reinforcement where possible. In this study, a foundation pit construction project near a rail transit line is employed as a case to comprehensive study the impact of on-site deep foundation pit excavation on adjacent rail transit structures by numerical simulation. A three-dimensional finite-element model of the foundation pit based on site geological characteristics and construction procedures is established to study the excavation and maintenance processes. Through analysis of key parameters including soil deformation, displacement, shear force, and bending moment of the tunnel structures, the designed protective structure is found to have effectively mitigated soil deformation, ensuring the stability of the foundation pit. As excavation progresses, lateral soil deformation and vertical uplift gradually increase but remain within specified control values. During various excavation stages, the maximum displacement of the tunnel structure gradually increases, with the increase rates of maximum settlement being 29.09%, 20.51%, and 6.45%, respectively. This indicates a gradual enhancement of the stability of the tunnel structure. Additionally, excavation of the foundation pit has a significant impact on the bending moment distribution of the tunnel structure but does not affect the axial force and shear force of the tunnel structure. The findings of this study offer crucial scientific insights for evaluating the safety and stability of construction near tunnel structures.
Urbanization and population concentration in China’s major cities drive high land utilization demands, affecting nearby bridges during underground construction. Foundation pit construction alters the internal forces, deformation, and displacement of bridge piles. To understand these impacts and assess excavation support rationality, a case study was conducted on an ultra-deep foundation pit near an elevated ring road bridge in Wuhan. Considering the engineering geological conditions of the project site, construction sequence, and traffic load on the bridge, a three-dimensional finite element model was established to simulate the impact of foundation pit excavation on the elevated structure. And through an analysis of tracked monitoring data from the construction site, comparisons were also made with the simulation results. The findings of this case study indicated that throughout the entire construction phase of the foundation pit, the maximum horizontal and vertical displacements of the bridge foundation structure caused by the construction are 2.98 mm and −1.75 mm, respectively; the maximum change rate of the bending moment in the bridge structure due to the foundation pit construction is 6.3%, while the change in the axial forces is small, and completely within the safety control standards for bridge structure displacement. By analyzing the monitoring data over three stages within one year after the completion of the foundation pit, it is shown that the bridge structure gradually tends to stabilize. Additionally, due to soil consolidation, its displacement shows uniform rebound and tends to stabilize. The research findings provide valuable reference points for the design and construction of similar deep foundation pit projects.
In urban metro construction, shield tunneling often needs to pass through building and bridge pile foundations, potentially affecting the stability of existing structures. Therefore, accurately assessing the impact of shield tunneling on bridges and buildings is crucial. This study presents a comprehensive prediction method combining numerical simulation and empirical formulas, taking the underpass project of the Shijiazhuang–Wuhan High-Speed Railway Bridge by Zhengzhou Metro Line 5 as a case study. Three-dimensional numerical model calculations were performed using finite element software to analyze the displacement and stress changes of buildings and tunnel structures at different construction stages, revealing the deformation patterns of buildings adjacent to the tunnel during shield tunneling. In particular, the ground settlement caused by twin-tunnel excavation was compared with Peck’s empirical formula to verify the reliability of the numerical simulation. The results show that twin-tunnel excavation exacerbates the horizontal displacement, uplift, and settlement of the ground, with maximum deformation rates increasing by 7.10%, 20%, and 11.4%, respectively. Comparing the ground deformation results of Peck’s empirical formulas with numerical calculations revealed similar trends in the settlement curves, with a maximum deviation of 6.67%. It can be concluded that using Peck’s empirical formula to calculate ground deformation characteristics complements the limitations of numerical simulations, making the assessment results more reliable. The findings of this study demonstrate that integrating numerical simulation with empirical formulas significantly enhances the reliability of deformation predictions in complex tunneling scenarios. This research not only offers a comprehensive safety assessment method for shield tunneling construction but also provides valuable guidance for the design and construction of similar projects, serving as a theoretical reference for future engineering endeavors.