Junzhou Huang

Prof. Junzhou Huang


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 June 2024 in Buildings
Verified
Journal Article
Open access
PDF file
JHJunzhou Huang
Junzhou Huang
JLJizhixian Liu
Jizhixian Liu
KGKai Guo
Kai Guo
CWCai Wu
Cai Wu
SYShan Yang
Shan Yang
YLYani Lu
Yani Lu
Excavation in foundation pits can result in serious issues for nearby tunnel structures like deformation, differential settlement, and seepage damage, which profoundly impact project timelines and potentially endanger life and property safety. Therefore, it is imperative to investigate these impacts before and after construction and to facilitate timely adjustments of construction measures and reinforcement where possible. In this study, a foundation pit construction project near a rail transit line is employed as a case to comprehensive study the impact of on-site deep foundation pit excavation on adjacent rail transit structures by numerical simulation. A three-dimensional finite-element model of the foundation pit based on site geological characteristics and construction procedures is established to study the excavation and maintenance processes. Through analysis of key parameters including soil deformation, displacement, shear force, and bending moment of the tunnel structures, the designed protective structure is found to have effectively mitigated soil deformation, ensuring the stability of the foundation pit. As excavation progresses, lateral soil deformation and vertical uplift gradually increase but remain within specified control values. During various excavation stages, the maximum displacement of the tunnel structure gradually increases, with the increase rates of maximum settlement being 29.09%, 20.51%, and 6.45%, respectively. This indicates a gradual enhancement of the stability of the tunnel structure. Additionally, excavation of the foundation pit has a significant impact on the bending moment distribution of the tunnel structure but does not affect the axial force and shear force of the tunnel structure. The findings of this study offer crucial scientific insights for evaluating the safety and stability of construction near tunnel structures.

18 August 2024 in Buildings
Verified
Journal Article
Open access
PDF file
JHJunzhou Huang
Junzhou Huang
JYJun Yan
Jun Yan
KGKai Guo
Kai Guo
XYXingyue Yang
Xingyue Yang
SPSheng Peng
Sheng Peng
CWCai Wu
Cai Wu
Urbanization and population concentration in China’s major cities drive high land utilization demands, affecting nearby bridges during underground construction. Foundation pit construction alters the internal forces, deformation, and displacement of bridge piles. To understand these impacts and assess excavation support rationality, a case study was conducted on an ultra-deep foundation pit near an elevated ring road bridge in Wuhan. Considering the engineering geological conditions of the project site, construction sequence, and traffic load on the bridge, a three-dimensional finite element model was established to simulate the impact of foundation pit excavation on the elevated structure. And through an analysis of tracked monitoring data from the construction site, comparisons were also made with the simulation results. The findings of this case study indicated that throughout the entire construction phase of the foundation pit, the maximum horizontal and vertical displacements of the bridge foundation structure caused by the construction are 2.98 mm and −1.75 mm, respectively; the maximum change rate of the bending moment in the bridge structure due to the foundation pit construction is 6.3%, while the change in the axial forces is small, and completely within the safety control standards for bridge structure displacement. By analyzing the monitoring data over three stages within one year after the completion of the foundation pit, it is shown that the bridge structure gradually tends to stabilize. Additionally, due to soil consolidation, its displacement shows uniform rebound and tends to stabilize. The research findings provide valuable reference points for the design and construction of similar deep foundation pit projects.

27 August 2024 in Symmetry
Verified
Journal Article
Open access
PDF file
JHJunzhou Huang
Junzhou Huang
JLJizhixian Liu
Jizhixian Liu
KGKai Guo
Kai Guo
SYShan Yang
Shan Yang
YLYani Lu
Yani Lu
CWCai Wu
Cai Wu
In urban metro construction, shield tunneling often needs to pass through building and bridge pile foundations, potentially affecting the stability of existing structures. Therefore, accurately assessing the impact of shield tunneling on bridges and buildings is crucial. This study presents a comprehensive prediction method combining numerical simulation and empirical formulas, taking the underpass project of the Shijiazhuang–Wuhan High-Speed Railway Bridge by Zhengzhou Metro Line 5 as a case study. Three-dimensional numerical model calculations were performed using finite element software to analyze the displacement and stress changes of buildings and tunnel structures at different construction stages, revealing the deformation patterns of buildings adjacent to the tunnel during shield tunneling. In particular, the ground settlement caused by twin-tunnel excavation was compared with Peck’s empirical formula to verify the reliability of the numerical simulation. The results show that twin-tunnel excavation exacerbates the horizontal displacement, uplift, and settlement of the ground, with maximum deformation rates increasing by 7.10%, 20%, and 11.4%, respectively. Comparing the ground deformation results of Peck’s empirical formulas with numerical calculations revealed similar trends in the settlement curves, with a maximum deviation of 6.67%. It can be concluded that using Peck’s empirical formula to calculate ground deformation characteristics complements the limitations of numerical simulations, making the assessment results more reliable. The findings of this study demonstrate that integrating numerical simulation with empirical formulas significantly enhances the reliability of deformation predictions in complex tunneling scenarios. This research not only offers a comprehensive safety assessment method for shield tunneling construction but also provides valuable guidance for the design and construction of similar projects, serving as a theoretical reference for future engineering endeavors.

14 July 2025 in Materials
Verified
Journal Article
Open access
PDF file
JHJunzhou Huang
Junzhou Huang
LDLan Deng
Lan Deng
HGHaotian Gao
Haotian Gao
CWCai Wu
Cai Wu
JLJuan Li
Juan Li
DZDaopei Zhu
Daopei Zhu
This study presents an innovative solution to improve the mechanical performance of traditional cemented tailings backfill (CTB) by incorporating 3D-printed polymer lattice (3DPPL) reinforcements. We systematically investigated three distinct 3DPPL configurations (four-column FC, six-column SC, and cross-shaped CO) through comprehensive experimental methods including Brazilian splitting tests, digital image correlation (DIC), and scanning electron microscopy (SEM). The results show that the 3DPPL reinforcement significantly enhances the CTB’s tensile properties, with the CO structure demonstrating the most substantial improvement—increasing the tensile strength by 85.6% (to 0.386 MPa) at a cement-to-tailings ratio of 1:8. The 3DPPL-modified CTB exhibited superior ductility and progressive failure characteristics, as evidenced by multi-stage load-deflection behavior and a significantly higher strain capacity (41.698–51.765%) compared to unreinforced specimens (2.504–4.841%). The reinforcement mechanism involved synergistic effects of macroscopic truss behavior and microscopic interfacial bonding, which effectively redistributed the stress and dissipated energy. This multi-scale approach successfully transforms CTB’s failure mode from brittle to progressive while optimizing both strength and toughness, providing a promising advancement for mine backfill material design.

4 February 2026 in Infrastructures
Verified
Journal Article
Open access
PDF file
CHChengze Huang
Chengze Huang
JLJizhixian Liu
Jizhixian Liu
JHJunzhou Huang
Junzhou Huang
PFPei Fu
Pei Fu
SYShan Yang
Shan Yang
CWCai Wu
Cai Wu
With the increasing density of urban underground space development, the soil disturbance induced by large-section rectangular pipe jacking poses a significant threat to the safety of underlying subway tunnels. Taking the Lihe Road utility tunnel project in Wuhan, which crosses over Metro Line 4, as the engineering background, a three-dimensional finite element (FE) model was established using Midas GTS NX to simulate the entire pipe jacking process. Field monitoring data from caisson excavation, ground improvement, pipe jacking, and backfill grouting were introduced for validation, enabling a systematic investigation of the influence mechanism of pipe jacking on existing tunnels. In the numerical simulation, the modified Mohr–Coulomb constitutive model was adopted for the soil, and a “portal-type” reinforcement system was introduced. The pipe jacking process was simulated equivalently with a 1.2 m advance per cycle. The results indicate that the ground settlement induced by pipe jacking exhibits a stage-wise accumulation pattern and eventually develops into a stable settlement trough. The vertical settlement of the tunnel follows an evolutionary law of “early occurrence in the near field, delayed response in the far field, and final convergence,” with peak settlements of 2.44 mm and 2.53 mm for the left and right lines, respectively. Ground improvement significantly mitigates soil deformation, reducing the maximum surface settlement from 45.5 mm to 11.1 mm, decreasing the tunnel’s peak vertical settlement by 37%, and reducing horizontal displacement by 64%, thereby effectively suppressing lateral soil extrusion. The proposed closed-loop analysis method of “numerical simulation–monitoring validation–measure evaluation” reveals the spatiotemporal evolution law of soil–tunnel interaction during pipe jacking construction and provides valuable reference for risk control in similar engineering projects.